Page 1
Page 1 of 14 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 14 pages.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹4.41 Cr 6.5%Development · ₹63.51 Cr
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · Backbay Reclamation Branch |
|---|
Data room
50 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) | Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
All 80 projects in Tumkur Road → · Smart Value Homes (Peenya Project) Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open New Haven Bengaluru Phase III in the interactive atlas
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Matched part of the survey number | 1,13,552 sq m | |
| The whole survey number on the KGIS map | 2,10,596 sq m | |
| Land area filed with K-RERA | 8,047 sq m | |
| Village, hobli and taluk on the KGIS map | J.I.Sheshagiriraopalya, Dasanapura-1 hobli, Bangalore-North taluk |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Whole survey numbers on the KGIS map | 2,10,596 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 8,047 sq m |
| Sy. No. 3/2 | 1 | 5 acres 5 guntas | Not read yet | ||||
| Sy. No. 3/3 | 1 | 6 acres 36 guntas | Not read yet | ||||
| Sy. No. 4/2 | 1 | 5 acres 15 guntas |
| Joint development agreement registered | 4 Jun 2013 |
|---|
Valid as of this reportValidity ended
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC (1 of 2) | GBC(1)280/2011 | Clear |
| Fire NOC (2 of 2) | GBC(1)280/2011 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | issued 7 Nov 2016 · permissible top elevation 961.8 m above mean sea level · validity ended 6 Nov 2021 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2019 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Vruksha Greens | about 8.5 km | Locked |
|---|
| Rubby Castle 1 | about 11.5 km | Locked |
|---|
| New Haven Bengaluru Phase III This project | This project is the point the others are measured from | 30 Sep 2019 | – | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | about 8.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Rubby Castle 1 | about 11.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 217 | |
| Booked | 115 of 217 (53%) | |
| Unsold | 102 | |
| Booked a month, pooled | 0 flats | |
| Months to sell, pooled | 230 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 7.5 km, Siddeswara Layout |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Landfill or waste transfer station | None within 3 km |
|---|
| Completion |
|---|
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 30 Sep 2019 | |
|---|---|---|
| RERA completion date | 30 Sep 2019 | |
| Work began, as filed | 15 Nov 2012 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety (1 of 2) | GBC(1)280/2011 | |
|---|---|---|
| Fire safety (2 of 2) | GBC(1)280/2011 | |
| Environmental clearance | Filed with the registration |
| Estimated cost, at registration | ₹67.92 Cr |
|---|
| Escrow bank | STATE BANK OF INDIA · Backbay Reclamation Branch |
|---|
| Other phases under this promoter name | 3 | |
|---|---|---|
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 4 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Not read yet |
| Sy. No. 2/3 | 1 | 7 acres 28 guntas | Not read yet |
| Sy. No. 2/4 | 1 | 17 guntas | Not read yet |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 6 km, Madavara | |
| Metro, under construction | about 16.5 km, Jakkur Cross |
| Kempegowda Airport | 43.5 | 30.5 |
| MG Road (CBD) | 27 | 22.5 |
| Manyata Tech Park | 25.5 | 20.5 |
| ITPL, Whitefield | 41.5 | 34.5 |
| Ecospace, Bellandur ORR | 40.5 | 32.5 |
| Electronic City Ph 1 | 52.5 | 39 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km |
|---|