Overview
Mgr Brindavan
Overview
Mgr Brindavan
Overview
Mgr Brindavan
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (Hoskote Planning Authority) | Sanctioned 13 Oct 2025 · No. CC/311/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 85 m² 66.7%2BHK
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | AU SMALL FINANCE BANK · ₹10.00 Cr disbursed | |
|---|---|---|
| Records searched to | 27 Apr 2026 | |
| Building plan | Sanctioned 13 Oct 2025 | |
| Escrow bank | AU Small Finance Bank · RAJAPALYA HOODI |
Data room
106 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mgr Brindavan in the interactive atlas
Approval or registration
Khata issued
E Khatha · Gramapanchayat Mandur · Survey 100/1
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Bengaluru · Survey 100/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan CC/311/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/130526/008649
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 27 Apr 2026 |
|---|
| Developer's project loan | AU SMALL FINANCE BANK · ₹10.00 Cr disbursed |
|---|
Page 1
Page 1 of 5 of the encumbrance certificate. Filed with K-RERA: EC from 2011 till date, 5 pages.
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: ADLR Sketch MGR, 2 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 3,322 sq m | |
| The whole survey number on the KGIS map | 14,747 sq m | |
| Extent the filed land schedule names for these survey numbers | 2,125 sq m | |
| Plot area against the filed extent | 1.56 times | |
| Land area filed with K-RERA | 1,735 sq m | |
| Village, hobli and taluk on the KGIS map | Manduru, Bidarahalli-2 hobli, Bangalore-East taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 100/1 | |
|---|---|---|
| Land extent, Sy 100/1 | 0 acre 21 guntas | |
| Whole survey numbers on the KGIS map | 14,747 sq m (the project holds a share) | |
| Land area of this registration | 1,735 sq m | |
| Khata | E Khatha · Gramapanchayat Mandur · 23 Oct 2024 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 100/1 | 2 | 35 guntas | 21 guntas | 33 guntas | Differs: 14 guntas apart | 0 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 5 Dec 2024 · Deputy Commissioner Bengaluru | |
|---|---|---|
| Survey numbers | 100/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 12 | 8,762 |
| 3BHK | 24 | 21,980 |
| Sold, Q2 2026-27 | 7 / 36 | |
|---|---|---|
| Unsold, Q2 2026-27 | 29 | |
| Months to sell, derived from filed bookings | 12 months |
| Definer Upper Deck | about 0.5 km | Locked | |
|---|---|---|---|
| Neighbourhood Tree Park | about 0.5 km | Locked | |
| Chaithanya Sankhya | about 1.5 km | Locked | |
| Sattva Songbird | about 3.5 km | Locked | |
| Godrej Woodscapes | about 3.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 4.5 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 4.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 4.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 6 km | Locked | |
| Godrej Parkshire (Hoskote) | about 6 km | Locked | |
| Riqueza Siri | about 6.5 km | Locked | |
| Triaxis Splendour + | about 7 km | Locked |
| Mgr Brindavan This project | This project is the point the others are measured from | 31 Dec 2028 | 19% (7 of 36) | Not verified yet |
|---|---|---|---|---|
| Definer Upper Deck | about 0.5 km | 31 Dec 2025 | 71% (78 of 110) | Locked |
| Neighbourhood Tree Park | about 0.5 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
| Chaithanya Sankhya |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 80% Residential (main), 20% Parks & open space, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 7 km, TRIVENI NAGAR NEAR KR PURAM | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 2 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 10% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.00 (36 covered spaces for 36 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 60% · planned by 31 Mar 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Oct 2028 | |
| Completion | 65% |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 16 Mar 2026 |
| Building heights, fire NOC | 14.9 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 31 Mar 2026 · site inspected 28 Mar 2026 | |
| Engineer's certificate, registration | Dated 26 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 22 Apr 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹39.9 L 2.1%Development · ₹18.35 Cr 97.9%
| Estimated cost, at registration | ₹18.75 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹13.00 Cr | |
| Cost left | ₹6.17 Cr |
Sold (7) 19.4%Unsold (29) 80.6%
| Sold, Q1 2026-27 | 0 / 36 · 36 available | |
|---|---|---|
| Sold, Q2 2026-27 | 7 / 36 · 29 available | |
| Unsold, Q2 2026-27 | 29 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | AU Small Finance Bank · RAJAPALYA HOODI | |
|---|---|---|
| Designated account, collected | ₹3.62 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.58 Cr in Q2 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1.5 km |
| 30 Nov 2028 |
| 66% (29 of 44) |
| Locked |
| Sattva Songbird | about 3.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
|---|
| Godrej Woodscapes | about 3.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 4.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| Projects within 4 km, counted | 26 (26 with an approximate location) | |
|---|---|---|
| Flats in them | 9,546 | |
| Booked | 6,253 of 9,546 (66%) | |
| Unsold | 3,293 | |
| Booked a month, pooled | 104 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Gramapanchayat Manduru), Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km to the west, tertiary drain | |
|---|---|---|
| Metro, operational | about 9.5 km, Whitefield | |
| Metro, under construction | about 11.5 km, KR Puram |
| Kempegowda Airport | 22.5 | 13.5 |
| MG Road (CBD) | 24.5 | 19 |
| Manyata Tech Park | 19 | 14 |
| ITPL, Whitefield | 15.5 | 10.5 |
| Ecospace, Bellandur ORR | 24.5 | 18.5 |
| Electronic City Ph 1 | 39.5 | 27.5 |
| Landfill or waste transfer station | about 1 km, named Mandur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Manduru on OpenStreetMap |