These apartments in Bangalore are perfect for first-time buyers and investors seeking affordable, modern, and spacious flats in prime locations with trusted real estate support."
Overview
DS Max Samyak
Overview
DS Max Samyak
Overview
DS Max Samyak
Overview
Photo: DS MAX SAMYAKTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC Bengaluru · Survey 100
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 15 Dec 2022 | |
| Escrow bank | STATE BANK OF INDIA · SME Branch, Mahadevapura, Bengaluru |
Data room
138 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
These apartments in Bangalore are perfect for first-time buyers and investors seeking affordable, modern, and spacious flats in prime locations with trusted real estate support."
For those seeking affordable yet modern flats in Bangalore , DS-MAX samyak provides trusted real estate options with excellent infrastructure and amenities
I was searching for flats with good connectivity and modern amenities, and DS-MAX Samyak Bangalore exceeded my expectations trusted real estate at its best, providing quality homes for families and investors alike
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 2 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Abh SamrddhiLapsed · completion date passed | B V TARAKESHWARI | Plot | ~940–1,200 sqft (estimate: filed carpet plus 25%) | Feb 2026 |
| Aprameya PrasiddhiCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Arohana SerenityCompleted (regulator flag) | Nagaraja B | Plot | ~570–1,790 sqft (estimate: filed carpet plus 25%) | Completed |
| Byraveshwara LayoutLapsed · completion date passed | Channappa and Puttalakshmamma | Plot | ~800–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2024 |
| Cm1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 334 sqft carpet (as filed) | Feb 2025 |
| Dmr LegacyRegistered · no quarterly update yet | Individual promoter (named in the filing) | Plot | ~1,390–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Ds Max SatelliteCompleted · OC 24-04-2020 | DS-MAX PROPERTIES PRIVATE LIMITED | Apartment | – | Completed |
| Ds Max Star NestCompleted · OC 04-04-2020 | K V SATISH | Apartment | – | Completed |
8 of 44 other projects in Kengeri, A to Z. Status is taken from each project's own filing.
All 49 projects in Kengeri → · DS-Max Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open DS Max Samyak in the interactive atlas
Approval or registration
Khata issued
E Khatha · Ramoahalli Gramapanchayath · Survey 100
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BEAPRA/NAMA/A.SA/A.A-1/THA.SA-4/N.P.K.L/01/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/150223/005721
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 100 | |
|---|---|---|
| Land extent, Sy 100 | 2 Acres 36 Guntas | |
| Owner kind, Sy 100 | Individual | |
| Share as printed, Sy 100 | 35 | |
| Owner as printed, Sy 100 | ||
| Owner kind, Sy 100 | Individual | |
| Share as printed, Sy 100 | 35 | |
| Owner as printed, Sy 100 | ||
| Owner kind, Sy 100 | Individual | |
| Share as printed, Sy 100 | 35 | |
| Owner as printed, Sy 100 |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 15 Dec 2022 · No. BEAPRA/NAMA/A.SA/A.A-1/THA.SA-4/N.P.K.L/01/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/274/2022 · issued 5 Sep 2022 · building height 44.95 m | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-334539 · issued 23 Nov 2022 · valid until 22 Nov 2027 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jan 2028 |
| Land conversion | Converted 11 Jul 2017 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 100 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 117 m² 50%2BHK · avg 91 m² 45.2%4BHK · avg 147 m² 4.8%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 271 | 977 |
| 3BHK | 300 | 1,258 |
| 4BHK | 29 | 1,586 |
| Sold, Q2 2026-27 | 210 / 600 | |
|---|---|---|
| Unsold, Q2 2026-27 | 390 | |
| Months to sell, derived from filed bookings | 95 months |
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Good Earth Cadence, price locked; Good Earth Ochre, price locked.
| Good Earth Cadence | 3.2 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | 3.4 km | Locked | |
| Samaya Sunshine | about 7 km | Locked | |
| Sumadhura Pramoda | about 8.5 km | Locked |
| DS Max Samyak This project | This project is the point the others are measured from | 31 Jan 2028 | 35% (210 of 600) | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | 3.2 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | 3.4 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Samaya Sunshine | about 7 km |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (mixed), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 490 m from the filed location | Clear |
| Nearest government-flagged flood location | 5.0 km, Kengeri Yellamma temple |
| Nearest storm drain | 1.2 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 290 m to the north-east, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 0.68 (408 covered spaces for 600 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it

| Main structure | 100% · planned by 8 Oct 2025 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 17 Nov 2027 | |
| Club house | Not started | |
| Completion | 100% |
| Schedule end | 31 Jan 2028 | |
|---|---|---|
| RERA completion date | 31 Jan 2028 | |
| Work began, as filed | 1 Jan 2023 |
| Building heights, fire NOC | 44.95 m on the fire NOC · 44.7 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 24 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/274/2022 · issued 5 Sep 2022 · building height 44.95 m | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 12 Jan 2023 · site inspected 11 Jan 2023 | |
| Chartered accountant's certificate, registration | Dated 21 Jan 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹19.36 Cr 13.9%Development · ₹119.85 Cr 86.1%
| Estimated cost, at registration | ₹139.21 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹96.18 Cr | |
| Estimated cost, engineer's certificate | ₹96.18 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹119.85 Cr |
Sold (210) 35%Unsold (390) 65%
| Sold, Q3 2025-26 | 173 / 600 · 427 available | |
|---|---|---|
| Sold, Q4 2025-26 | 187 / 600 · 413 available | |
| Sold, Q1 2026-27 | 194 / 600 · 406 available | |
| Sold, Q2 2026-27 | 210 / 600 · 390 available | |
| Unsold, Q2 2026-27 | 390 | |
| Sold in Q4 2025-26 | 14 | |
| Sold in Q1 2026-27 | 7 | |
| Sold in Q2 2026-27 | 16 |
| Escrow bank | STATE BANK OF INDIA · SME Branch, Mahadevapura, Bengaluru | |
|---|---|---|
| Designated account, collected | ₹15.97 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹16.69 Cr in Q2 2026-27 | |
| Net amount withdrawable, Form 4 | ₹78,28,67,873 | |
| Share of collections deposited in escrow | 100% |
| K-RERA registrations under this promoter | 47 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Other phases under this promoter name | 39 | |
| With a filed extension or completion | 22 (19 completed, 3 extended) | |
| Average schedule slip | 22 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Land area of this registration | 11,735 sq m |
|---|
| Khata | E Khatha · Ramoahalli Gramapanchayath · 1 Jan 2018 |
|---|
| Sale deed | 31 Aug 2017 |
|---|
| Sobha Royal Crest | about 10.5 km | Locked |
|---|
| Jhanavi Trishul Alaska | 10.8 km | Locked |
|---|
| Axis Amarissa | about 11 km | Locked |
|---|
| Garden Square | 11.4 km | Locked |
|---|
| Harivishram | about 11.5 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 12 km | Locked |
|---|
| Srivara Vasudha | about 12 km | Locked |
|---|
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Sumadhura Pramoda | about 8.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Sobha Royal Crest | about 10.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Jhanavi Trishul Alaska | 10.8 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Projects within 4 km, counted | 14 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 3,479 | |
| Booked | 1,833 of 3,479 (53%) | |
| Unsold | 1,646 | |
| Booked a month, pooled | 28 flats | |
| Months to sell, pooled | 33 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 4.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.2 km to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 784 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.8 km, Challaghatta | |
| Metro, under construction | 17.2 km, Kalena Agrahara |
| Kempegowda Airport | 56.2 | 60 | 44.5 |
| MG Road (CBD) | 23.4 | 29 | 19.8 |
| Manyata Tech Park | 33.7 | 39 | 25.8 |
| ITPL, Whitefield | 40.6 | 47 | 33.9 |
| Ecospace, Bellandur ORR | 37.2 | 40 | 26.5 |
| Electronic City Ph 1 | 34.0 | 30 | 26.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 760 m to the north-east, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.2 km to the east |