Overview
New Haven Bengaluru Phase V
Part ofNew Haven Bengaluru4 phases
Overview
New Haven Bengaluru Phase V
Part ofNew Haven Bengaluru4 phases
Overview
New Haven Bengaluru Phase V
Part ofNew Haven Bengaluru4 phases
Overview
Part ofNew Haven Bengaluru4 phases
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 59 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹4.57 Cr 5.8%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 20 Oct 2012 | |
| Escrow bank | Standard Chartered Bank · Koramangala Bengaluru |
Data room
154 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) | Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
All 80 projects in Tumkur Road → · Smart Value Homes (Peenya Project) Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open New Haven Bengaluru Phase V in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 20 Oct 2012 · No. NPA/CC/1521 2012-13 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | GBC(1)280/2011 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | valid until 3 Jan 2030 | Clear |
| Pollution board (CFE) | consent order W-334862 · issued 12 Dec 2022 | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2023 |
| Land conversion | Converted 22 Jun 2012 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 2/3 · 2/4 · 3/2 · 3/3 · 4/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 188 | 636 |
| Vruksha Greens | about 8.5 km | Locked | |
|---|---|---|---|
| Rubby Castle 1 | about 11.5 km | Locked | |
| Royal Enclave | about 12 km | Locked |
| New Haven Bengaluru Phase V This project | This project is the point the others are measured from | 30 Sep 2023 | – | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | about 8.5 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Rubby Castle 1 | about 11.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Royal Enclave | about 12 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Projects within 4 km, counted | 1 (1 with an approximate location) |
|---|
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 49% Commercial (business), 22% Transport & communication, 19% Residential (main), 11% Parks & open space, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 7.5 km, Siddeswara Layout | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (188 covered spaces for 188 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 24 Feb 2023 |
|---|
| Possession, agreement | 30 Sep 2023 | |
|---|---|---|
| Schedule end | 20 Mar 2023 | |
| RERA completion date | 30 Sep 2023 | |
| Work began, as filed | 15 Nov 2012 |
| Building heights, fire NOC | 149 m filed, 4 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Fire safety | GBC(1)280/2011 | |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Architect's certificate, registration | Dated 30 Jul 2022 · site inspected 28 Jun 2022 | |
| Engineer's certificate, registration | Dated 30 Jul 2022 | |
| Chartered accountant's certificate, registration | Dated 1 Aug 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹78.77 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹59.71 Cr |
Sold (125) 66.5%Unsold (63) 33.5%
| Flats sold, at completion | 125 | |
|---|---|---|
| Flats unsold, at completion | 63 | |
| Flats in the phase | 188 |
| Escrow bank | Standard Chartered Bank · Koramangala Bengaluru |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Flats in them | 217 |
|---|
| Booked | 115 of 217 (53%) |
|---|
| Unsold | 102 |
|---|
| Booked a month, pooled | 0 flats |
|---|
| Months to sell, pooled | 230 months |
|---|
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Huskuru Grama Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 6 km, Madavara | |
| Metro, under construction | about 16.5 km, Jakkur Cross |
| Kempegowda Airport | 43.5 | 30.5 |
| MG Road (CBD) | 26.5 | 22 |
| Manyata Tech Park | 25.5 | 20 |
| ITPL, Whitefield | 41.5 | 34.5 |
| Ecospace, Bellandur ORR | 40.5 | 32.5 |
| Electronic City Ph 1 | 52 | 38.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |