Building plan (Local Planning Authority)Sanctioned 22 Jul 2024No. PRJ/15563/23-24
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted 19 Jun 2004Bengaluru District
Permits
Approval letters
Building plan (Local Planning Authority)
Sanctioned 22 Jul 2024 · No. PRJ/15563/23-24
Power NOC
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Clear2 clear
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedBWSSBDeclared by the promoter
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion89%As of Q2 2026-27, promoter's return
Possession, agreementSep 2028Agreement for sale, p. 9
StructureRCC framed structureAs specified
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review
Receivable, sold flats₹7.03 CrAs of Q2 2026-27
Cost left₹6.02 CrAs of Q2 2026-27
Sold20 / 29As of Q2 2026-27
Sold in Q2 2026-273!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanKarnataka Bank Limited · ₹5.00 Cr disbursedAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
Karnataka Bank Limited · ₹5.00 Cr disbursed
Records searched to
2 Jan 2025
Building plan
Sanctioned 22 Jul 2024
Escrow bank
Karnataka Bank Ltd. · Bengaluru – Minerva circle
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
105 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Avalon in the interactive atlas
Survey 1/2
Approval or registration
Land use converted
Bengaluru District · Survey 1/2, 1/3
K-RERA filing, land schedule
Survey 1/3
Approval or registration
Land use converted
Bengaluru District · Survey 1/2, 1/3
K-RERA filing, land schedule
2009
Survey 1/2
Transfer of the land
Title deed registered
No. JPN-1-05398-2008-09 · Book 1 · executed 7 Jan 2009 · Consideration ₹43.6 L · Sy 1/2; 1, Uttarahalli hobli, Bangalore South taluk
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
E Khatha · BBMP · 12 Feb 2024; A Khatha · BBMP · 12 Feb 2024
Sale deed
Dated 7 Jan 2009
The RTC of each filed survey
Survey
Owners as on the RTC, read date / relation / share
Owners on the RTC
RTC extent
Filed extent
Extents agree?
Land category
Pending mutations
Sy. No. 1/2
████████
1
5 guntas
Not read yet
Sy. No. 1/3
████████
1
8 guntas
Not read yet
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Mutation entry; Share of sales revenue; Joint development agreement.
Fire department
Filed with the registration
SEIAA
Filed with the registration
AAI
Filed with the registration
KSPCB
Filed with the registration
Water and sewerage NOC (BWSSB)
issued 31 May 2024
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
30 Sep 2028
Registration certificates
PRM/KA/RERA/1251/310/PR/150225/007510
Land use
Conversion order
Land conversion
Converted 19 Jun 2004 · Bengaluru District
Survey numbers
1/2 · 1/3
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 87 m² 65.5%
2BHK 34.5%
Unit types
Type
Flats
Carpet, as filed (sq ft)
2BHK
10
8,396
3BHK
19
17,847
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Sold, Q2 2026-27
20 / 29
Unsold, Q2 2026-27
9
Months to sell, derived from filed bookings
7 months
The area
Comparable projects
Filed prices nearby
Basemap: Esri, OpenStreetMap contributors
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Forest Ridge, price locked; Jhanavi Trishul Alaska, price locked; Garden Square, price locked.
This project
Padlock: that project's price is part of its own report
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
Metro, operational1.2 kmDoddakallasandra
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
₹2.15 Cr in Q2 2026-27 (74% of that quarter's deposits)
Amount deposited in the quarter, Form 4
₹2,18,02,041
Net amount withdrawable, Form 4
₹5,45,49,020
Escrow account, Q1 2026-27
Opened at ₹1.49 Cr, ₹1.97 Cr deposited from sales, ₹1.73 Cr withdrawn
Escrow account to date, Q2 2026-27
₹8.54 Cr deposited from sales, ₹6.77 Cr withdrawn
Withdrawn from the escrow account to date
₹7,36,40,000
Share of collections deposited in escrow
72.38%
Sale proceeds realised, Q2 2026-27
₹2,92,34,068
Not verified yet: Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
BWSSB
Nearest city water main
180 m
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.