Overview
Kbl Enclave - Phase 2
Overview
Kbl Enclave - Phase 2
Overview
Kbl Enclave - Phase 2
Overview

Title & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 31 Jan 2023 · No. STRRPA/TP/LAO/38/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Kns Candrill | about 6.5 km | Locked |
|---|
Location & risks
Construction & progress

Developer
Land · ₹10.21 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 31 Jan 2023 | |
| Escrow bank | ICICI Bank · M.G ROAD |
Data room
199 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Airport CityLapsed · completion date passed | Srinivasa M | Plot | – | Dec 2021 |
| Arvind GreatlandsApplied for completion 16/12/2024 | Arvind SmartSpaces | Plot | 1,200–2,400 sqft | – |
| Assetz City Of PalmsActive · 86% built | ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED | Plot | ~1,200–2,020 sqft (estimate: filed carpet plus 25%) | Feb 2029 |
| Atmos SilverwoodsExtended to 31-05-2027 | ATMOS CONSTRUCTIONS PRIVATE LIMITED | Villa | 2,333 sqft carpet (as filed) | May 2027 |
| Canterburry MeadowsApplied for completion 10/05/2024 | ARUNAPANCHAMI ESTATES PRIVATE LIMITED | Plot | ~1,280 sqft (estimate: filed carpet plus 25%) | Mar 2020 |
| Canterbury HillviewApplied for completion 23/01/2023 | SLNS AVYUKTHA HOMES | Plot | – | Jul 2021 |
| Century GreensApplied for completion 12/07/2022 | Century Star | Plot | – | Dec 2021 |
| Century Greens Phase 2Applied for completion 07/04/2022 | CENTURY STAR | Plot | ~1,160–2,400 sqft (estimate: filed carpet plus 25%) | Dec 2021 |
8 of 38 other projects in Doddaballapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kbl Enclave - Phase 2 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 18/1, 18/3, 18/4 | Converted 28 Oct 2021 · DC-BANGALORE RURAL | |
| Sy 202 | Converted 27 Sep 2022 · DC-BANGALORE RURAL | |
| Survey numbers | 18/1 · 18/3 · 18/4 · 202 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Earth Aroma | about 8 km | Locked |
|---|
| Earth Aroma Phase-2 | about 8.5 km | Locked |
|---|
| Fortius Good Earth | about 9.5 km | Locked |
|---|
| Vaishnavi At-One Life IV | about 9.5 km | Locked |
|---|
| Kbl Enclave - Phase 2 This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Kns Candrill | about 6.5 km | 15 Jun 2029 | – | Locked |
| Earth Aroma | about 8 km | 31 Dec 2024 | – | Locked |
| Earth Aroma Phase-2 | about 8.5 km | 31 Dec 2025 | – | Locked |
| Fortius Good Earth | about 9.5 km | 31 Dec 2027 | – | Locked |
| Vaishnavi At-One Life IV | about 9.5 km | 18 Dec 2027 | – | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 20.5 km, Kondappa layout | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 3 km to the south-west, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Internal roads | 100% | |
|---|---|---|
| Completion | 100% |
| RERA completion date | 31 Dec 2025 | Review |
|---|---|---|
| Work began, as filed | 23 May 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Mar 2026 | Clear |
|---|---|---|
| Engineer's certificate, registration | Dated 7 Dec 2023 | |
| Chartered accountant's certificate, registration | Dated 29 Jan 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹14.96 Cr | |
|---|---|---|
| Estimated cost, chartered accountant's certificate | ₹14.96 Cr, same as the filing | |
| Estimated cost, Form 4 Q3 2025-26 | ₹11.31 Cr | |
| Cost left | ₹96.7 L |
| Escrow bank | ICICI Bank · M.G ROAD | |
|---|---|---|
| Designated account, collected | ₹35.7 L in Q3 2025-26 | |
| Designated account, withdrawn | ₹35.7 L in Q3 2025-26 (100% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹4,85,59,683 | |
| Withdrawn from the escrow account to date | ₹5,48,47,793 |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 31.2 m
Taluk average; not a reading at the site.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 0 of 3 CGWB wells in Doddaballapura taluk read in this class | |
| Through the year | January 2024: 3.7 m (3 wells), Pre-monsoon 2024: 5.6 m (3 wells), August 2024: 5.5 m (2 wells), depth below ground of CGWB's monitoring wells in Doddaballapura taluk (the median where there are several) | |
| Water supply, as filed | Local authority (DODDABALAPURA) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 3 km to the south-west, primary drain | |
|---|---|---|
| Metro, operational | about 28 km, Chikkabidarakallu | |
| Metro, under construction | about 14.5 km, Doddajala |
| Kempegowda Airport | 28 | 18.5 |
| MG Road (CBD) | 43 | 35.5 |
| Manyata Tech Park | 36 | 28 |
| ITPL, Whitefield | 59.5 | 39 |
| Ecospace, Bellandur ORR | 58.5 | 42.5 |
| Electronic City Ph 1 | 63 | 52 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Doddabalapura on OpenStreetMap |