Overview
Concorde Opus II Phase 3
Part ofConcorde Opus II2 phases, 185 plots
Overview
Concorde Opus II Phase 3
Part ofConcorde Opus II2 phases, 185 plots
Overview
Concorde Opus II Phase 3
Part ofConcorde Opus II2 phases, 185 plots
Overview
Part ofConcorde Opus II2 phases, 185 plots
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata |
|---|
Approvals
| Building plan (BMRDA) | Sanctioned 12 Dec 2023 · No. KPA/LAO/11/2023-24/1730 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹14.87 Cr 63.7%Development · ₹8.46 Cr 36.3%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 29 Jan 2024 | Review |
| Building plan (BMRDA) | Sanctioned 12 Dec 2023 | |
| Escrow bank | HDFC · Bilekahalli-J.P.Nagar 4th Phase |
Data room
177 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Concorde Opus II Phase 3 in the interactive atlas
| Extent |
|---|
| Survey 82 | ||||
|---|---|---|---|---|
| 82/1 | 16 Nov 2022DC Office, Bangalore Urban | 2 Aug 2010 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 1 Acre, 13 Gunta / 5362.01 Sq Mtr |
| 82/3 | 16 Nov 2022DC Office, Bangalore Urban | 18 Mar 2011 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 0 Acre, 35 Guntas / 3540.95 Sq Mtr |
| Survey 83 | ||||
|---|---|---|---|---|
| 83/4 | 17 Apr 2023DC Office, Bangalore Urban | 18 Mar 2011 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 0 Acre, 20 Guntas / 2023.4 Sq Mtr |
| 83/1 | 18 Nov 2022DC Office, Bangalore Urban | 27 Mar 2018 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 0 Acre, 29 Guntas / 2933.93 Sq Mtr |
| 83/5 | 17 Apr 2023DC Office, Bangalore Urban | 30 Jul 2021 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 0 Acre, 11 Guntas / 1112.87 Sq Mtr |
| 89/1 | 16 Nov 2022DC Office, Bangalore Urban | 18 Mar 2011 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 0 Acre, 7 Guntas / 708.19 Sq Mtr |
|---|
| Survey 90 | ||||
|---|---|---|---|---|
| 90/1 | 12 Oct 2022DC Office, Bangalore Urban | 29 Mar 1987 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 1 Acre, 22 Guntas / 6272.54 Sq Mtr |
| 90/2 | 12 Oct 2022DC Office, Bangalore Urban | 11 May 2006 | 20 Nov 2023E Khatha · Taralu Grama Panchayath | 0 Acre, 34 Guntas / 3439.78 Sq Mtr |
K-RERA filing, land schedule
Deeds read, and the whole project
Approval or registration
Building plan sanctioned
BMRDA · plan KPA/LAO/11/2023-24/1730
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/160224/006627
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 29 Jan 2024 |
|---|
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 4 of 4 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 37,511 sq m | |
| Extent the filed land schedule names for these survey numbers | 25,394 sq m | |
| Plot area against the filed extent | 1.48 times | |
| Village, hobli and taluk on the KGIS map | K.G.Tharalu, Uttarahalli-2 hobli, Bangalore-South taluk | |
| Sy. 89/1: filed extent, KGIS plot | 708 sq m, 1,719 sq m | |
| Mutation entry | None open on 8 of 8 filed surveys |
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 82/1, 82/3, 83/4, 89/1, 83/1, 83/5 and 2 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 37,511 sq m (the project holds a share) | |
| Khata | E Khatha · Taralu Grama Panchayath · 20 Nov 2023 | |
| Sale deed | Dated 29 Mar 1987, 11 May 2006, 2 Aug 2010 and 3 more |
| Sy. No. 82/1 | 1 | 1 acre 13 guntas | 0 | |||||
| Sy. No. 82/3 | 1 | 35 guntas | 0 | |||||
| Sy. No. 83/4 | 1 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2027 |
| Land conversion | 8 of 8 parcels converted | |
|---|---|---|
| Sy 82/1, 82/3, 89/1 | Converted 16 Nov 2022 · DC Office, Bangalore Urban | |
| Sy 83/4, 83/5 | Converted 17 Apr 2023 · DC Office, Bangalore Urban | |
| Sy 83/1 | Converted 18 Nov 2022 · DC Office, Bangalore Urban | |
| Sy 90/1, 90/2 | Converted 12 Oct 2022 · DC Office, Bangalore Urban | |
| Survey numbers | 82/1 · 82/3 · 83/4 · 89/1 · 83/1 · 83/5 · 90/1 · 90/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 9 (9 with an approximate location) | |
|---|---|---|
| Plots in them | 1,984 | |
| Booked | 568 of 1,984 (29%) | |
| Unsold | 1,416 | |
| Booked a month, pooled | 12 plots | |
| Months to sell, pooled | 64 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 92% Residential (main), 8% Transport & communication, over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 9 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
As the promoter reported itPossession date in the agreement
| Internal roads | 100% | |
|---|---|---|
| Completion | 95% | |
| Completion, accountant | 86.9% of the estimated cost spent |
| Possession, agreement | 26 Jan 2027 | |
|---|---|---|
| RERA completion date | 31 Mar 2027 | |
| Work began, as filed | 21 Feb 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect's certificate, registration | Dated 17 Jan 2024 · site inspected 16 Jan 2024 | |
| Engineer's certificate, registration | Dated 17 Jan 2024 | |
| Chartered accountant's certificate, registration | Dated 23 Jan 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹23.32 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹8.46 Cr | |
| Cost incurred | ₹20.27 Cr (86.9% of the estimate) |
| Escrow bank | HDFC · Bilekahalli-J.P.Nagar 4th Phase | |
|---|---|---|
| Designated account, collected | ₹98.5 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹79.5 L in Q2 2026-27 (81% of that quarter's deposits) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 20 guntas |
| 0 |
| Sy. No. 83/1 | 1 | 29 guntas | 0 |
| Sy. No. 83/5 | 3 | 11 guntas | 0 |
| Sy. No. 89/1 | 1 | 7 guntas | 7 guntas | 17 guntas | The map differs by 10 guntas | 0 |
| Sy. No. 90/1 | 1 | 1 acre 22 guntas | 0 |
| Sy. No. 90/2 | 1 | 34 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Tharalu Grama Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Metro, operational | about 8.5 km, Silk Institute | |
| Metro, under construction | about 12.5 km, Kalena Agrahara |
| Kempegowda Airport | 61.5 | 50 |
| MG Road (CBD) | 28.5 | 23 |
| Manyata Tech Park | 37 | 31 |
| ITPL, Whitefield | 46 | 32.5 |
| Ecospace, Bellandur ORR | 33.5 | 23.5 |
| Electronic City Ph 1 | 30.5 | 18 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Somanahalli Substation on OpenStreetMap |