Overview
Brigade Legacy
Overview
Brigade Legacy
Overview
Brigade Legacy
Overview
Photo: Yadhu Kalyan| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
| LapazExtended to 20-03-2027 | SANTOSH GLEN LEWIS | Apartment | 527–947 sqft carpet (as filed) | Mar 2027 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Legacy in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Magnolia Delight | about 3.5 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Vista Svara | about 5 km | Locked | |
| Century Regalia (Project 2) | 5.5 km | Locked | |
| Renaissance Srichakra | about 5.5 km | Locked | |
| Legacy Saviero | about 6 km | Locked | |
| Lodha Mirabelle | 6.1 km | Locked | |
| Mirabelle Phase 2 | about 6 km | Locked | |
| Vista Padmalaya | about 6.5 km | Locked | |
| Vkk Grand | 6.7 km | Locked | |
| Brr North Excellency Phase I | about 7 km | Locked | |
| Sumadhura Solea | 7.6 km | Locked |
| Brigade Legacy This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Vista Svara | about 5 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Century Regalia (Project 2) | 5.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Renaissance Srichakra | about 5.5 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Legacy Saviero | about 6 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 9 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹62,000 /mo · 63 listings | |
| Rent, 2BHK, 3 km | ₹34,908 /mo · 149 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 89 listings | |
| Rent per sq ft, 3 km | ₹30.2 /mo, as listed · 115 listings with a size |
| Projects within 4 km, counted | 19 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 647 | |
| Booked | 302 of 647 (47%) | |
| Unsold | 345 | |
| Booked a month, pooled | 4 flats | |
| Months to sell, pooled | 93 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 590 m, Pulakeshinagara |
| Nearest storm drain | 40 m to the south-east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 80 m to the east, an unnamed pond |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Nearest city water main | 580 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 40 m to the south-east, secondary drain | |
|---|---|---|
| Ground level | 906 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.4 km, Mahatma Gandhi Road | |
| Metro, under construction | 810 m, Pottery Town |
| Kempegowda Airport | 30.7 | 31 | 24.6 |
| MG Road (CBD) | 4.9 | 7 | 2.7 |
| Manyata Tech Park | 7.1 | 9 | 5.5 |
| ITPL, Whitefield | 16.9 | 20 | 13.2 |
| Ecospace, Bellandur ORR | 18.1 | 24 | 10.5 |
| Electronic City Ph 1 | 24.3 | 30 | 18.7 |
| Landfill or waste transfer station | 2.7 km to the south-west | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the south-east, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | 1.8 km to the east, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 760 m to the north-east, named Pottery Road on OpenStreetMap |