Approvals
| Building plan (BBMP) | Sanctioned 24 Dec 2021 · No. BBMP/Ad.Com/MDP/0458/21-22 |
|---|
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Floors in payment plan | Runs to floor 3 · filing: 4 floors |
|---|
| Defect liability | 5 years |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Flats having 16 (3 bedrooms) & 8 (2… 100%
Location & risks
Construction & progress
Developer
Land · ₹9.06 Cr 51.6%
Loan & collateral
| Developer's project loan | Private lender (individual) · ₹50.0 L disbursed | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 24 Dec 2021 | |
| Escrow bank | ICICI Bank · HSR LAYOUT |
Data room
139 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Is there any apartment available for resell?
Peaceful boutique apartment in Shubh Enclave, set in a well-connected area with a serene environment
Beautiful boutique apartments with great ambience in Shubh Enclave
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adithya Homes GrandCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditi TropicaLapsed · completion date passed | ADITI TROPICA | Apartment | – | Dec 2020 |
| Akshaya Temple TreeLapsed · completion date passed | Akshaya Builders Developers Promoters | Apartment | – | Jan 2023 |
| AlayaCompleted (regulator flag) | Essem18 Developers Private Limited | Apartment | 1,762 sqft carpet (as filed) | Completed |
| Alta MonteCompleted (regulator flag) | B S Nesara | Apartment | 1,133 sqft carpet (as filed) | Completed |
| Century MiraiActive · 11% built | Century Real Estate | Apartment | 742–4,111 sqft | Oct 2030 |
| Innovative PalaciaActive · 90% built | SHUBANKARA DEVELOPERS | Apartment | 789–959 sqft carpet (as filed) | Sep 2027 |
| Jeevan PristineCompleted (regulator flag) | M/s. Jeevan Developers | Apartment | – | Completed |
8 of 32 other projects in Marathahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Livium in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Power NOC | Filed with the registration |
|---|
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 10 Oct 2022 |
|---|
| RERA extensions | Granted · Approved 4 Nov 2025 | |
|---|---|---|
| RERA completion date | 1 May 2026 |
| Land conversion | Converted 19 Aug 1991 · Special Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | 2895/2700/1E |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats having 16 (3 bedrooms) & 8 (2 Bedrooms) | 24 | 938 |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2.5 km | Locked | |
|---|---|---|---|
| Adarsh Rosewood | about 3 km | Locked | |
| Satori Residence By Genurise | about 3 km | Locked | |
| Abhee Riviera Royale | about 3 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 3 km | Locked | |
| Aydin Infra Signature 3 | about 3.5 km | Locked | |
| Haven Phase 2 | about 4 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 4 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 4 km | Locked | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 4 km | Locked | |
| Mana Jardin Neo | about 4.5 km | Locked | |
| Adarsh Parkland | about 4.5 km | Locked |
| Livium This project | This project is the point the others are measured from | 1 May 2026 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2.5 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Adarsh Rosewood | about 3 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, Bellandur |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Kaikondanahalli Lake |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.13 (27 covered spaces for 24 units) | |
| Power backup | Declared by the promoter |
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
| Completion | Completed, occupancy certificate 1 Sep 2025 |
|---|
| Schedule end | 30 Dec 2023 | |
|---|---|---|
| RERA completion date | 1 May 2026 | |
| Completion date, agreement | 31 Dec 2023 | |
| Work began, as filed | 1 Dec 2021 |
| Building heights, fire NOC | 15 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 2580 sq m |
|---|
| Architect's certificate, registration | Dated 9 Jun 2022 · site inspected 8 Jun 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 17 Jun 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹17.56 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹8.50 Cr | |
| Estimated cost, engineer's certificate | ₹23.87 Cr |
Sold (24) 100%
| Flats sold, at completion | 24 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 24 |
| Escrow bank | ICICI Bank · HSR LAYOUT |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Satori Residence By Genurise | about 3 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
|---|
| Abhee Riviera Royale | about 3 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 3 km | 30 Dec 2030 | 69% (302 of 440) | Locked |
|---|
| Aydin Infra Signature 3 | about 3.5 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
|---|
| Projects within 4 km, counted | 55 (55 with an approximate location) | |
|---|---|---|
| Flats in them | 9,732 | |
| Booked | 4,893 of 9,732 (50%) | |
| Unsold | 4,839 | |
| Booked a month, pooled | 126 flats | |
| Months to sell, pooled | 35 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4 km, Kudlu Gate | |
| Metro, under construction | about 1 km, Ibbalur |
| Kempegowda Airport | 45 | 32 |
| MG Road (CBD) | 12.5 | 10 |
| Manyata Tech Park | 21.5 | 15.5 |
| ITPL, Whitefield | 17 | 11 |
| Ecospace, Bellandur ORR | 4.5 | 2 |
| Electronic City Ph 1 | 11.5 | 8.5 |
| Landfill or waste transfer station | about 2.5 km to the south-west, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km, named 250 KLD Water Reclamation Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 3 km to the south-west, named Kudlu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |