Overview
Jasper And Iridium At Brigade El Dorado
Overview
Jasper And Iridium At Brigade El Dorado
Overview
Jasper And Iridium At Brigade El Dorado
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 23 Jan 2020 |
|---|
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹22.43 Cr 7.7%Development · ₹267.00 Cr
Loan & collateral
| Records searched to | 23 Jan 2020 | Review |
|---|---|---|
| Escrow bank | HDFC · World Trade Centre |
Data room
135 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 73 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
All 79 projects in Bagalur → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jasper And Iridium At Brigade El Dorado in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 29,147 sq m |
|---|
| RERA extensions | None on the filing |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Assetz Sora & Saki Phase 2 | about 0.5 km | Locked |
|---|
| Assetz Sora & Saki Phase 3 | about 0.5 km | Locked |
|---|
| Kumar Plumeria | about 2.5 km | Locked |
|---|
| Birla Trimaya | about 5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5 km | Locked |
|---|
| Varnam Phase 1c | about 5.5 km | Locked |
|---|
| Assetz Zen & Sato | about 5.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | Locked |
|---|
| Sattva City | about 6 km | Locked |
|---|
| Godrej MSR City | about 6.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 6.5 km | Locked |
|---|
| Jasper And Iridium At Brigade El Dorado This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 0.5 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | about 0.5 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
| Kumar Plumeria | about 2.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
| Birla Trimaya | about 5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
| Birla Trimaya Phase-2 | about 5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
| Birla Trimaya Phase-3 | about 5 km | 31 Aug 2030 | 95% (439 of 463) | Locked |
| Projects within 4 km, counted | 19 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 16,365 | |
| Booked | 11,199 of 16,365 (68%) | |
| Unsold | 5,166 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 13 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 9 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 1 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Schedule end | 30 Oct 2024 | |
|---|---|---|
| Work began, as filed | 21 May 2020 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration |
| Estimated cost, at registration | ₹289.43 Cr |
|---|
| Escrow bank | HDFC · World Trade Centre |
|---|
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 3 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Metro, operational | about 16 km, K.R. Puram | |
| Metro, under construction | about 6 km, Airport City |
| Kempegowda Airport | 12.5 | 6.5 |
| MG Road (CBD) | 24 | 20.5 |
| Manyata Tech Park | 17.5 | 13 |
| ITPL, Whitefield | 29 | 19 |
| Ecospace, Bellandur ORR | 35 | 24.5 |
| Electronic City Ph 1 | 44 | 34 |
| Landfill or waste transfer station | about 1.5 km, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Bagalur Substation on OpenStreetMap |