Title & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 29 Sep 2021 · No. CC/48/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 60 m² 78.9%3BHK 21.1%
Location & risks
Construction & progress
Developer
Land · ₹7.31 Cr 27.2%Development · ₹19.58 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 29 Sep 2021 | |
| Escrow bank | IDFC FIRST BANK · BANGALORE-BASAVESHWARA |
Data room
109 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 1 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aureal Vardhaman in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC | KSFES/NOC/157/2021 · issued 9 Sep 2021 · building height 14.95 m | Clear |
|---|
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | |
| Registration status | Withdrawn | Red flag |
| Land conversion | Converted 3 Feb 2005 · Tahasildar Anekal Taluk | |
|---|---|---|
| Survey numbers | 150200103200121510 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 56 | 35,876 |
| 3BHK | 15 | 9,634 |
| Abhee Serenity Springs | about 2 km | Locked | |
|---|---|---|---|
| Vasuki Vallabha | about 2.5 km | Locked | |
| Ramky One Karnival | about 3 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 3 km | Locked | |
| Sowmya Skyla | about 3.5 km | Locked | |
| Signature Heights | about 6 km | Locked | |
| Aiikya Forestscape | about 6 km | Locked | |
| Assetz Ren & Rei | about 7 km | Locked | |
| Assetz Muse & Maison | about 7.5 km | Locked | |
| Mahidhara Harmony | about 7.5 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 7.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 7.5 km | Locked |
| Aureal Vardhaman This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Abhee Serenity Springs | about 2 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
| Vasuki Vallabha | about 2.5 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
| Ramky One Karnival |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 7.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.11 (79 covered spaces for 71 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 31 Dec 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 24 Jan 2022 |
| Building heights, fire NOC | 14.95 m on the fire NOC · 15 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Fire safety | KSFES/NOC/157/2021 · issued 9 Sep 2021 · building height 14.95 m | |
|---|---|---|
| Architect's certificate, registration | Dated 28 Dec 2021 · site inspected 25 Dec 2021 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹26.90 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹19.58 Cr |
| Escrow bank | IDFC FIRST BANK · BANGALORE-BASAVESHWARA | |
|---|---|---|
| Registration at K-RERA | Withdrawn |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3 km |
| 30 Dec 2026 |
| 77% (389 of 503) |
| Locked |
| Shriram Sapphire (Codename Ultimate) | about 3 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
|---|
| Sowmya Skyla | about 3.5 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Signature Heights | about 6 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
|---|
| Projects within 4 km, counted | 34 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 7,561 | |
| Booked | 3,735 of 7,561 (49%) | |
| Unsold | 3,826 | |
| Booked a month, pooled | 60 flats | |
| Months to sell, pooled | 49 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 2.5 km, Bommasandra | |
| Metro, under construction | about 11 km, Kalena Agrahara |
| Kempegowda Airport | 58 | 44 |
| MG Road (CBD) | 23.5 | 20.5 |
| Manyata Tech Park | 34 | 27.5 |
| ITPL, Whitefield | 32 | 21.5 |
| Ecospace, Bellandur ORR | 21.5 | 13.5 |
| Electronic City Ph 1 | 6 | 4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | about 2 km to the north-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |