| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 21 Apr 2022 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹7.24 Cr 61.7%Development · ₹4.50 Cr 38.3%
Loan & collateral
| Escrow bank | VIJAYA BANK · Cox Town Branch |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 2 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Dec 2026 |
| LapazExtended to 20-03-2027 | SANTOSH GLEN LEWIS | Apartment | 527–947 sqft carpet (as filed) | Mar 2027 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jose Esperanca in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 1,211 sq m |
|---|
| Magnolia Delight | about 3 km | Locked |
|---|
| Ranka Iris | about 4.5 km | Locked |
|---|
| Legacy Saviero | about 5 km | Locked |
|---|
| Lodha Mirabelle | about 5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5 km | Locked |
|---|
| Vkk Grand | about 5.5 km | Locked |
|---|
| Century Regalia (Project 2) | about 6 km | Locked |
|---|
| Brr North Excellency Phase I | about 6 km | Locked |
|---|
| Renaissance Srichakra | about 6 km | Locked |
|---|
| Vista Svara | about 6.5 km | Locked |
|---|
| Sumadhura Solea | about 6.5 km | Locked |
|---|
| Sumadhura Epitome | about 7 km | Locked |
|---|
| Jose Esperanca This project | This project is the point the others are measured from | 21 Apr 2022 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Lodha Mirabelle | about 5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 5 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Vkk Grand | about 5.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 506 | |
| Booked | 188 of 506 (37%) | |
| Unsold | 318 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 57 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, THAMMANA LAYOUT NEAR LINGARAJAPURA, |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Schedule end | 1 May 2021 | |
|---|---|---|
| RERA completion date | 21 Apr 2022 | Red flag |
| Work began, as filed | 2 Jul 2018 |
| Estimated cost, at registration | ₹11.74 Cr |
|---|
| Escrow bank | VIJAYA BANK · Cox Town Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Halasuru | |
| Metro, under construction | about 1 km, Tannery Road |
| Kempegowda Airport | 23.5 |
| MG Road (CBD) | 4 |
| Manyata Tech Park | 4.5 |
| ITPL, Whitefield | 12.5 |
| Ecospace, Bellandur ORR | 10.5 |
| Electronic City Ph 1 | 19.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1.5 km, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Pottery Road on OpenStreetMap |