Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedBorewell, BWSSB, Local authority (Town Municipal Council), OtherDeclared by the promoter
Metro, operationalabout 29.5 kmK.R. Puram
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion97%As of Q2 2026-27, promoter's return
Possession, agreement31 Dec 2025Agreement for sale, p. 15
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Receivable, sold plots₹107.65 CrAs of Q2 2026-27
Cost left₹89.36 CrAs of Q2 2026-27
Funding
Cost left vs buyer dues
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan
Sanctioned 18 Nov 2023
Escrow bank
ICICI Bank · MG Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
400 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bang on STRR. Reasonable rates compared to Prestige and Brigade, even though the project is just next to them. Clean land parcel without any high tension towers or drains. Huge central park part of the plan. Looking at other projects of…
HHimanshu Lohia29 Jun 2026★★★★★
One of the finest plotted developments on STRR. Slowly paving its way to the big leagues. Development work is coming out really well. Great work DNR!
Ppallavi Shanbhag23 Nov 2024★★★★★
Very good premium villa plots in close proximity to upcoming IT hub. Proposed highly equipped Club house and 1.5 acres of Central Park. Well planned drainage system with concrete 30-40 feet roads. A good investment for a longer run.🏠
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Dnr Solace in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Fire NOC
KSFES/NOC/268/2020 · issued 27 Jan 2021
✓Clear
Environmental clearance
SEIAA 104 CON 2020 · issued 4 Sep 2020
✓Clear
Airport height NOC
permissible top elevation 1018.07 m above mean sea level
Not verified yet: Recent price, plot area; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, plot area; Form 4 certified totals; Agreements in the Form 4 sold list; Plot area vs rest, by type; Unit mix filed; Unit types; K-RERA inventory; Transactions in this project; North Bengaluru, past year; Bengaluru, past year; North Bengaluru since 2022; This project vs North Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Plot price, plotted layouts within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields; Months to sell unsold stock.
The site
Zoning & hazards
Power lines and drains around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Club house; Completion, accountant; Schedule end; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Design consultants (Form 6).
Form 4
Estimated cost, at registration
₹133.88 Cr
Estimated cost, architect's and engineer's certificates
₹347.35 Cr
Cost left
₹89.36 Cr
Receivable, sold plots
₹107.65 Cr
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
ICICI Bank · MG Road
Designated account, collected
₹70.0 L in Q2 2026-27
Designated account, withdrawn
₹70.0 L in Q2 2026-27 (100% of that quarter's deposits)
Net amount withdrawable, Form 4
₹37,38,57,560
Escrow account, Q2 2026-27
Opened at ₹10.6 L, ₹49.0 L deposited from sales, ₹59.6 L withdrawn
Escrow account to date, Q2 2026-27
₹164.55 Cr deposited from sales, ₹164.55 Cr withdrawn
Track record
DOSL builder track
K-RERA registrations under this promoter
6
Marked completed
2
Past promised date, not completed
1
Not verified yet: Sold; Sold in the latest quarter; Estimated cost; Cost incurred; Collected from buyers; Land cost revision; Sold vs unsold; Sold per quarter; K-RERA inventory; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB, Local authority (Town Municipal Council), Other
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot