Overview
August Grand
Overview
August Grand
Overview
August Grand
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2018 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹3.87 Cr 7.7%Development · ₹46.38 Cr 92.3%
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · SBI INCUBE BRANCH |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 4 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
| Coco NestLapsed · completion date passed | Hatha Homes Pvt Ltd | Apartment | – | Apr 2023 |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open August Grand in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 4,976 sq m |
|---|
| Satori Residence By Genurise | about 0.5 km | Locked |
|---|
| Adarsh Rosewood | about 1 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 2 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 2 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 2 km | Locked |
|---|
| Mana Jardin Neo | about 2.5 km | Locked |
|---|
| Haven Phase 2 | about 2.5 km | Locked |
|---|
| 63 Degree East - Tower E | about 3 km | Locked |
|---|
| Adarsh Parkland | about 3.5 km | Locked |
|---|
| Birla Evara | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | Locked |
|---|
| August Grand This project | This project is the point the others are measured from | 31 Dec 2018 | – | Not verified yet |
|---|---|---|---|---|
| Satori Residence By Genurise | about 0.5 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Adarsh Rosewood | about 1 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 2 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 2 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 2 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
| Mana Jardin Neo | about 2.5 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
| Projects within 4 km, counted | 83 (83 with an approximate location) | |
|---|---|---|
| Flats in them | 23,301 | |
| Booked | 13,842 of 23,301 (59%) | |
| Unsold | 9,459 | |
| Booked a month, pooled | 322 flats | |
| Months to sell, pooled | 28 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Doddakannelli |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development |
| Schedule end | 30 Dec 2018 | |
|---|---|---|
| RERA completion date | 31 Dec 2018 | |
| Work began, as filed | 29 May 2014 |
| Estimated cost, at registration | ₹50.25 Cr |
|---|
| Escrow bank | STATE BANK OF INDIA · SBI INCUBE BRANCH |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 6 km, Singasnadra | |
| Metro, under construction | about 2.5 km, Bellandur |
| Kempegowda Airport | 32.5 |
| MG Road (CBD) | 12 |
| Manyata Tech Park | 17 |
| ITPL, Whitefield | 10 |
| Ecospace, Bellandur ORR | 2 |
| Electronic City Ph 1 | 8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |