Overview
Konduru Srinivasulu
Overview
Konduru Srinivasulu
Overview
Konduru Srinivasulu
Overview
Title & ownership
Approvals
| Building plan (BIAPPA) | Sanctioned 24 Jun 2011 · No. BIAPP/TP1/LAO/06/2011-12 |
|---|
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹1.25 Cr |
|---|
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 24 Jun 2011 | |
| Escrow bank | Punjab National Bank · HRBR Layout |
Data room
137 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Airport CityLapsed · completion date passed | Srinivasa M | Plot | – | Dec 2021 |
| Arvind GreatlandsApplied for completion 16/12/2024 | Arvind SmartSpaces | Plot | 1,200–2,400 sqft | – |
| Assetz City Of PalmsActive · 86% built | ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED | Plot | ~1,200–2,020 sqft (estimate: filed carpet plus 25%) | Feb 2029 |
| Atmos SilverwoodsExtended to 31-05-2027 | ATMOS CONSTRUCTIONS PRIVATE LIMITED | Villa | 2,333 sqft carpet (as filed) | May 2027 |
| Canterburry MeadowsApplied for completion 10/05/2024 | ARUNAPANCHAMI ESTATES PRIVATE LIMITED | Plot | ~1,280 sqft (estimate: filed carpet plus 25%) | Mar 2020 |
| Canterbury HillviewApplied for completion 23/01/2023 | SLNS AVYUKTHA HOMES | Plot | – | Jul 2021 |
| Century GreensApplied for completion 12/07/2022 | Century Star | Plot | – | Dec 2021 |
| Century Greens Phase 2Applied for completion 07/04/2022 | CENTURY STAR | Plot | ~1,160–2,400 sqft (estimate: filed carpet plus 25%) | Dec 2021 |
8 of 38 other projects in Doddaballapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Konduru Srinivasulu in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Applied for · Applied 1 Feb 2024 | |
|---|---|---|
| RERA completion date | 31 Jan 2024 |
| Land conversion | Converted 15 Apr 2009 · DC, Bangalore | |
|---|---|---|
| Survey numbers | 103/3 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Vaishnavi At-One Life IV | about 5.5 km | Locked |
|---|
| Earth Aroma | about 6 km | Locked |
|---|
| Earth Aroma Phase-2 | about 6 km | Locked |
|---|
| Fortius Good Earth | about 6.5 km | Locked |
|---|
| Konduru Srinivasulu This project | This project is the point the others are measured from | 31 Jan 2024 | – | Not verified yet |
|---|---|---|---|---|
| Vaishnavi At-One Life IV | about 5.5 km | 18 Dec 2027 | – | Locked |
| Earth Aroma | about 6 km | 31 Dec 2024 | – | Locked |
| Earth Aroma Phase-2 | about 6 km | 31 Dec 2025 | – | Locked |
| Fortius Good Earth | about 6.5 km | 31 Dec 2027 | – | Locked |
| Projects within 4 km, counted | 11 (11 with an approximate location) | |
|---|---|---|
| Plots in them | 2,197 | |
| Booked | 886 of 2,197 (40%) | |
| Unsold | 1,311 | |
| Booked a month, pooled | 45 plots | |
| Months to sell, pooled | 29 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 11.5 km, Attur, Near Dairy Circle |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
| Landfill or waste transfer station | None within 3 km |
|---|
| RERA completion date | 31 Jan 2024 | Red flag |
|---|---|---|
| Work began, as filed | 18 Jul 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | Punjab National Bank · HRBR Layout |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 18.5 km, Chikkabidarakallu | |
| Metro, under construction | about 10.5 km, Bettahalasuru |
| Kempegowda Airport | 27.5 | 17.5 |
| MG Road (CBD) | 33 | 27 |
| Manyata Tech Park | 26 | 20 |
| ITPL, Whitefield | 43 | 32.5 |
| Ecospace, Bellandur ORR | 48.5 | 35 |
| Electronic City Ph 1 | 53 | 43.5 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2 km to the north, named Substation on OpenStreetMap |
|---|