Approvals
| Building plan (Local Planning Authority) | Sanctioned 24 Aug 2023 · No. APA/CC/198/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 133 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹30.0 L
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 24 Aug 2023 | |
| Escrow bank | ICICI Bank · Sarjapura |
Data room
110 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
All 194 projects in Sarjapur → · Bhavisha Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bhavisha Bilva in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 123/2 | Converted 21 Nov 2022 · DC Bangalore Urban | |
| Sy 123/3 | Converted 21 Nov 2022 · DC, Bangalore Urban | |
| Survey numbers | 123/2 · 123/3 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 32 | 1,429 |
| Suyug's Saffron | about 1.5 km | Locked | |
|---|---|---|---|
| Sowparnika Olivia Nest | about 1.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 2.5 km | Locked | |
| Engrace Vista | about 3 km | Locked | |
| Engrace 4 | about 3 km | Locked | |
| Royal Nest | about 3.5 km | Locked | |
| Engrace 3 | about 3.5 km | Locked | |
| Vasudharini Nest | about 4 km | Locked | |
| Nambiar District 25 Phase 2 | about 4 km | Locked | |
| Leafy Avenue | about 4.5 km | Locked | |
| Coevolve Florenza | about 4.5 km | Locked | |
| Acorn Hive | about 6 km | Locked |
| Bhavisha Bilva This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Suyug's Saffron | about 1.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
| Sowparnika Olivia Nest | about 1.5 km | 30 Sep 2027 | 100% (211 of 211) | Locked |
| Bilva Phase-II By Bhavisha Homes |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 9 km, Gunjur |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Sarjapura Chikka Kere |
| Amenities declared | Electricity | |
|---|---|---|
| Covered parking per unit | 1.09 (35 covered spaces for 32 units) | |
| Power backup | Not declared |
| Schedule end | 30 Sep 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 1 Sep 2023 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Architect's certificate, registration | Dated 10 Oct 2023 · site inspected 10 Oct 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 10 Oct 2023 | |
| Chartered accountant's certificate, registration | Dated 20 Oct 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹19.80 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹19.00 Cr |
| Escrow bank | ICICI Bank · Sarjapura |
|---|
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 9 | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2.5 km |
| 30 Apr 2027 |
| 39% (89 of 226) |
| Locked |
| Engrace Vista | about 3 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Engrace 4 | about 3 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Royal Nest | about 3.5 km | 30 Jun 2028 | 9% (9 of 104) | Locked |
|---|
| Projects within 4 km, counted | 62 (62 with an approximate location) | |
|---|---|---|
| Flats in them | 14,437 | |
| Booked | 8,320 of 14,437 (58%) | |
| Unsold | 6,117 | |
| Booked a month, pooled | 182 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 11.5 km, Bommasandra | |
| Metro, under construction | about 13.5 km, Kadubeesanahalli |
| Kempegowda Airport | 53 | 39 |
| MG Road (CBD) | 30 | 24 |
| Manyata Tech Park | 34 | 27.5 |
| ITPL, Whitefield | 20 | 15 |
| Ecospace, Bellandur ORR | 19 | 14 |
| Electronic City Ph 1 | 22.5 | 12 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Sarjapur Substation on OpenStreetMap |