Overview
Karishma Crystal
Overview
Karishma Crystal
Overview
Karishma Crystal
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 100 TreesCompleted · OC 08-06-2021 | ADIGA PROPERTY DEVELOPERS | Apartment | – | Completed |
| Akshaya RegaliaCompleted (regulator flag) | AKSHAYA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| Anitha RegencyLapsed · completion date passed | SHAKTHI INFRASTRUCTURE | Apartment | 794 sqft carpet (as filed) | Mar 2024 |
| Anu GreensLapsed · completion date passed | Jyothi P | Plot | ~1,200–1,670 sqft (estimate: filed carpet plus 25%) | Jun 2024 |
| Arkha SanctuaryCompleted (regulator flag) | ARKHA DEVELOPERS | Apartment | 793–945 sqft carpet (as filed) | Completed |
| Casper ValleyRegistered · no quarterly update yet | AURA WAVE ESTATES LLP | Plot | ~1,060–2,000 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 May 2019 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹18.00 Cr |
|---|
Loan & collateral
| Escrow bank | Karnataka Bank Ltd. · R R NAGAR |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 4 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Century CentralCompleted (regulator flag) | Century joint Development Private Limited | Mixed development | – | Completed |
| Comfot HeightsLapsed · completion date passed | Comfort Builders and Developers | Apartment | 1,015 sqft carpet (as filed) | Oct 2020 |
8 of 65 other projects in Uttarahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Karishma Crystal in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 1,021 sq m |
|---|
| Sobha Royal Crest | about 2 km | Locked |
|---|
| Garden Square | about 2.5 km | Locked |
|---|
| Samaya Sunshine | about 2.5 km | Locked |
|---|
| Sumadhura Pramoda | about 3 km | Locked |
|---|
| Song Of Wind | about 3.5 km | Locked |
|---|
| Srivara Vasudha | about 4.5 km | Locked |
|---|
| Adarsh Premia | about 4.5 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 5 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 5 km | Locked |
|---|
| Sattva Forest Ridge | about 6.5 km | Locked |
|---|
| Good Earth Ochre | about 6.5 km | Locked |
|---|
| Good Earth Cadence | about 7 km | Locked |
|---|
| Karishma Crystal This project | This project is the point the others are measured from | 31 May 2019 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Royal Crest | about 2 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Garden Square | about 2.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Samaya Sunshine | about 2.5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sumadhura Pramoda | about 3 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Song Of Wind | about 3.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Srivara Vasudha | about 4.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
| Projects within 4 km, counted | 25 (25 with an approximate location) | |
|---|---|---|
| Flats in them | 4,318 | |
| Booked | 2,907 of 4,318 (67%) | |
| Unsold | 1,411 | |
| Booked a month, pooled | 64 flats | |
| Months to sell, pooled | 22 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, BEML Layout in RR Nagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| RERA completion date | 31 May 2019 | Red flag |
|---|---|---|
| Work began, as filed | 1 Nov 2017 |
| Escrow bank | Karnataka Bank Ltd. · R R NAGAR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Pattanagere | |
| Metro, under construction | about 8.5 km, J.P. Nagar 4th Phase |
| Kempegowda Airport | 38 |
| MG Road (CBD) | 11.5 |
| Manyata Tech Park | 18.5 |
| ITPL, Whitefield | 25 |
| Ecospace, Bellandur ORR | 17.5 |
| Electronic City Ph 1 | 18.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Rajajeshwari Nagar on OpenStreetMap |