What is the 2 bhk price in these appartment
Overview
Balaji Monarch
Overview
Balaji Monarch
Overview
Balaji Monarch
Overview
Photo: Sri Balaji MonarchTitle & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹56.00 Cr |
|---|
Loan & collateral
| Escrow bank | ANDHRA BANK · DODDAKANNAHALLI |
|---|
Data room
70 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
What is the 2 bhk price in these appartment
Best place to live, as Hitesh Singh from Zepto stays here
Beautiful and peaceful apartment to live in
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| August GrandCompleted (regulator flag) | August Ventures Private Limited | Apartment | 1,944 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
| Coco NestLapsed · completion date passed | Hatha Homes Pvt Ltd | Apartment | – | Apr 2023 |
8 of 44 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
All 46 projects in Bellandur → · Sri Balaji Builders's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Balaji Monarch in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2020 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 13 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked; Satori Residence By Genurise, price locked; Adarsh Rosewood, price locked; 63 Degree East - Tower E, price locked; Birla Evara, price locked; SOBHA Neopolis, price locked; Adarsh Parkland, price locked; SOBHA Ayana, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked.
| Balaji Monarch This project | This project is the point the others are measured from | 30 Dec 2020 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | 880 m | 30 Jun 2026 | 100% (113 of 113) | Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 880 m | 30 Jun 2026 | 100% (151 of 151) | Locked |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 880 m | 30 Jun 2026 | 100% (227 of 227) | Locked |
| Mana Jardin Neo | 1.0 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
| Satori Residence By Genurise | 1.3 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Adarsh Rosewood | 1.8 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Rent, 4BHK, 3 km | ₹86,500 /mo · 22 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹68,500 /mo · 251 listings | |
| Rent, 2BHK, 3 km | ₹42,000 /mo · 339 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 122 listings | |
| Rent per sq ft, 3 km | ₹40.0 /mo, as listed · 333 listings with a size |
| Projects within 4 km, counted | 109 (42 with an approximate location) | |
|---|---|---|
| Flats in them | 34,100 | |
| Booked | 19,120 of 34,100 (56%) | |
| Unsold | 14,980 | |
| Booked a month, pooled | 474 flats | |
| Months to sell, pooled | 29 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business) | |
|---|---|---|
| Nearest government-flagged flood location | 1.6 km, Doddakannelli |
| Nearest storm drain | 470 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 450 m to the north-east, an unnamed pond |
| Completion | Completed, occupancy certificate 4 Dec 2020 |
|---|
| Schedule end | 15 Aug 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2020 | |
| Work began, as filed | 1 Mar 2018 |
| Wall thickness | External walls: 6"; Internal walls: 4" |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Flooring | Vitrified tiles | |
|---|---|---|
| Toilet tiles | Ceramic tiles (floor) | |
| Wiring | Concealed copper wiring |
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Sold (43) 56.6%Unsold (33) 43.4%
| Flats sold, at completion | 43 | |
|---|---|---|
| Flats unsold, at completion | 33 | |
| Flats in the phase | 76 |
| Escrow bank | ANDHRA BANK · DODDAKANNAHALLI |
|---|
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 4 | |
| Other phases under this promoter name | 263 | |
| With a filed extension or completion | 119 (85 completed, 34 extended) | |
| Average schedule slip | 9 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 170 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 470 m to the north-west, tertiary drain | |
|---|---|---|
| Ground level | 897 m above sea level, plus or minus 4 m | |
| Metro, operational | 6.9 km, Beratena Agrahara | |
| Metro, under construction | 3.7 km, Kadubeesanahalli |
| Kempegowda Airport | 48.7 | 50 | 32.7 |
| MG Road (CBD) | 16.5 | 24 | 13.9 |
| Manyata Tech Park | 24.0 | 32 | 18.2 |
| ITPL, Whitefield | 15.4 | 18 | 9.6 |
| Ecospace, Bellandur ORR | 6.8 | 12 | 3.7 |
| Electronic City Ph 1 | 13.8 | 19 | 7.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.5 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.2 km to the south-east |