Overview
Gallium At Brigade El Dorado
Overview
Gallium At Brigade El Dorado
Overview
Gallium At Brigade El Dorado
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 2 pages, English.
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | The booking amount |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹13.17 Cr 8.2%
Loan & collateral
| Escrow bank | HDFC · Richmond Road |
|---|
Data room
100 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 73 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
All 79 projects in Bagalur → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Gallium At Brigade El Dorado in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 17,395 sq m |
|---|
Valid as of this reportValidity ended
| Fire NOC | Filed with the registration | |
|---|---|---|
| Environmental clearance | SEIAA 102 CON 2018 · issued 3 Aug 2018 | Clear |
| Airport height NOC (1 of 2) | issued 28 Aug 2017 · validity ended 27 Aug 2025 | |
| Airport height NOC (2 of 2) | issued 1 Sep 2017 · validity ended 31 Aug 2025 | |
| Pollution board (CFE) | consent order W-336006 · issued 4 Feb 2023 |
| RERA extensions | None on the filing |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Defect liability | 5 years |
|---|
| Assetz Sora & Saki Phase 2 | about 0.5 km | Locked |
|---|
| Assetz Sora & Saki Phase 3 | about 0.5 km | Locked |
|---|
| Kumar Plumeria | about 2.5 km | Locked |
|---|
| Birla Trimaya | about 5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5.5 km | Locked |
|---|
| Varnam Phase 1c | about 5.5 km | Locked |
|---|
| Assetz Zen & Sato | about 5.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | Locked |
|---|
| Sattva City | about 6 km | Locked |
|---|
| Godrej MSR City | about 6.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 6.5 km | Locked |
|---|
| Gallium At Brigade El Dorado This project | This project is the point the others are measured from | 30 Sep 2024 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 0.5 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | about 0.5 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
| Kumar Plumeria | about 2.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
| Birla Trimaya | about 5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
| Birla Trimaya Phase-2 | about 5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
| Birla Trimaya Phase-3 | about 5.5 km | 31 Aug 2030 | 95% (439 of 463) | Locked |
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 16,365 | |
| Booked | 11,199 of 16,365 (68%) | |
| Unsold | 5,166 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 13 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 9 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 1 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Completion | Completed, occupancy certificate 10 Feb 2023 |
|---|
| Possession, agreement | 31 Dec 2023 | |
|---|---|---|
| Schedule end | 3 Jan 2022 | |
| Work began, as filed | 16 Apr 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | SEIAA 102 CON 2018 · issued 3 Aug 2018 |
| Estimated cost, at registration | ₹161.17 Cr |
|---|
Sold (498) 99.8%Unsold (1) 0.2%
| Flats sold, at completion | 498 | |
|---|---|---|
| Flats unsold, at completion | 1 | |
| Flats in the phase | 499 |
| Escrow bank | HDFC · Richmond Road | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 3 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Metro, operational | about 16 km, K.R. Puram | |
| Metro, under construction | about 6 km, Airport City |
| Kempegowda Airport | 13 | 6.5 |
| MG Road (CBD) | 24.5 | 20.5 |
| Manyata Tech Park | 18 | 13 |
| ITPL, Whitefield | 29 | 18.5 |
| Ecospace, Bellandur ORR | 35.5 | 24.5 |
| Electronic City Ph 1 | 44.5 | 34 |
| Landfill or waste transfer station | about 1.5 km, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Bagalur Substation on OpenStreetMap |