This is a small apartment complex in Bangalore.
Overview
Atri Nest
Overview
Atri Nest
Overview
Atri Nest
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 24 Jul 2019 |
|---|
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹1.10 Cr |
|---|
Loan & collateral
| Records searched to | 24 Jul 2019 | Review |
|---|---|---|
| Escrow bank | STATE BANK OF INDIA · Rajarajeshwari Nagar |
Data room
45 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
This is a small apartment complex in Bangalore.
Locality is good and Decent maintenance.. There is no proper cross ventilation and during summer it’s very difficult to live.. There are no windows in a room with just balcony door especially in ground floor it’s difficult to keep it open…
This apartment sits just behind papareddy palya bus stop. It's very calm and quite. It has got its own parking space underground. The flats on this apartment are built in very professionally planned manner.Lots of air and light flows…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| Akira Apartment (Nanjundeshwara Enclave)Lapsed · completion date passed | S V CONSULTANTS AND ENGINEERS | Apartment | – | Dec 2020 |
| Akshaya EnclaveRegistered · no quarterly update yet | AKSHAYA BUILDERS | Apartment | 646–1,084 sqft carpet (as filed) | Dec 2027 |
| Anika Redwood HomesWithdrawn | Anika Developers | Mixed development | 918 sqft carpet (as filed) | Dec 2019 |
| Anika Redwood HomesCompleted · OC 13-01-2022 | Anika Developers | Apartment | – | Completed |
| Baldota ElegantLapsed · completion date passed | MC Baldota | Apartment | – | Nov 2017 |
| Birla TisyaActive · 100% built | Birla Estates | Apartment | 1,250–2,500 sqft | 2026 |
| Ds Max SplendidCompleted · OC 20-12-2018 | DS MAX PROPERTIES PVT LTD | Apartment | – | Completed |
| Govianu NakshathraCompleted · OC 29-07-2025 | Mahesh Govindaraju | Apartment | 858 sqft carpet (as filed) | Completed |
8 of 51 other projects in Magadi Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Atri Nest in the interactive atlas
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 2 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 994 sq m |
|---|
| RERA extensions |
|---|
| None on the filing |
| RERA completion date | 30 Mar 2023 |
|---|
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Birla Tisya | about 4.5 km | Locked |
|---|
| Sumadhura Pramoda | about 4.5 km | Locked |
|---|
| Sobha Royal Crest | about 6 km | Locked |
|---|
| Vista Padmalaya | about 7 km | Locked |
|---|
| Samaya Sunshine | about 7 km | Locked |
|---|
| Royal Enclave | about 7.5 km | Locked |
|---|
| Renaissance Srichakra | about 8 km | Locked |
|---|
| Adarsh Premia | about 8.5 km | Locked |
|---|
| Garden Square | about 9 km | Locked |
|---|
| Song Of Wind | about 9 km | Locked |
|---|
| Vista Svara | about 9.5 km | Locked |
|---|
| Good Earth Ochre | about 10 km | Locked |
|---|
| Atri Nest This project | This project is the point the others are measured from | 30 Mar 2023 | – | Not verified yet |
|---|---|---|---|---|
| Birla Tisya | about 4.5 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Sumadhura Pramoda | about 4.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Sobha Royal Crest | about 6 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Vista Padmalaya | about 7 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Samaya Sunshine | about 7 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Royal Enclave | about 7.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Projects within 4 km, counted | 5 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 526 | |
| Booked | 207 of 526 (39%) | |
| Unsold | 319 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 39 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Kengunta, Near Mallathalli |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Malathahalli |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Possession, agreement | 30 Jun 2022 | |
|---|---|---|
| RERA completion date | 30 Mar 2023 | Red flag |
| Work began, as filed | 1 Jun 2019 |
| Structure | RCC structure |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) |
| Escrow bank | STATE BANK OF INDIA · Rajarajeshwari Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4 km, Attiguppe | |
| Metro, under construction | about 11 km, Shivaji Nagar |
| Kempegowda Airport | 43 | 34 |
| MG Road (CBD) | 15.5 | 11 |
| Manyata Tech Park | 20 | 15.5 |
| ITPL, Whitefield | 33 | 25.5 |
| Ecospace, Bellandur ORR | 25.5 | 20 |
| Electronic City Ph 1 | 38.5 | 24 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Mallathahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Srigandhakavalu on OpenStreetMap |