Overview
Golden Horizon
Overview
Golden Horizon
Overview
Golden Horizon
Overview
Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 1 Sep 2025 · No. BBMP/Ad.Com./RJH/0211/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹14.00 Cr 32.5%Development · ₹29.00 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 1 Sep 2025 | |
| Escrow bank | CITY UNION BANK · Banashankari |
Data room
102 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaradhya GardensRegistered · no quarterly update yet | SAI SAMRUDHI CONSTRUCTIONS | Apartment | 992 sqft carpet (as filed) | Dec 2028 |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aashirvad's Panchamukhi ShreyodhamaCompleted (regulator flag) | RAJESHWARI AASHIRVAD INFRA PROJECTS PRIVATE LIMITED | Plot | ~1,650 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
8 of 121 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Golden Horizon in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Apr 2028 |
| Land conversion | Converted 11 Aug 2004 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 11/10 · 11/11 · 11/21 · 11/30 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 8 | 6,738 |
| 2.5BHK | 16 | 14,833 |
| 3BHK | 28 | 28,578 |
| Samaya Sunshine | about 2 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | about 2 km | Locked | |
| Good Earth Cadence | about 3 km | Locked | |
| Sumadhura Pramoda | about 4.5 km | Locked | |
| Sobha Royal Crest | about 6 km | Locked | |
| Jhanavi Trishul Alaska | about 6 km | Locked | |
| Garden Square | about 6.5 km | Locked | |
| Srivara Vasudha | about 7 km | Locked | |
| Mahindra Eden Phase-2 | about 7 km | Locked | |
| Song Of Wind | about 7.5 km | Locked | |
| Axis Amarissa | about 8 km | Locked | |
| Sattva Forest Ridge | about 9 km | Locked |
| Golden Horizon This project | This project is the point the others are measured from | 30 Apr 2028 | – | Not verified yet |
|---|---|---|---|---|
| Samaya Sunshine | about 2 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Good Earth Ochre | about 2 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Good Earth Cadence | about 3 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 0.5 km, Kengeri Yellamma temple | |
| Government land in the filed surveys | Sy 11: 1% of the parent survey, 0.3 of 30.39 acres | Review |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Gangashetty Kere |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.06 (55 covered spaces for 52 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 30 Apr 2028 | |
|---|---|---|
| Schedule end | 30 Apr 2028 | |
| RERA completion date | 30 Apr 2028 | |
| Work began, as filed | 11 Sep 2025 |
| Building heights, fire NOC | 14.99 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 35 sq m |
|---|
| Architect's certificate, registration | Dated 30 Jan 2026 · site inspected 29 Jan 2026 | |
|---|---|---|
| Engineer's certificate, registration | Dated 30 Jan 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹43.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹29.00 Cr |
| Escrow bank | CITY UNION BANK · Banashankari |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Dec 2028 |
| 72% (104 of 145) |
| Locked |
| Sumadhura Pramoda | about 4.5 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Sobha Royal Crest | about 6 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Jhanavi Trishul Alaska | about 6 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Projects within 4 km, counted | 27 (27 with an approximate location) | |
|---|---|---|
| Flats in them | 6,644 | |
| Booked | 3,716 of 6,644 (56%) | |
| Unsold | 2,928 | |
| Booked a month, pooled | 53 flats | |
| Months to sell, pooled | 41 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 1.5 km, Kengeri | |
| Metro, under construction | about 12 km, Kalena Agrahara |
| Kempegowda Airport | 51.5 | 41.5 |
| MG Road (CBD) | 18.5 | 15.5 |
| Manyata Tech Park | 29 | 22 |
| ITPL, Whitefield | 36 | 29 |
| Ecospace, Bellandur ORR | 28 | 21.5 |
| Electronic City Ph 1 | 27.5 | 22 |
| Landfill or waste transfer station | about 2.5 km to the north-east | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Doddabele 40MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north, named Hindu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km, named Provident Sunworth Substation on OpenStreetMap |