Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 2 pages.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 29 Jun 2018 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
| Nearest storm drain | about 0.5 km from the locality centre, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body |
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
| Estimated cost, at registration | ₹16.00 Cr |
|---|
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · Wheelers Road Cox Town |
|---|
Data room
41 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Jose EsperancaLapsed · completion date passed | M/s Sindhuri Infra Projects | Apartment | – | Apr 2022 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment | 2,477–3,131 sqft | Dec 2026 |
| LapazExtended to 20-03-2027 | SANTOSH GLEN LEWIS | Apartment | 527–947 sqft carpet (as filed) | Mar 2027 |
8 of 22 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
All 24 projects in Frazer Town → · Lewis Infrastructure And Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Charis is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 613 sq m | |
|---|---|---|
| Sale deed | 28 Sep 2018 | |
| Title deed | Executed 28 Sep 2018 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Magnolia Delight | about 3.5 km, to a locality centre | Locked |
|---|
| Ranka Iris | about 4 km, to a locality centre | Locked |
|---|
| Legacy Saviero | about 5 km, to a locality centre | Locked |
|---|
| Century Regalia (Project 2) | about 5.5 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 5.5 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km, to a locality centre | Locked |
|---|
| Vkk Grand | about 5.5 km, to a locality centre | Locked |
|---|
| Vista Svara | about 6 km, to a locality centre | Locked |
|---|
| Renaissance Srichakra | about 6.5 km, to a locality centre | Locked |
|---|
| Brr North Excellency Phase I | about 6.5 km, to a locality centre | Locked |
|---|
| Sumadhura Solea | about 7 km, to a locality centre | Locked |
|---|
| Sumadhura Epitome | about 7 km, to a locality centre | Locked |
|---|
| Charis This project | This project is the point the others are measured from | 29 Jun 2018 | – | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km, to a locality centre | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km, to a locality centre | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 5 km, to a locality centre | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Century Regalia (Project 2) | about 5.5 km, to a locality centre | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Lodha Mirabelle | about 5.5 km, to a locality centre | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 5.5 km, to a locality centre | 31 May 2030 | 61% (173 of 284) | Locked |
| Water supply, as filed | Local authority |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, secondary drain |
|---|
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1.5 km from the locality centre, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | about 1.5 km from the locality centre, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 0.5 km from the locality centre, named ITC Substation on OpenStreetMap |
| Schedule end | 30 Apr 2018 | |
|---|---|---|
| RERA completion date | 29 Jun 2018 | |
| Work began, as filed | 12 Dec 2016 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | STATE BANK OF INDIA · Wheelers Road Cox Town |
|---|
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 2 | |
| Other phases under this promoter name | 8 | |
| With a filed extension or completion | 5 (4 completed, 1 extended) | |
| Average schedule slip | 5 months |
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.