Overview
Green Boulevard
Overview
Green Boulevard
Overview
Green Boulevard
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DISTRICT COMMISSIONER · Survey 182/10
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 10 Jan 2022 | |
| Escrow bank | South Indian Bank Ltd. · CANTONMENT BRANCH |
Data room
146 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | 1 | Review |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green Boulevard in the interactive atlas
Transfer of the land
Sale deed
Survey 182/10
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · PDO HANDENAHALLI GRAMA PANCHAYATHI · Survey 182/10
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan APA/CC/521-2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/310322/004804
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,95,799 sq m | |
| Land area filed with K-RERA | 12,545 sq m | |
| Village, hobli and taluk on the KGIS map | Bikkanahalli, SARJAPURA3 hobli, ANEKAL taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 182/10 | |
|---|---|---|
| Land extent, Sy 182/10 | 3, 04 GUNTAS | |
| Whole survey numbers on the KGIS map | 1,95,799 sq m (the project holds a share) | |
| Land area of this registration | 12,545 sq m | |
| Khata | A Khatha · PDO HANDENAHALLI GRAMA PANCHAYATHI · 21 Dec 2021 | |
| Sale deed | Dated 25 Sep 2019 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 182/10 | 1 | 3 acres 4 guntas | 48 acres 15 guntas | Differs: 45 acres 11 guntas apart | 0 |
Valid as of this reportValidity ended
| Building plan (BMRDA) | Sanctioned 10 Jan 2022 · No. APA/CC/521-2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/590/2025 · issued 16 Jan 2026 · building height 44.95 m | Clear |
| Environmental clearance | SEIAA 282 CON 2025 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/101025/2084788 | |
| Pollution board (CFE) | consent order CTE-351749 · issued 8 Dec 2025 · valid until 29 Nov 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 15 Mar 2027 |
| Land conversion | Converted 18 Aug 2017 · DISTRICT COMMISSIONER | |
|---|---|---|
| Survey numbers | 182/10 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 52 m² 69%3BHK · avg 69 m² 21.4%1BHK 9.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 32 | 7,987 |
| 2BHK | 232 | 1,28,995 |
| 3BHK | 72 | 53,626 |
| Sold, Q2 2026-27 | 319 / 336 | |
|---|---|---|
| Unsold, Q2 2026-27 | 17 | |
| Months to sell, derived from filed bookings | 6 months |
| Suyug's Saffron | about 2.5 km | Locked | |
|---|---|---|---|
| Engrace Vista | about 3.5 km | Locked | |
| Engrace 4 | about 3.5 km | Locked | |
| Sowparnika Olivia Nest | about 3.5 km | Locked | |
| Engrace 3 | about 3.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 4 km | Locked | |
| Mitta Orrin | about 4 km | Locked | |
| Mahidhara Harmony | about 4.5 km | Locked | |
| Acorn Hive | about 5 km | Locked | |
| Vistar White Pearl | about 5 km | Locked | |
| Nambiar District 25 Phase 2 | about 5 km | Locked | |
| Royal Nest | about 5.5 km | Locked |
| Green Boulevard This project | This project is the point the others are measured from | 15 Mar 2027 | 95% (319 of 336) | Not verified yet |
|---|---|---|---|---|
| Suyug's Saffron | about 2.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
| Engrace Vista | about 3.5 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
| Engrace 4 | about 3.5 km | 31 Dec 2026 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 10.5 km, Gunjur | |
| Government land in the filed surveys | Sy 182: 10% of the parent survey, 4.77 of 47.77 acres | Review |
| Nearest storm drain | about 2.5 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity | |
|---|---|---|
| Electricity, built | 80% | |
| Covered parking per unit | 0.75 (252 covered spaces for 336 units) | |
| Power backup | Not declared |
As the promoter reported it
| Main structure | 100% · planned by 17 Apr 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 95% · planned by 1 Jan 2027 | |
| Completion | 92% | |
| Completion, accountant | 88.2% of the estimated cost spent |
| Schedule end | 1 Jan 2027 | |
|---|---|---|
| RERA completion date | 15 Mar 2027 | |
| Work began, as filed | 15 Mar 2022 |
| Building heights, fire NOC | 44.95 m on the fire NOC · 27 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/590/2025 · issued 16 Jan 2026 · building height 44.95 m | |
| Environmental clearance | SEIAA 282 CON 2025 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 9 Jul 2026 · site inspected 5 Jul 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.55 Cr 6.6%Development · ₹78.47 Cr 93.4%
| Estimated cost, at registration | ₹84.02 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹64.17 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹107.02 Cr | |
| Cost incurred | ₹94.38 Cr (88.2% of the Form 4 Q1 2026-27 estimate) | |
| Cost left | ₹12.64 Cr |
Sold (319) 94.9%Unsold (17) 5.1%
| Sold, Q3 2025-26 | 291 / 336 · 45 available | |
|---|---|---|
| Sold, Q4 2025-26 | 291 / 336 · 45 available | |
| Sold, Q1 2026-27 | 310 / 336 · 26 available | |
| Sold, Q2 2026-27 | 319 / 336 · 17 available | |
| Unsold, Q2 2026-27 | 17 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 19 | |
| Sold in Q2 2026-27 | 9 |
| Escrow bank | South Indian Bank Ltd. · CANTONMENT BRANCH | |
|---|---|---|
| Designated account, collected | ₹8.93 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.05 Cr in Q2 2026-27 (79% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹6,84,61,173 | |
| Withdrawn from the escrow account to date | ₹99,54,60,084 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 100% (145 of 145) |
| Locked |
| Sowparnika Olivia Nest | about 3.5 km | 30 Sep 2027 | 100% (211 of 211) | Locked |
|---|
| Engrace 3 | about 3.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 4 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Projects within 4 km, counted | 36 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 7,000 | |
| Booked | 3,233 of 7,000 (46%) | |
| Unsold | 3,767 | |
| Booked a month, pooled | 105 flats | |
| Months to sell, pooled | 33 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (HANDENAHALLI GRAMA PANCHAYAT) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2.5 km to the south-west, tertiary drain | |
|---|---|---|
| Metro, operational | about 10 km, Bommasandra | |
| Metro, under construction | about 14.5 km, Kadubeesanahalli |
| Kempegowda Airport | 55.5 | 41 |
| MG Road (CBD) | 33 | 24.5 |
| Manyata Tech Park | 37 | 28.5 |
| ITPL, Whitefield | 22.5 | 17 |
| Ecospace, Bellandur ORR | 21.5 | 14.5 |
| Electronic City Ph 1 | 20.5 | 11 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the east |