Approvals
| Building plan (BIAPPA) | Sanctioned 30 Aug 2022 · No. BIAAPA/TP/LAO/97/2021-22/1106 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹1.24 Cr 51.5%Development · ₹1.16 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 30 Aug 2022 | |
| Escrow bank | IDFC FIRST BANK · Sanjaynagar Branch |
Data room
165 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. The village name is shared by several villages; the one nearest the filed coordinate was used.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Godrej AquaCompleted · OC 03-01-2022 | Godrej Properties | Apartment | 1,100–1,701 sqft | Completed |
| Natures BoulevardActive · 43% built | M/s NATURES BOULEVARD | Plot | ~600–3,470 sqft (estimate: filed carpet plus 25%) | Dec 2030 |
| Purva ZeniumLapsed · completion date passed | Puravankara | Apartment | 1,044–2,123 sqft | Dec 2024 |
| Purva Zenium 2Active · 100% built | Puravankara limited | Apartment | 689–904 sqft carpet (as filed) | Jun 2027 |
All 4 other projects in IVC Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Beverly Hills Phase-III in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2025 |
| Land conversion | Converted 20 Aug 2019 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 130/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Ekta Elements | 5.9 km | Locked | |
|---|---|---|---|
| Vaishnavi At-One Life IV | about 9 km | Locked | |
| Fortius Good Earth | about 9 km | Locked | |
| Earth Aroma Phase-2 | 9.8 km | Locked | |
| Earth Aroma | 10.1 km | Locked |
| Beverly Hills Phase-III This project | This project is the point the others are measured from | 30 Jun 2025 | – | Not verified yet |
|---|---|---|---|---|
| Ekta Elements | 5.9 km | 31 Dec 2027 | – | Locked |
| Vaishnavi At-One Life IV | about 9 km | 18 Dec 2027 | – | Locked |
| Fortius Good Earth | about 9 km | 31 Dec 2027 | – | Locked |
| Earth Aroma Phase-2 | 9.8 km | 31 Dec 2025 | – | Locked |
| Earth Aroma | 10.1 km | 31 Dec 2024 | – | Locked |
| Rent, 2BHK, 3 km | ₹26,750 /mo · 5 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹27.5 /mo, as listed · 7 listings with a size |
| Projects within 4 km, counted | 15 (10 with an approximate location) | |
|---|---|---|
| Plots in them | 4,690 | |
| Booked | 2,075 of 4,690 (44%) | |
| Unsold | 2,615 | |
| Booked a month, pooled | 217 plots | |
| Months to sell, pooled | 12 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 170 m from the site | Clear |
| Nearest government-flagged flood location | 5.7 km, Shankrappa Layout, MAruthi nagar | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 1.2 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the south-east, an unnamed pond |
| RERA completion date | 30 Jun 2025 | Red flag |
|---|---|---|
| Work began, as filed | 1 Jun 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 17 May 2023 · site inspected 17 May 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 17 May 2023 | |
| Chartered accountant's certificate, registration | Dated 19 May 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹2.40 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹2.11 Cr | |
| Estimated cost, chartered accountant's certificate | ₹2.40 Cr, same as the filing |
| Escrow bank | IDFC FIRST BANK · Sanjaynagar Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Panchayath) | |
| Nearest city water main | 1.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.2 km to the south-west, tertiary drain | |
|---|---|---|
| Ground level | 911 m above sea level, plus or minus 4 m | |
| Metro, operational | 16.4 km, Yeshwantpur | |
| Metro, under construction | 2.0 km, Bettahalasuru |
| Kempegowda Airport | 12.7 | 18 | 9.6 |
| MG Road (CBD) | 24.1 | 27 | 19.1 |
| Manyata Tech Park | 14.9 | 19 | 11.2 |
| ITPL, Whitefield | 31.0 | 37 | 20.7 |
| Ecospace, Bellandur ORR | 35.8 | 46 | 24.7 |
| Electronic City Ph 1 | 43.9 | 52 | 34.2 |
| Landfill or waste transfer station | 110 m to the north-west | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the north-west, named VIdyanagara Substation on OpenStreetMap |