Overview
Concorde Opus II Phase 2
Part ofConcorde Opus II2 phases, 185 plots
Overview
Concorde Opus II Phase 2
Part ofConcorde Opus II2 phases, 185 plots
Overview
Concorde Opus II Phase 2
Part ofConcorde Opus II2 phases, 185 plots
Overview
Part ofConcorde Opus II2 phases, 185 plots
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 80/5 | 23 Sep 2021DC Office, Bangalore Urban District | 5 Apr 2008 |
Approvals
| Building plan (Local Planning Authority) | Sanctioned 5 Jan 2023 · No. 22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹40.77 Cr 81.9%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 5 Jan 2023 | |
| Escrow bank | HDFC · Bilekahalli - J P Nagar 4th Phase |
Data room
165 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 6 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 6 of 7 filed survey numbers matched, 1 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Concorde Opus II Phase 2 in the interactive atlas
| 1 Acre, 18 Gunta / 5867.92 Sq Mtr |
| Survey 81 | ||||
|---|---|---|---|---|
| 81/3 | 20 Apr 2021DC Office, Bangalore Urban | 5 Apr 2008 | 14 Feb 2023E Khatha · Grama Panchayath Office, Tharalu | 0 Acre, 39 Gunta / 3945.68 Sq Mtr |
| 81/2 | 23 Sep 2021DC Office, Bangalore Urban | 2 Dec 2002 | 14 Feb 2023E Khatha · Grama Panchayath Office, Tharalu | 0 Acre, 36 Gunta / 3642.12 Sq Mtr |
| 81/1 | 12 Oct 2022DC Office, Bangalore Urban District | 5 Mar 1983 | 14 Feb 2023E Khatha · Grama Panchayath Office, Tharalu | 0 Acre, 32 Gunta / 3237.44 Sq Mtr |
| 91/3 | 20 Apr 2021DC Office, Bangalore Urban | 5 Apr 2008 | 15 Feb 2023E Khatha · Grama Panchayath Office, Tharalu | 1 Acre, 1 Gunta / 4148.02 Sq Mtr |
|---|
| 82/4 | 5 May 2018DC Office, Bangalore Urban District | 20 Aug 1962 | 14 Feb 2023E Khatha · Grama Panchayath Office, Tharalu | 0 Acre, 35 Gunta / 3540.99 Sq Mtr |
|---|
| 89/2 | 5 May 2018DC Office, Bangalore Urban District | 20 Aug 1962 | 14 Feb 2023E Khatha · Grama Panchayath Office, Tharalu | 0 Acre, 19 Gunta / 1922.23 Sq Mtr |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
ತರಳು village, ಉತ್ತರಹಳ್ಳಿ hobli
Title deed filed with K-RERA, p. 1 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan 22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/100423/005857
K-RERA registration ·
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
| Filed survey numbers matched to the KGIS map | 6 of 7 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 79,340 sq m | |
| Extent the filed land schedule names for these survey numbers | 24,382 sq m | |
| Plot area against the filed extent | 3.25 times | |
| Village, hobli and taluk on the KGIS map | K.G.Tharalu, UTTARAHALLI -2 hobli, BANGALORE-SOUTH taluk | |
| Sy. 80/5: filed extent, KGIS plot | 5,868 sq m, 33,779 sq m | |
| Sy. 91/3: filed extent, KGIS plot | 4,148 sq m, 13,542 sq m | |
| Sy. 82/4: filed extent, KGIS plot | 3,541 sq m, 15,379 sq m | |
| Mutation entry | None open on 7 of 7 filed surveys |
Satellite map with the 6 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 6 of 7 filed survey numbers matched, 1 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 80/5, 81/3, 91/3, 81/2, 82/4, 89/2 and 1 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 79,340 sq m (the project holds a share) | |
| Khata | E Khatha · Grama Panchayath Office, Tharalu · 14 Feb 2023; E Khatha · Grama Panchayath Office, Tharalu · 15 Feb 2023 | |
| Sale deed | Dated 20 Aug 1962, 5 Mar 1983, 2 Dec 2002 and 1 more | |
| Title deed | Sy 80/S |
| Sy. No. 80/5 | Not read yet | 1 acre 18 guntas | 8 acres 14 guntas | Differs: 6 acres 36 guntas apart | 0 | ||
| Sy. No. 81/3 | Not read yet | 0 | |||||
| Sy. No. 81/2 | Not read yet | 0 | |||||
| Sy. No. 81/1 | Not read yet | 0 | |||||
| Sy. No. 91/3 | Not read yet |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Apr 2026 |
| Land conversion | 7 of 7 parcels converted | |
|---|---|---|
| Sy 80/5 | Converted 23 Sep 2021 · DC Office, Bangalore Urban District | |
| Sy 81/3, 91/3 | Converted 20 Apr 2021 · DC Office, Bangalore Urban | |
| Sy 81/2 | Converted 23 Sep 2021 · DC Office, Bangalore Urban | |
| Sy 82/4, 89/2 | Converted 5 May 2018 · DC Office, Bangalore Urban District | |
| Sy 81/1 | Converted 12 Oct 2022 · DC Office, Bangalore Urban District | |
| Survey numbers | 80/5 · 81/3 · 91/3 · 81/2 · 82/4 · 89/2 · 81/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 9 (9 with an approximate location) | |
|---|---|---|
| Plots in them | 1,984 | |
| Booked | 568 of 1,984 (29%) | |
| Unsold | 1,416 | |
| Booked a month, pooled | 12 plots | |
| Months to sell, pooled | 64 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 9.5 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 30 Apr 2026 | |
|---|---|---|
| RERA completion date | 30 Apr 2026 | |
| Work began, as filed | 15 Apr 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 17 Feb 2023 · site inspected 9 Feb 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 17 Feb 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹49.80 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹3.88 Cr | |
| Estimated cost, engineer's certificate | ₹4.27 Cr | |
| Estimated cost, chartered accountant's certificate | ₹49.80 Cr, same as the filing |
| Escrow bank | HDFC · Bilekahalli - J P Nagar 4th Phase |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 3 acres 14 guntas |
| Differs: 2 acres 13 guntas apart |
| 0 |
| Sy. No. 82/4 | Not read yet | 35 guntas | 3 acres 32 guntas | Differs: 2 acres 37 guntas apart | 0 |
| Sy. No. 89/2 | Not read yet | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Metro, operational | about 9 km, Silk Institute | |
| Metro, under construction | about 12.5 km, Kalena Agrahara |
| Kempegowda Airport | 62 | 50.5 |
| MG Road (CBD) | 29 | 23 |
| Manyata Tech Park | 37.5 | 31 |
| ITPL, Whitefield | 46 | 32.5 |
| Ecospace, Bellandur ORR | 33.5 | 23.5 |
| Electronic City Ph 1 | 30.5 | 18 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Somanahalli Substation on OpenStreetMap |