Overview
Ecl Petals
Overview
Ecl Petals
Overview
Ecl Petals
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BIAPPA) | Sanctioned 3 Nov 2022 · No. BIAAPA/TP/LAO/14/2022-23 | |
|---|---|---|
| Fire department | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹2.78 Cr 53.4%Development · ₹2.43 Cr 46.6%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 24 Apr 2022 | Review |
| Building plan (BIAPPA) | Sanctioned 3 Nov 2022 | |
| Escrow bank | Bank of Baroda · Personal Banking Branch |
Data room
130 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ecl Petals in the interactive atlas
Covers 91/1 only
Approval or registration
Land use converted
342817 · Survey 91/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Rural · Survey 89/1, 89/2, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Covers 91/2 only
Approval or registration
Land use converted
DC Bangalore Rural · Survey 89/1, 89/2, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Covers 89/2 only
Approval or registration
Khata issued
E Khatha · TMC Devanahalli · Survey 89/2
K-RERA filing, land schedule
Covers 89/1, 89/3, 89/4 only
Approval or registration
Khata issued
E Khatha · TMC Devanahalli · Survey 89/1, 91/1, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · TMC Devanahalli · Survey 89/1, 91/1, 89/3, 89/4 and 1 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/LAO/14/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/290423/005902
K-RERA registration
Title checkTransfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 24 Apr 2022 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 14,640 sq m | |
| Extent the filed land schedule names for these survey numbers | 12,646 sq m | |
| Plot area against the filed extent | 1.16 times | |
| Village, hobli and taluk on the KGIS map | Akkupete, Kasaba hobli, Devanahalli taluk | |
| Mutation entry | None open on 6 of 6 filed surveys |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 89-1, 89-2, 91-1, 89-3, 89-4, 91-2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 14,640 sq m (the project holds a share) | |
| Khata | E Khatha · TMC Devanahalli · 2 Aug 2022; E Khatha · TMC Devanahalli · 6 Jun 2022 |
| Sy. No. 89/1 | Not read yet | 0 | ||||
| Sy. No. 89/2 | Not read yet | 0 | ||||
| Sy. No. 89/3 | Not read yet | 0 | ||||
| Sy. No. 89/4 | Not read yet | 0 | ||||
| Sy. No. 91/1 | Not read yet | 0 | ||||
| Sy. No. 91/2 | Not read yet |
| SEIAA |
|---|
| Filed with the registration |
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 89-1, 89-2, 89-3, 89-4, 91-2 | Converted 6 Jun 2022 · DC Bangalore Rural | |
| Sy 91-1 | Converted 6 Jun 2022 · 342817 | |
| Survey numbers | 89-1 · 89-2 · 91-1 · 89-3 · 89-4 · 91-2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Ekta Elements | about 7 km | Locked |
|---|
| Fortius Good Earth | about 11 km | Locked |
|---|
| Earth Aroma Phase-2 | about 11.5 km | Locked |
|---|
| Earth Aroma | about 12 km | Locked |
|---|
| Ecl Petals This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Ekta Elements | about 7 km | 31 Dec 2027 | – | Locked |
| Fortius Good Earth | about 11 km | 31 Dec 2027 | – | Locked |
| Earth Aroma Phase-2 | about 11.5 km | 31 Dec 2025 | – | Locked |
| Earth Aroma | about 12 km | 31 Dec 2024 | – | Locked |
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Plots in them | 3,461 | |
| Booked | 2,235 of 3,461 (65%) | |
| Unsold | 1,226 | |
| Booked a month, pooled | 46 plots | |
| Months to sell, pooled | 22 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 94% Agriculture, 6% Residential (main), over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 18.5 km, Shankrappa Layout, MAruthi nagar | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| RERA completion date | 31 Dec 2024 | Red flag |
|---|---|---|
| Work began, as filed | 10 Feb 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Chartered accountant's certificate, registration | Dated 8 Feb 2023 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹5.20 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹2.30 Cr |
| Escrow bank | Bank of Baroda · Personal Banking Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 26.5 km, K.R. Puram | |
| Metro, under construction | about 4.5 km, KIA Terminal |
| Kempegowda Airport | 10.5 | 4 |
| MG Road (CBD) | 36 | 31 |
| Manyata Tech Park | 31.5 | 23.5 |
| ITPL, Whitefield | 42 | 28 |
| Ecospace, Bellandur ORR | 52.5 | 34.5 |
| Electronic City Ph 1 | 56 | 44.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south |