Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 26 Aug 2024 | |
| Escrow bank | KOTAK MAHINDRA BANK · Electronic city |
Data room
124 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mythri Serene in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 26 Aug 2024 · No. 427 2023 24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-126777 · issued 15 Mar 2024 · valid until 11 Mar 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 20 May 2022 · Special Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | 447 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2bhk | 8 | 3,068 |
| 3BHK | 24 | 23,401 |
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Suyug's Saffron, price locked; Engrace 4, price locked; Engrace 3, price locked.
| Suyug's Saffron | 1.5 km | Locked | |
|---|---|---|---|
| Sowparnika Olivia Nest | about 1.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 2.5 km | Locked | |
| Engrace Vista | about 3 km | Locked |
| Mythri Serene This project | This project is the point the others are measured from | 31 Dec 2028 | – | Not verified yet |
|---|---|---|---|---|
| Suyug's Saffron | 1.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
| Sowparnika Olivia Nest | about 1.5 km | 30 Sep 2027 | 100% (211 of 211) | Locked |
| Bilva Phase-II By Bhavisha Homes |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 260 m from the site | Clear |
| Nearest government-flagged flood location | 9.2 km, Gunjur | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 220 m to the east, Sarjapura Chikka Kere |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.09 (35 covered spaces for 32 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 16 Jan 2027 | |
|---|---|---|
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 26 Aug 2024 |
| Building heights, fire NOC | 11.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Architect's certificate, registration | Dated 23 Mar 2026 · site inspected 20 Mar 2026 | |
|---|---|---|
| Engineer's certificate, registration | Dated 23 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 30 Oct 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹23.74 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹14.93 Cr | |
| Estimated cost, chartered accountant's certificate | ₹23.74 Cr, same as the filing |
| Escrow bank | KOTAK MAHINDRA BANK · Electronic city |
|---|
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 0 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Engrace 4 | 3.1 km | Locked |
|---|
| Engrace 3 | 3.3 km | Locked |
|---|
| Royal Nest | about 3.5 km | Locked |
|---|
| Nambiar District 25 Phase 2 | about 4 km | Locked |
|---|
| Vasudharini Nest | about 4.5 km | Locked |
|---|
| Leafy Avenue | 4.5 km | Locked |
|---|
| Coevolve Florenza | 4.7 km | Locked |
|---|
| Acorn Hive | 5.7 km | Locked |
|---|
| about 2.5 km |
| 30 Apr 2027 |
| 39% (89 of 226) |
| Locked |
| Engrace Vista | about 3 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Engrace 4 | 3.1 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Engrace 3 | 3.3 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹35,000 /mo · 11 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹27,750 /mo · 20 listings | |
| Rent per sq ft, 3 km | ₹31.3 /mo, as listed · 24 listings with a size |
| Projects within 4 km, counted | 61 (40 with an approximate location) | |
|---|---|---|
| Flats in them | 14,321 | |
| Booked | 8,244 of 14,321 (58%) | |
| Unsold | 6,077 | |
| Booked a month, pooled | 182 flats | |
| Months to sell, pooled | 30 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 9.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 879 m above sea level, plus or minus 4 m | |
| Metro, operational | 11.3 km, Bommasandra | |
| Metro, under construction | 13.6 km, Kadubeesanahalli |
| Kempegowda Airport | 53.2 | 55 | 39.0 |
| MG Road (CBD) | 30.2 | 37 | 24.0 |
| Manyata Tech Park | 34.4 | 42 | 27.6 |
| ITPL, Whitefield | 20.0 | 24 | 15.3 |
| Ecospace, Bellandur ORR | 19.0 | 27 | 13.8 |
| Electronic City Ph 1 | 22.3 | 24 | 12.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 890 m to the east, named Sarjapur Substation on OpenStreetMap |