Photo: suman .RTitle & ownership
Approvals
| Building plan (BIAPPA) | Sanctioned 12 Mar 2026 · No. BIAAPA/TP/CC/484/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹75.60 Cr 37%Development · ₹128.59 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 12 Mar 2026 | |
| Escrow bank | HDFC · SARJAPURA |
Data room
135 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Axis OaklynCompleted · OC 27-04-2026 | AXIS CONCEPT CONSTRUCTION PVT LTD | Apartment | 707–958 sqft carpet (as filed) | Completed |
| Century OneWorld SerayaActive · 92% built | Century Real Estate | Plot | 1,194–3,616 sqft | May 2029 |
| Dhiraan NorthbrookLapsed · completion date passed | dhiraan infrastructure pvt.ltd | Apartment | – | Dec 2024 |
| Millionaire TowerActive · 21% built | ARTISMO | Mixed development | 301–1,123 sqft carpet (as filed) | Sep 2029 |
| Purva Aerocity | Puravankara | Apartment | 1,187–2,046 sqft | Dec 2029 |
| Ramya Water FrontActive · 45% built | RAMYA ESTATES | Villa | 3,220 sqft carpet (as filed) | Jun 2027 |
| Sattva CityActive · 7% built | Sattva Group | Apartment | 1,316–2,975 sqft | Feb 2032 |
| Smr Vinay GatewayLapsed · completion date passed | SMR BLUE VALLEY PROJECTS PRIVATE LIMITED | Apartment | 323–1,012 sqft carpet (as filed) | Sep 2024 |
8 of 9 other projects in Chikkajala, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Hanging Gardens in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Clear |
| Environmental clearance | SEIAA 230 CON 2025 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 24 Sep 2030 |
| Land conversion | Converted 21 Mar 2025 · 3 Acres 33 Guntas | |
|---|---|---|
| Survey numbers | 24/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 102 m² 74.4%4BHK · avg 139 m² 16.3%2BHK · avg 79 m² 9.3%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 16 | 846 |
| 3BHK | 128 | 1,094 |
| 4BHK | 28 | 1,496 |
| Riviera Glade | about 3 km | Locked | |
|---|---|---|---|
| Sattva City | about 3 km | Locked | |
| Assetz Zen & Sato | about 4 km | Locked | |
| Kumar Plumeria | about 4.5 km | Locked | |
| Tnm Lakeview | about 4.5 km | Locked | |
| Barca II At Godrej Msr City | about 5 km | Locked | |
| Godrej MSR City | about 5 km | Locked | |
| Assetz Sora & Saki Phase 3 | about 5 km | Locked | |
| Birla Trimaya Phase-2 | about 5 km | Locked | |
| Assetz Sora & Saki Phase 2 | about 5.5 km | Locked | |
| Birla Trimaya | about 5.5 km | Locked | |
| Birla Trimaya Phase-3 | about 5.5 km | Locked |
| Hanging Gardens This project | This project is the point the others are measured from | 24 Sep 2030 | – | Not verified yet |
|---|---|---|---|---|
| Riviera Glade | about 3 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
| Sattva City | about 3 km | 28 Feb 2032 | 17% (425 of 2,491) | Locked |
| Assetz Zen & Sato | about 4 km | 31 May 2030 | 44% (202 of 456) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 93% Agriculture, 7% Transport & communication, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 7 km, Kondappa layout | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · Power Backup · Water and Sanitation · Lounge | |
|---|---|---|
| Covered parking per unit | 1.13 (194 covered spaces for 172 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 24 Sep 2030 | |
|---|---|---|
| Schedule end | 24 Sep 2030 | |
| RERA completion date | 24 Sep 2030 | |
| Work began, as filed | 15 Mar 2026 |
| Building heights, fire NOC | 44.99 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 80 sq m |
|---|
| Fire safety | KSFES/NOC/403/2025 · issued 19 Nov 2025 | |
|---|---|---|
| Environmental clearance | SEIAA 230 CON 2025 | |
| Architect's certificate, registration | Dated 2 Apr 2026 · site inspected 25 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 20 Mar 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹204.19 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹127.79 Cr | |
| Estimated cost, chartered accountant's certificate | ₹158.00 Cr |
| Escrow bank | HDFC · SARJAPURA |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Kumar Plumeria | about 4.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
|---|
| Tnm Lakeview | about 4.5 km | 31 Oct 2026 | 100% (36 of 36) | Locked |
|---|
| Barca II At Godrej Msr City | about 5 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
|---|
| Projects within 4 km, counted | 13 (13 with an approximate location) | |
|---|---|---|
| Flats in them | 5,274 | |
| Booked | 1,692 of 5,274 (32%) | |
| Unsold | 3,582 | |
| Booked a month, pooled | 81 flats | |
| Months to sell, pooled | 42 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 17.5 km, Yeshwantpur | |
| Metro, under construction | about 1 km, Bettahalasuru |
| Kempegowda Airport | 13 | 9.5 |
| MG Road (CBD) | 23 | 20.5 |
| Manyata Tech Park | 18 | 13 |
| ITPL, Whitefield | 33.5 | 22.5 |
| Ecospace, Bellandur ORR | 38.5 | 26.5 |
| Electronic City Ph 1 | 43 | 36 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named VIdyanagara Substation on OpenStreetMap |