| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹7.25 Cr 32.6%Development · ₹15.00 Cr 67.4%
Loan & collateral
| Escrow bank | Axis Bank · Kasthuri Nagar |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 2 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nava Vedantha in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 2,479 sq m |
|---|
| Legacy Saviero | about 2 km | Locked |
|---|
| Vkk Grand | about 4.5 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | Locked |
|---|
| Ranka Iris | about 5.5 km | Locked |
|---|
| Century Regalia (Project 2) | about 5.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 5.5 km | Locked |
|---|
| 2g Tula | about 5.5 km | Locked |
|---|
| Garuda Grand | about 6.5 km | Locked |
|---|
| Lodha Mirabelle | about 6.5 km | Locked |
|---|
| Nava Skanda Bellavita | about 6.5 km | Locked |
|---|
| Mirabelle Phase 2 | about 6.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 6.5 km | Locked |
|---|
| Nava Vedantha This project | This project is the point the others are measured from | 31 Dec 2019 | – | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 2 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | about 4.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Ranka Iris | about 5.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Century Regalia (Project 2) | about 5.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| SOBHA Victoria Park Phase 1 | about 5.5 km | 31 Dec 2027 | 93% (280 of 300) | Locked |
| Projects within 4 km, counted | 12 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 1,010 | |
| Booked | 500 of 1,010 (50%) | |
| Unsold | 510 | |
| Booked a month, pooled | 6 flats | |
| Months to sell, pooled | 86 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, RR layout & Ambedkar Nagar |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, B Channasandra Lake |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| Schedule end | 20 Feb 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 | |
| Work began, as filed | 1 Feb 2018 |
| Estimated cost, at registration | ₹22.25 Cr |
|---|
| Escrow bank | Axis Bank · Kasthuri Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 1 km, Benniganahalli | |
| Metro, under construction | about 1 km, Horamavu |
| Kempegowda Airport | 22 |
| MG Road (CBD) | 7.5 |
| Manyata Tech Park | 6.5 |
| ITPL, Whitefield | 8 |
| Ecospace, Bellandur ORR | 9 |
| Electronic City Ph 1 | 18.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | about 3 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named MUSS NGEF on OpenStreetMap |