It was a seemless handover for us. The team of Ms.Sangeetha and Mr.Prashanth made it easy for us. Nice gesture, coordial clear explanation of dos and donts.
Overview
Brigade Horizon
Overview
Brigade Horizon
Overview
Brigade Horizon
Overview
Photo: Brigade Horizon BengaluruTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
Survey 248/2
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 23 May 2022 | |
| Escrow bank | KOTAK MAHINDRA BANK · M.G Road |
Data room
149 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
It was a seemless handover for us. The team of Ms.Sangeetha and Mr.Prashanth made it easy for us. Nice gesture, coordial clear explanation of dos and donts.
I recently moved to Brigade Horizon, and my experience has been very positive. The project has a pleasant low-rise design, which makes it feel much less crowded compared to many high-rise apartment communities. The overall layout is…
Nicely designed well executed project . Great team work Rera guilelines are followed at every steps . Trustworthy Sales team technical team gives customer's satisfaction.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aaradhya GardensRegistered · no quarterly update yet | SAI SAMRUDHI CONSTRUCTIONS | Apartment | 992 sqft carpet (as filed) | Dec 2028 |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aashirvad's Panchamukhi ShreyodhamaCompleted (regulator flag) | RAJESHWARI AASHIRVAD INFRA PROJECTS PRIVATE LIMITED | Plot | ~1,650 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Horizon in the interactive atlas
Transfer of the land
Sale deed
Survey 248/1
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru · Survey 248/1
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru · Survey 248/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Kumbalagudu Grama Panchayat · Survey 248/1, 248/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Kumbalagudu Grama Panchayat · Survey 248/1, 248/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/AS/AA-3/TS-2/D/04/2022-23 BDA/NM/AS/AA-3/TS-2/D/16/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/190722/005086
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 248/1, 248/2 | |
|---|---|---|
| Land extent, Sy 248/1 | 1 Acre | |
| Land extent, Sy 248/2 | 4 Acres | |
| Owner kind, Sy 248/1 | Company | |
| Share as printed, Sy 248/1 | 100 | |
| Owner as printed, Sy 248/1 | ||
| Owner kind, Sy 248/2 | Company | |
| Share as printed, Sy 248/2 | 100 | |
| Owner as printed, Sy 248/2 | ||
| Land area of this registration | 20,234 sq m | |
| Khata | A Khatha · Kumbalagudu Grama Panchayat · 9 Jun 2017 | |
| Sale deed | Dated 22 May 2006, 7 Jun 2006 |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 23 May 2022 · No. BDA/NM/AS/AA-3/TS-2/D/04/2022-23 BDA/NM/AS/AA-3/TS-2/D/16/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/152/2021 · issued 17 Aug 2021 · building height 29.56 m | Clear |
| Environmental clearance | SEIAA 37 CON 2018 · issued 10 Apr 2018 | Clear |
| Airport height NOC | issued 16 Jul 2021 · valid until 15 Jul 2029 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2026 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 248/1 | Converted 23 Nov 2015 · Deputy Commissioner, Bengaluru | |
| Sy 248/2 | Converted 25 Jul 2016 · Deputy Commissioner, Bengaluru | |
| Survey numbers | 248/1 · 248/2 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
TYPE-4 (2 Bedroom + 2 Toilet) · 62 m² 43.3%TYPE-1 (1 Bedroom+ 1 Toilet) · 38 m² 13.4%TYPE-7 (3 Bedroom + 2 Toilet) · 85 m² 13.2%TYPE-6 (3 Bedroom + 2 Toilet) · 86 m² 8.6%13 other types 21.5%
| TYPE-1 (1 Bedroom+ 1 Toilet) | 50 | 409 |
| TYPE-10 (3 Bedroom + 2 Toilet) | 16 | 915 |
| TYPE-11 (3 Bedroom + 2 Toilet) | 1 | 915 |
| TYPE-12 (3 Bedroom + 2 Toilet) | 2 | 915 |
| TYPE-13 (3 Bedroom + 2 Toilet) | 4 | 990 |
| TYPE-14 (3 Bedroom + 2 Toilet) | 2 | 990 |
| TYPE-15 (4 Bedroom + 3 Toilet) | 2 | 1,658 |
| TYPE-16 (4 Bedroom + 3 Toilet) | 2 | 1,658 |
| TYPE-17 (4 Bedroom + 3 Toilet) | 2 | 1,722 |
| TYPE-2 (2 Bedroom+ 2 Toilet) | 29 | 635 |
| TYPE-3 (2 Bedroom + 2 Toilet) | 10 | 635 |
| TYPE-4 (2 Bedroom + 2 Toilet) | 161 | 667 |
| TYPE-5 (2 Bedroom + 2 Toilet) | 7 | 667 |
| TYPE-6 (3 Bedroom + 2 Toilet) | 32 | 926 |
| TYPE-7 (3 Bedroom + 2 Toilet) | 49 | 915 |
| TYPE-8 (3 Bedroom + 2 Toilet) | 1 | 915 |
| TYPE-9 (3 Bedroom + 2 Toilet) | 2 | 915 |
| Sold, Q2 2026-27 | 368 / 372 | |
|---|---|---|
| Unsold, Q2 2026-27 | 4 |
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Good Earth Cadence, price locked; Good Earth Ochre, price locked.
| Good Earth Cadence | 1.3 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | 1.5 km | Locked | |
| Samaya Sunshine | about 5.5 km | Locked | |
| Sumadhura Pramoda | about 7.5 km | Locked |
| Brigade Horizon This project | This project is the point the others are measured from | 31 Dec 2026 | 99% (368 of 372) | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | 1.3 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | 1.5 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Samaya Sunshine | about 5.5 km |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 120 m from the site | Clear |
| Nearest government-flagged flood location | 3.5 km, Kengeri Yellamma temple |
| Nearest storm drain | 1.5 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 270 m to the north-west, an unnamed water body |
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym | |
|---|---|---|
| Electricity, built | 80% | |
| Indoor Sports facility, built | 100% | |
| Gym, built | 100% | |
| Covered parking per unit | 1.04 (388 covered spaces for 372 units) | |
| Power backup | Not declared |
As the promoter reported it

| Main structure | 100% · planned by 4 Oct 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 98% · planned by 17 Jul 2025 | |
| Completion | 100% | |
| Completion, accountant | 100% of the estimated cost spent |
| Schedule end | 24 Jul 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 24 Jun 2022 |
| Building heights, fire NOC | 29.56 m on the fire NOC · filed: Tower A 29.4 m, Tower B 29.4 m, Tower C 15 m, Tower D 15 m, Tower E 15 m, Tower F 15 m, Tower G 15 m, Tower H 15 m, Tower I 15 m, Tower J 15 m, Tower K 15 m, Tower L 15 m, Tower M 15 m, Tower N 15 m, Tower O 15 m, Tower P 15 m, Tower Q 15 m, Tower R 15 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/152/2021 · issued 17 Aug 2021 · building height 29.56 m | |
| Environmental clearance | SEIAA 37 CON 2018 · issued 10 Apr 2018 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Engineer's certificate, registration | Dated 17 Jun 2022 | |
| Chartered accountant, Form 4 | Dated 8 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹46.50 Cr 25.2%Development · ₹138.00 Cr 74.8%
| Estimated cost, at registration | ₹184.50 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹140.28 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹198.02 Cr | |
| Cost incurred | ₹198.02 Cr (100% of the Form 4 Q2 2026-27 estimate) | |
| Receivable, sold flats | ₹15.84 Cr |
Sold (368) 98.9%Unsold (4) 1.1%
| Sold, Q3 2025-26 | 368 / 372 · 4 available | |
|---|---|---|
| Sold, Q4 2025-26 | 368 / 372 · 4 available | |
| Sold, Q1 2026-27 | 368 / 372 · 4 available | |
| Sold, Q2 2026-27 | 368 / 372 · 4 available | |
| Unsold, Q2 2026-27 | 4 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | KOTAK MAHINDRA BANK · M.G Road | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Sale proceeds realised, Q1 2026-27 | ₹10,91,00,000 |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 | |
| Other phases under this promoter name | 31 | |
| With a filed extension or completion | 13 (11 completed, 2 extended) | |
| Average schedule slip | 19 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| RITEWAY & KUBERA PROMOTERS |
| Plot |
| ~1,200–2,400 sqft (estimate: filed carpet plus 25%) |
| Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
8 of 121 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
| Jhanavi Trishul Alaska | 8.9 km | Locked |
|---|
| Axis Amarissa | about 9 km | Locked |
|---|
| Sobha Royal Crest | about 9.5 km | Locked |
|---|
| Garden Square | 9.8 km | Locked |
|---|
| Harivishram | about 10 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 10 km | Locked |
|---|
| Srivara Vasudha | about 10 km | Locked |
|---|
| Sattva Springs | about 10.5 km | Locked |
|---|
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Sumadhura Pramoda | about 7.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Jhanavi Trishul Alaska | 8.9 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Axis Amarissa | about 9 km | 31 Dec 2029 | 30% (24 of 81) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹28,000 /mo · 5 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹24,150 /mo · 5 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 11 listings with a size |
| Projects within 4 km, counted | 21 (9 with an approximate location) | |
|---|---|---|
| Flats in them | 5,827 | |
| Booked | 2,625 of 5,827 (45%) | |
| Unsold | 3,202 | |
| Booked a month, pooled | 37 flats | |
| Months to sell, pooled | 67 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB, Local authority (Local Authority), Other | |
| Nearest city water main | 3.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.5 km to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 754 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.6 km, Challaghatta | |
| Metro, under construction | 15.5 km, Kalena Agrahara |
| Kempegowda Airport | 54.6 | 58 | 44.2 |
| MG Road (CBD) | 21.8 | 27 | 18.9 |
| Manyata Tech Park | 32.1 | 37 | 25.2 |
| ITPL, Whitefield | 39.0 | 45 | 32.7 |
| Ecospace, Bellandur ORR | 35.6 | 37 | 25.0 |
| Electronic City Ph 1 | 32.4 | 27 | 25.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 420 m to the north-west, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 980 m to the north-east |