Overview
Akshaya Enclave
Overview
Akshaya Enclave
Overview
Akshaya Enclave
Overview
Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 13 Aug 2024 · No. BBMP/Ad.com./RJH/0850/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 101 m² 82.1%2BHK 17.9%
Location & risks
Construction & progress
Developer
Land · ₹74.7 L 6.1%Development · ₹11.46 Cr 93.9%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 13 Aug 2024 | |
| Escrow bank | HDFC · NAGARBHAVI |
Data room
79 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Akira Apartment (Nanjundeshwara Enclave)Lapsed · completion date passed | S V CONSULTANTS AND ENGINEERS | Apartment | – | Dec 2020 |
| Anika Redwood HomesWithdrawn | Anika Developers | Mixed development | 918 sqft carpet (as filed) | Dec 2019 |
| Anika Redwood HomesCompleted · OC 13-01-2022 | Anika Developers | Apartment | – | Completed |
| Atri NestLapsed · completion date passed | A3 Developers | Apartment | 617 sqft carpet (as filed) | Mar 2023 |
| Baldota ElegantLapsed · completion date passed | MC Baldota | Apartment | – | Nov 2017 |
| Birla TisyaActive · 100% built | Birla Estates | Apartment | 1,250–2,500 sqft | 2026 |
| Ds Max SplendidCompleted · OC 20-12-2018 | DS MAX PROPERTIES PVT LTD | Apartment | – | Completed |
| Govianu NakshathraCompleted · OC 29-07-2025 | Mahesh Govindaraju | Apartment | 858 sqft carpet (as filed) | Completed |
8 of 51 other projects in Magadi Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Akshaya Enclave in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 18 May 2024 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 29 Mar 2003 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 579/269/195/06 (Site No 6) |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 5 | 3,229 |
| 3BHK | 23 | 24,940 |
| Sumadhura Pramoda | about 4 km | Locked | |
|---|---|---|---|
| Birla Tisya | about 6 km | Locked | |
| Samaya Sunshine | about 6 km | Locked | |
| Sobha Royal Crest | about 6.5 km | Locked | |
| Vista Padmalaya | about 8.5 km | Locked | |
| Good Earth Ochre | about 8.5 km | Locked | |
| Garden Square | about 9 km | Locked | |
| Song Of Wind | about 9 km | Locked | |
| Adarsh Premia | about 9 km | Locked | |
| Good Earth Cadence | about 9 km | Locked | |
| Royal Enclave | about 9.5 km | Locked | |
| Renaissance Srichakra | about 10 km | Locked |
| Akshaya Enclave This project | This project is the point the others are measured from | 31 Dec 2027 | – | Not verified yet |
|---|---|---|---|---|
| Sumadhura Pramoda | about 4 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Birla Tisya | about 6 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Samaya Sunshine | about 6 km | 31 Dec 2026 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Mallathahalli lake inlet Muddaiahna palya road |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Malathahalli |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.82 (51 covered spaces for 28 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Oct 2024 |
| Building heights, fire NOC | 11.48 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 15 sq m |
|---|
| Architect's certificate, registration | Dated 15 Feb 2025 · site inspected 12 Feb 2025 | |
|---|---|---|
| Engineer's certificate, registration | Dated 15 Feb 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹12.21 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹10.18 Cr |
| Escrow bank | HDFC · NAGARBHAVI |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 33% (8 of 24) |
| Locked |
| Sobha Royal Crest | about 6.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Vista Padmalaya | about 8.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Good Earth Ochre | about 8.5 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
|---|
| Projects within 4 km, counted | 8 (8 with an approximate location) | |
|---|---|---|
| Flats in them | 1,411 | |
| Booked | 605 of 1,411 (43%) | |
| Unsold | 806 | |
| Booked a month, pooled | 24 flats | |
| Months to sell, pooled | 29 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4 km, Jnanabharathi | |
| Metro, under construction | about 12.5 km, Lakkasandra |
| Kempegowda Airport | 46 | 35.5 |
| MG Road (CBD) | 16.5 | 12.5 |
| Manyata Tech Park | 23.5 | 17 |
| ITPL, Whitefield | 33.5 | 27 |
| Ecospace, Bellandur ORR | 26 | 21 |
| Electronic City Ph 1 | 36.5 | 24.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Mallathahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km to the south-west |