A project that really stands out for its customer-centric approach, construction speed, quality, and value for money. The sales and CRM teams are responsive, and the management appears focused on timely delivery. Construction is progressing…
SSaurabh S12 Sep 2026★★★★★
Decent construction quality and conveniently located near Whitefield, The construction quality looks good, the pricing is fantastic, and the amenities are quite impressive. The construction is also progressing at a good pace, so it looks…
KK C Renuka12 Sep 2026★★★★★
Don't trust DS Max Builder, at time of booking they act too nice and promise of refund in case of issues and we can't proceed further with the sale agreement. Its been 10 months since I have cancelled an apartment and they haven't initiated…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ds Max Sky Fields in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
The site
Zoning & hazards
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹7.50 Cr 4.9%Development · ₹145.81 Cr 95.1%
Form 4
Estimated cost, at registration
₹153.31 Cr
Estimated cost, architect's and engineer's certificates
₹144.31 Cr
Cost incurred
₹72.62 Cr (47.4% of the estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (245) 28.2%Unsold (625) 71.8%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
204 / 870 · 666 available
Sold, Q4 2025-26
213 / 870 · 657 available
Sold, Q1 2026-27
239 / 870 · 631 available
Sold, Q2 2026-27
245 / 870 · 625 available
Unsold, Q2 2026-27
625
Sold in Q4 2025-26
9
Sold in Q1 2026-27
26
Sold in Q2 2026-27
6
Flats booked, Form 4 Q4 2025-26
213
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Punjab National Bank · M G Road, Bengaluru
Designated account, collected
₹17.97 Cr in Q2 2026-27
Designated account, withdrawn
₹17.97 Cr in Q2 2026-27 (100% of that quarter's deposits)
Net amount withdrawable, Form 4
₹24,38,45,350
Share of collections deposited in escrow
100%
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
46
Marked completed
26
Past promised date, not completed
6
Other phases under this promoter name
39
With a filed extension or completion
22 (19 completed, 3 extended)
Average schedule slip
22 months
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Hosakote taluk average, July 2023: 22.6 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Borewell, Local authority (Samethanahalli Panchayath)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot