Overview
J P Lotus
Overview
J P Lotus
Overview
J P Lotus
Overview
Title & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹12.24 Cr |
|---|
Loan & collateral
| Escrow bank | Canara Bank · Hosakote |
|---|
Data room
50 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open J P Lotus in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| 21 Oct 2021 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Godrej Parkshire (Hoskote), price locked.
| J P Lotus This project | This project is the point the others are measured from | 21 Oct 2021 | – | Not verified yet |
|---|---|---|---|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 48% Residential (main), 31% Transport & communication, 11% Commercial (business), 8% Public & semi-public | |
|---|---|---|
| Nearest government-flagged flood location | 8.7 km, SAI BABA ASHRAM KADUGODI |
| Nearest storm drain | 1.2 km to the south-west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 350 m to the north, an unnamed water body |
| Completion | Completed, occupancy certificate 25 Sep 2020 |
|---|
| Schedule end | 10 Sep 2020 | |
|---|---|---|
| RERA completion date | 21 Oct 2021 | |
| Work began, as filed | 21 Jan 2019 |
| Structure | RCC framed structure |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Ceramic tiles (floor) | |
| Wiring | Fire-resistant wiring |
| Escrow bank | Canara Bank · Hosakote |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Riqueza Siri | about 2.5 km | Locked |
|---|
| Triaxis Splendour + | about 2.5 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | 3.3 km | Locked |
|---|
| Neighbourhood Tree Park | about 3.5 km | Locked |
|---|
| Sowparnika Indradhanush Phase I | about 4.5 km | Locked |
|---|
| Sowparnika Shivadhanush | 4.3 km | Locked |
|---|
| Definer Upper Deck | about 4.5 km | Locked |
|---|
| Godrej Woodscapes | about 4.5 km | Locked |
|---|
| Sattva Songbird | 4.6 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Riqueza Siri | about 2.5 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| Triaxis Splendour + | about 2.5 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| Godrej Parkshire (Hoskote) | 3.3 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
|---|
| Rent, 1BHK, 3 km | ₹9,250 /mo · 6 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹25.0 /mo, as listed · 9 listings with a size |
| Projects within 4 km, counted | 37 (27 with an approximate location) | |
|---|---|---|
| Flats in them | 8,861 | |
| Booked | 4,080 of 8,861 (46%) | |
| Unsold | 4,781 | |
| Booked a month, pooled | 214 flats | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 6.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.2 km to the south-west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Ground level | 879 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.3 km, Whitefield | |
| Metro, under construction | 13.8 km, Saraswathi Nagar |
| Kempegowda Airport | 25.6 | 31 | 15.9 |
| MG Road (CBD) | 24.7 | 25 | 22.5 |
| Manyata Tech Park | 24.2 | 27 | 17.8 |
| ITPL, Whitefield | 16.4 | 16 | 11.1 |
| Ecospace, Bellandur ORR | 26.9 | 29 | 19.9 |
| Electronic City Ph 1 | 39.6 | 43 | 28.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 3.0 km to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 750 m to the south-east, named Hoskote on OpenStreetMap |