Overview
Embassy Grove
Overview
Embassy Grove
Overview
Embassy Grove
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Approvals
| Fire department | Filed with the registration | |
|---|---|---|
| Environmental clearance | SEIAA 44 CON 2011 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹209.13 Cr 35.3%Development · ₹383.73 Cr
Loan & collateral
| Escrow bank | HDFC · KB Road |
|---|
Data room
69 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 77 SkyWithdrawn | DivyaSree Infrastruture Projects Private Limited | Mixed development | – | Dec 2018 |
| Century RegaliaActive · 74% built | Century Real Estate | Apartment | 2,375–4,780 sqft | Apr 2029 |
| Century Regalia (Project 2)Active · 32% built | Suruchi Properties Private Limited | Apartment | 1,266–2,153 sqft carpet (as filed) | Feb 2030 |
| Chick Cottage ResidencesCompleted · OC 19-03-2021 | Tree of Life Dwellings LLP | Apartment | – | Completed |
| Construction Of 336 (G+3) Houses At ShanthinagarRegistered · no quarterly update yet | karnataka slum development board | Apartment | 323 sqft carpet (as filed) | Oct 2026 |
| Diamond District | India Builders Corporation (IBC) | Apartment | 1,150–3,000 sqft | – |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Embassy Grove in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 32,071 sq m |
|---|
| RERA extensions | Granted · Approved 30 Nov 2019 | |
|---|---|---|
| RERA completion date | 31 Mar 2023 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Century Regalia (Project 2), price locked; Aydin Infra Signature 3, price locked.
| Century Regalia (Project 2) | 340 m | Locked | |
|---|---|---|---|
| Ranka Iris | about 1.5 km | Locked | |
| Aydin Infra Signature 3 | 3.4 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3.5 km | Locked | |
| Adarsh Parkland | 6.6 km | Locked | |
| Vista Svara | about 7 km | Locked | |
| Adarsh Rosewood | 6.8 km | Locked | |
| Legacy Saviero | about 7.5 km | Locked | |
| SOBHA Neopolis | 7.6 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 7.5 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 7.5 km | Locked | |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 7.5 km | Locked |
| Embassy Grove This project | This project is the point the others are measured from | 31 Mar 2023 | – | Not verified yet |
|---|---|---|---|---|
| Century Regalia (Project 2) | 340 m | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Ranka Iris | about 1.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Aydin Infra Signature 3 | 3.4 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3.5 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Adarsh Parkland | 6.6 km | – | – | Locked |
| Vista Svara | about 7 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Rent, 5+BHK, 3 km | ₹1,49,000 /mo · 5 listings | |
|---|---|---|
| Rent, 4BHK, 3 km | ₹67,500 /mo · 8 listings | |
| Rent, 3BHK, 3 km | ₹63,000 /mo · 124 listings | |
| Rent, 2BHK, 3 km | ₹35,900 /mo · 272 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 172 listings | |
| Rent per sq ft, 3 km | ₹38.9 /mo, as listed · 217 listings with a size |
| Projects within 4 km, counted | 15 (8 with an approximate location) | |
|---|---|---|
| Villas in them | 1,452 | |
| Booked | 936 of 1,452 (64%) | |
| Unsold | 516 | |
| Booked a month, pooled | 13 villas | |
| Months to sell, pooled | 40 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 220 m from the site | Clear |
| Nearest government-flagged flood location | 340 m, BDA Layout Konena Agrahara |
| Nearest storm drain | 40 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 360 m to the south, an unnamed water body |
| Completed, occupancy certificate 6 Sep 2019 |
| Schedule end | 30 May 2019 | |
|---|---|---|
| RERA completion date | 31 Mar 2023 | |
| Work began, as filed | 22 Sep 2011 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Environmental clearance | SEIAA 44 CON 2011 |
|---|
| Estimated cost, at registration | ₹592.86 Cr |
|---|
Sold (69) 65.1%Unsold (37) 34.9%
| Villas sold, at completion | 69 | |
|---|---|---|
| Villas unsold, at completion | 37 | |
| Villas in the phase | 106 |
| Escrow bank | HDFC · KB Road |
|---|
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| DivyaSree 77 East | DivyaSree Developers | Villa | 5,851–6,154 sqft | – |
| DivyaSree 77 LifeCompleted · OC 24-12-2025 | DivyaSree Developers | Apartment | 2,400–4,200 sqft | Completed |
8 of 25 other projects in Old Airport Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 130 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 40 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 896 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.5 km, Indiranagar | |
| Metro, under construction | 4.2 km, Agara |
| Kempegowda Airport | 38.2 | 41 | 27.4 |
| MG Road (CBD) | 6.7 | 10 | 5.5 |
| Manyata Tech Park | 14.6 | 19 | 10.1 |
| ITPL, Whitefield | 16.6 | 20 | 9.9 |
| Ecospace, Bellandur ORR | 13.3 | 18 | 5.0 |
| Electronic City Ph 1 | 19.2 | 24 | 13.6 |
| Landfill or waste transfer station | 670 m to the east | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the east, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 440 m to the north, named BESCOM Electrical Substation on OpenStreetMap |