RERA extensionsNone on the filingFiling read 20 Oct 2026
Permits
Approval letters
Power NOC
Filed with the registration
Fire department
Filed with the registration
Environmental clearance
Filed with the registration
AAI
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
Disputes & cases
Are there court cases or buyer complaints on this project?
Clear1 clear
Builder: GOKUL INDWIN DEVELOPERS
Court cases on the project's land
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
Search pending.
Court cases against the builder and landowners
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
None found.
Buyer complaints filed with K-RERA on this project
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
Buyer complaints on other projects by this builder
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
✓Confirmed: the record names this project, its land or its promoter company?Likely: matched by the builder's nameHigh: a court stay or a pending case on the filed landMedium: open, or the record does not sayLow: decided or closed
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Completed: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Nearest 12 with filed prices
Location & risks
What is the location like?
Water supply, as filedLocal authorityDeclared by the promoter
Metro, operationalabout 6.5 kmBaiyappanahalli
The site
Zoning & hazards
Power lines, drains and flood locations around the filed pin
Construction & progress
How is it being built, and when will it be ready?
CompletionCompletedOccupancy certificate, 15 Feb 2024
Progress
Completion, architect
Completed: no quarterly return is on this phase's K-RERA filing
Work left
By component
Completed: no quarterly return is on this phase's K-RERA filing
Quarterly return
Completion
Developer
Can the developer deliver?
Sold132 / 133At the completion filing, 1 Aug 2024
Sold in the latest quarterNo return filed
Funding
Estimated cost
Land · ₹45.00 Cr 55.6%Development · ₹36.00 Cr
Loan & collateral
Can it be financed?
Review1 to review
Conditions
Collateral checks
Records searched to
16 Mar 2021
!Review
Escrow bank
HDFC · Kothanur
Stage
Certified progress
Completed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Documents filed144On K-RERA
Available10774% of filed
K-RERA only37
Approvals with a validity dateNone read
Approvals & NOCs
Available
K-RERA only
K-RERA only
K-RERA only
K-RERA only
2 pagesAvailable
10 pagesAvailable
12 pagesAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
Filed 9 Mar 20212 pagesAvailable
Filed 18 Mar 20212 pagesAvailable
Filed 25 Aug 2021Available
Filed 6 Sep 2021Available
Filed 5 Oct 2021Available
Filed 5 Oct 2021Available
Filed 5 Oct 2021Available
Filed 5 Oct 2021Available
Filed 29 Oct 2021Available
Filed 29 Oct 2021Available
Filed 29 Oct 2021Available
Filed 29 Oct 2021Available
Filed 29 Oct 2021Available
Filed 29 Oct 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
Filed 2 Nov 2021Available
4 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Blue Berry Homes in the interactive atlas
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 4 pages, English.
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; How the land reached this project; Court-case search; High Court order; Charges; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Jan 2025
Registration certificates
PRM/KA/RERA/1251/309/PR/211110/004493
Not verified yet: Building plan, Land conversion, Validity, Conversion order.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Unit mix filed; Unit types; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Drains, lakes and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Groundwater; Zoning, RMP 2015; Nearest high-tension line; Specification and Form 5; What it means; Through the year; Nearest city water main; Ground level.
Completed, occupancy certificate 15 Feb 2024
Dates
Dates
Filed dates
Schedule end
15 Dec 2024
RERA completion date
31 Jan 2025
Work began, as filed
1 Feb 2021
Specified structure
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Main structure; Electrical and plumbing finishing; Internal roads; Club house; Completion, accountant; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Structural engineer, quarterly; Design consultants (Form 6); Fire safety.
44.4%
Form 4
Estimated cost, at registration
₹81.00 Cr
Sales
Sold vs unsold, at completion
Sold (132) 99.2%Unsold (1) 0.8%
Sold per quarter
Completed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Flats sold, at completion
132
Flats unsold, at completion
1
Flats in the phase
133
Compliance
Escrow
Completed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
HDFC · Kothanur
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Six city anchors · OSRM, no traffic
Kempegowda Airport
25.5
18.5
MG Road (CBD)
11
8.5
Manyata Tech Park
4
1.5
ITPL, Whitefield
19
13
Ecospace, Bellandur ORR
23.5
14
Electronic City Ph 1
32
23.5
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km
Sewage treatment plant
about 1 km, named Sewage Treatment Plant on OpenStreetMap