Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
Approvals
| Building plan (Local Planning Authority) | Sanctioned 28 Nov 2019 · No. STRRPA/TP/LAO/36/2017-18 |
|---|
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹17.52 Cr 40.1%Development · ₹26.20 Cr 59.9%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 18 Oct 2025 | |
| Building plan | Sanctioned 28 Nov 2019 | |
| Escrow bank | ICICI Bank · Attibele |
Data room
304 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 9 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 9 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahidhara Cmr Ppr Fortune City in the interactive atlas
| 13/1 | 20 Dec 2012Deputy Commissioner Bangalore Dist | No sale deed | 22 Dec 2023A Khatha · chikkanahalli | 1 Acre 17 Gunta |
|---|
| 13/2, 13/3 | 20 Dec 2012DEPUTY COMMISSIONER BANGALORE | No sale deed | 22 Dec 2023A Khatha · chikkanahalli | 27 Gunta + 1 Acre 33 Gunta |
|---|
| 13/4 | 20 Dec 2012DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · chikkanahalli | 1 Acre |
|---|
| 14/1, 14/2 | 20 Dec 2012DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · chikkanahalli | 21 Gunta + 1 Acre 32 Gunta |
|---|
| 22/1 | 20 Dec 2012DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · chikkana halli | 2 Acre 10 Gunta |
|---|
| 23 | 20 Dec 2012DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · Chikkana halli | 3 Acre 21 Gunta |
|---|
| 27/2 | 20 Dec 2012DEPUTY COMMISIONOR BANGALORE | No sale deed | 30 Dec 2023A Khatha · Chikkanahalli | 1 Acre 16 Guntas |
|---|
| 28 | 6 Jan 2010DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · Chikkanahalli | 3 Acre 28 Gunta |
|---|
| 30 | 6 Jan 2010DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · Chikkanahalli | 4 acrea 2.75 guntas |
|---|
| 31/1A | 20 Dec 2012DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · Chikkanahalli | 2 Acre 8 Gunta |
|---|
| 47/2 | 19 Feb 2009DEPUTY COMMISIONOR BANGALORE | No sale deed | 22 Dec 2023A Khatha · Chikkanahalli | 2 Acre 26 Gunta |
|---|
K-RERA filing, land schedule
The whole project
Transfer of the land
Title deed executed
Consideration ₹45.0 L · Anekal taluk
Title deed filed with K-RERA, pp. 1, 11, 19 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹45.0 L · Sy 14/1
Title deed filed with K-RERA, pp. 1, 15, 23 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan STRRPA/TP/LAO/36/2017-18
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/111124/007221
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 18 Oct 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: EC-13 2-RR, 2 pages.
Page 1
Page 1 of 4 of the survey sketch. Filed with K-RERA: Survey Sketch, 4 pages.
| Filed survey numbers matched to the KGIS map | 9 of 9 | |
|---|---|---|
| Matched part of the survey number | 1,17,926 sq m | |
| The whole survey number on the KGIS map | 1,71,170 sq m | |
| Extent the filed land schedule names for these survey numbers | 1,09,442 sq m | |
| Plot area against the filed extent | 1.08 times | |
| Village, hobli and taluk on the KGIS map | Chikkanahalli, Attibele-1 hobli, Anekal taluk | |
| Mutation entry | None open on 13 of 13 filed surveys |
Satellite map with the 9 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 9 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 13/1, 13/2, 13/3, 13/4, 14/1, 14/2 and 7 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 1,71,170 sq m (the project holds a share) | |
| Khata | A Khatha · chikkanahalli · 22 Dec 2023; A Khatha · chikkana halli · 22 Dec 2023; A Khatha · Chikkana halli · 22 Dec 2023; and 2 more | |
| Title deed | Consideration ₹21.0 L | |
| Title deed | Sy 13/4, Attibele hobli · 01 Acres. 17 Guntas | |
| Title deed | Consideration ₹43.0 L · Sy 28, Attibele hobli, Anekal taluk | |
| Title deed | Consideration ₹22.0 L | |
| Title deeds | And 3 more read from the filing |
| Sy. No. 13/1 | Not read yet | 0 | |||||
| Sy. No. 13/2 | Not read yet | 0 | |||||
| Sy. No. 13/3 | Not read yet | 0 | |||||
| Sy. No. 13/4 | Not read yet | 0 | |||||
| Sy. No. 14/1 | Not read yet | 0 |
| Power NOC | Filed with the registration |
|---|
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 30 Jan 2026 | |
|---|---|---|
| RERA completion date | 30 Oct 2026 |
| Land conversion | 13 of 13 parcels converted | |
|---|---|---|
| Sy 13/1 | Converted 20 Dec 2012 · Deputy Commissioner Bangalore Dist | |
| Sy 13/2, 13/3 | Converted 20 Dec 2012 · DEPUTY COMMISSIONER BANGALORE | |
| Sy 13/4, 14/1, 14/2, 22/1, 23, 27/2,… | Converted 20 Dec 2012 · DEPUTY COMMISIONOR BANGALORE | |
| Sy 28, 30 | Converted 6 Jan 2010 · DEPUTY COMMISIONOR BANGALORE | |
| Sy 47/2 | Converted 19 Feb 2009 · DEPUTY COMMISIONOR BANGALORE | |
| Survey numbers | 13/1 · 13/2 · 13/3 · 13/4 · 14/1 · 14/2 · 22/1 · 23 · 27/2 · 28 · 30 · 31/1A · 47/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 12 (12 with an approximate location) | |
|---|---|---|
| Plots in them | 3,107 | |
| Booked | 2,070 of 3,107 (67%) | |
| Unsold | 1,037 | |
| Booked a month, pooled | 72 plots | |
| Months to sell, pooled | 14 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 16.5 km, Doddakannelli | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
As the promoter reported it
| Internal roads | 100% | |
|---|---|---|
| Completion | 98% | |
| Completion, accountant | 66.5% of the estimated cost spent |
| RERA completion date | 30 Oct 2026 | Review |
|---|---|---|
| Work began, as filed | 15 Oct 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|
| Estimated cost, at registration | ₹43.72 Cr | |
|---|---|---|
| Cost incurred | ₹29.05 Cr (66.5% of the estimate) |
| Escrow bank | ICICI Bank · Attibele | |
|---|---|---|
| Designated account, collected | ₹1.77 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.17 Cr in Q2 2026-27 (66% of that quarter's deposits) | |
| Share of collections deposited in escrow | 66% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sy. No. 14/2 | Not read yet | 0 |
| Sy. No. 22/1 | Not read yet | 2 acres 10 guntas | 2 acres 11 guntas | Yes | 0 |
| Sy. No. 23 | Not read yet | 3 acres 21 guntas | 3 acres 28 guntas | Yes | 0 |
| Sy. No. 27/2 | Not read yet | 1 acre 16 guntas | 1 acre 14 guntas | Yes | 0 |
| Sy. No. 28 | Not read yet | 3 acres 28 guntas | 3 acres 37 guntas | Differs: 9 guntas apart | 0 |
| Sy. No. 30 | Not read yet | 4 acres 3 guntas | 5 acres 29 guntas | Differs: 1 acre 27 guntas apart | 0 |
| Sy. No. 31/1A | Not read yet | 2 acres 8 guntas | 2 acres 16 guntas | Differs: 8 guntas apart | 0 |
| Sy. No. 47/2 | Not read yet | 2 acres 26 guntas | 2 acres 22 guntas | Yes | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (CHIKKANAHALLI) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 11.5 km, Bommasandra | |
| Metro, under construction | about 19.5 km, Kadubeesanahalli |
| Kempegowda Airport | 68 | 47 |
| MG Road (CBD) | 33.5 | 29.5 |
| Manyata Tech Park | 44 | 34 |
| ITPL, Whitefield | 37 | 23 |
| Ecospace, Bellandur ORR | 31.5 | 19.5 |
| Electronic City Ph 1 | 15.5 | 13.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 3 km to the south-east, named Zuzuvadi on OpenStreetMap |