Builder vanished without providing promised amenities clubhouse, swimming pool etc and started new ventures in Hyderabad.
Overview
Celebrity Pride Access Ph III
Overview
Celebrity Pride Access Ph III
Overview
Celebrity Pride Access Ph III
Overview
Photo: CELEBRITY PRIDE ACCESSBuilder vanished without providing promised amenities clubhouse, swimming pool etc and started new ventures in Hyderabad.
Super place were i can truly enjoy the nature ☺️ and the place is simply super
It's wonderful project. Close to main road. Very good amenities like playground, swimming pool, parks with wide roads. Affordable villa plots.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aban DazzleRegistered · no quarterly update yet |
| ABAN DEVELOPERS PRIVATE LIMITED |
| Rowhouse |
| 2,040 sqft carpet (as filed) |
| Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 192 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Celebrity Pride Access Ph III in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Projects within 4 km, counted | 23 (20 with an approximate location) | |
|---|---|---|
| Plots in them | 4,649 | |
| Booked | 2,869 of 4,649 (62%) | |
| Unsold | 1,780 | |
| Booked a month, pooled | 40 plots | |
| Months to sell, pooled | 43 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Nearest government-flagged flood location | 13.7 km, Doddakannelli |
|---|
| Nearest storm drain | 370 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 60 m to the east, Bidaraguppe Kere |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Nearest city water main | 11.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 370 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 862 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.6 km, Bommasandra | |
| Metro, under construction | 17.1 km, Kadubeesanahalli |
| Kempegowda Airport | 60.8 | 70 | 44.5 |
| MG Road (CBD) | 37.4 | 48 | 26.9 |
| Manyata Tech Park | 42.0 | 57 | 31.7 |
| ITPL, Whitefield | 27.6 | 39 | 20.6 |
| Ecospace, Bellandur ORR | 23.6 | 38 | 17.1 |
| Electronic City Ph 1 | 19.6 | 26 | 11.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 770 m to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |