Located at best location, North East corridor of banglore. Fast developing location. Best location and top brand to invest.
Overview
One Residences At Sobha One World Ph2 W3 And 4
Overview
One Residences At Sobha One World Ph2 W3 And 4
Overview
One Residences At Sobha One World Ph2 W3 And 4
Overview
Photo: One Residences at Sobha One WorldTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 27 | 12 Dec 2007DC, Bengaluru Rural District | 24 Jan 2008 |
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 7 May 2026 · No. STRRPA/TP/CC/652/2025-26/318 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Mar 2026 | |
| Building plan | Sanctioned 7 May 2026 | |
| Escrow bank | Axis Bank · MG Road |
Data room
338 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Located at best location, North East corridor of banglore. Fast developing location. Best location and top brand to invest.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
All 345 projects in Old Madras Road → · Sobha's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open One Residences At Sobha One World Ph2 W3 And 4 in the interactive atlas
| 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep |
| 12 Gunta |
| Survey 31 | ||||
|---|---|---|---|---|
| 31/1, 31/2, 31/3 | 24 Jan 2008Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 22 Gunta + 2 Gunta + 6 Gunta |
| 31/4 | 23 May 2017Deputy Commissioner, Bengaluru Rural District | 30 Aug 2017in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 4 Gunta |
| Survey 33 | ||||
|---|---|---|---|---|
| 33/1 | 24 May 2005Deputy Commissioner, Bengaluru Rural District | 18 Nov 2005in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 1 Acre |
| 33/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 10 Gunta |
| 33/2 | 27 Jan 2023Deputy Commissioner, Bengaluru Rural District | 28 Feb 2023in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 10 Gunta |
| Survey 36 | ||||
|---|---|---|---|---|
| 36/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 26 Gunta |
| 36/1 | 24 Jan 2008Deputy Commissioner, Bengaluru Rural District | 24 Jan 2024in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 13.25 Gunta |
| 36/1 | 18 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 13.25 Gunta |
| Survey 66 | ||||
|---|---|---|---|---|
| 66/1 | 28 Sep 2018Deputy Commissioner, Bengaluru Rural District | 24 Apr 2019in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 10 Gunta |
| 66/2 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 7 Apr 2026in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 31 Gunta |
| 66/4 | 28 Sep 2018Deputy Commissioner, Bengaluru Rural District | 30 Apr 2019in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 20 Gunta |
| Survey 67 | ||||
|---|---|---|---|---|
| 67 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 31 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 12 Gunta |
| 67 | 6 Aug 2008Deputy Commissioner, Bengaluru Rural District | 6 Aug 2013in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 11 Gunta |
| 67 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 25 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 12 Gunta |
| 68/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 25 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 31.25 Gunta |
|---|
| 69/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural Distric | 24 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 16 Gunta |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed registered
No. HSK-1-03373-2005-06 · Book 1 · executed 18 Nov 2005 · Sy 33, Kasaba hobli, Hoskote taluk · 1 Acre
Title deed filed with K-RERA, pp. 1, 6, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹3.68 Cr · Sy 31/1, Amani Doddakere village, Kasaba hobli, Hoskote taluk; Sy 31/3, Amani Doddakere village, Kasaba hobli, Hoskote taluk; and 8 more items
Title deed filed with K-RERA, pp. 1, 3, 7, 9, 11, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹3.68 Cr · Sy 31/1, Amani Doddakere village, Kasaba hobli, Hoskote taluk; Sy 31/3, Amani Doddakere village, Kasaba hobli, Hoskote taluk; and 8 more items
Title deed filed with K-RERA, pp. 1, 3, 7, 9, 11, 13 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-06073-2007-08 · Book 1 · Consideration ₹6.03 Cr · Sy 26; Sy 50; and 18 more items
Title deed filed with K-RERA, pp. 3, 4, 8, 9, 10, 11, 12 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-06098-2007-08 · Book 1 · Consideration ₹1.93 Cr · Sy 21/1B, Kasaba hobli, Hoskote taluk; Sy 62/1, Kasaba hobli, Hoskote taluk; and 6 more items
Title deed filed with K-RERA, pp. 3, 4, 8, 9 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-00708-2019-20 · Book 1 · executed 26 Apr 2019 · Consideration ₹24.1 L · Sy 66/1, Amanidoddakere village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 6, 7, 8 · See it in Documents
Transfer of the land
Title deed registered
executed 28 Feb 2023 · Consideration ₹2.85 Cr · Sy 33; 33/3, Amanidoddakere village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 6, 7, 9 · See it in Documents
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/CC/652/2025-26/318
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/080526/008637
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 6 Mar 2026 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: 3 ADLR Sketch, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 27, 31/1, 31/2, 31/3, 31/4, 33/1 and 8 more | |
|---|---|---|
| Land area of this registration | 23,704 sq m | |
| Khata | E Khatha · Rural Development and Panchayath Raj Dep · 17 Mar 2026 | |
| Sale deed | Dated 18 Nov 2005, 24 Jan 2008, 25 Jan 2008 and 8 more | |
| Sale deed in favour of | Sobha Limited, Sobha Limited (SDPL) | |
| Title deed | Sy 31/2, Amanidoddakere village, Kasaba hobli, Hoskote taluk | |
| Title deed | Consideration ₹69.2 L · Sy 51, Kasaba hobli, Hoskote taluk; Sy 59/3 · 24 guntas; and 1 more item | |
| Title deed | No. HSK-1-00853-2019-20 · Book 1 · Consideration ₹1.55 Cr · Sy 66/4; 66/1, Kasaba hobli, Hoskote taluk | |
| Title deed | Consideration ₹22.8 L · Sy 67, Amanidoddakere village, Kasaba hobli, Hoskote taluk · 11 Guntas |
| Sy. No. 27 | Not read yet | 0 | ||||
| Sy. No. 31/1 | Not read yet | 0 | ||||
| Sy. No. 31/2 | Not read yet | 0 | ||||
| Sy. No. 31/3 | Not read yet | 0 | ||||
| Sy. No. 31/4 | Not read yet | 0 | ||||
| Sy. No. 33/1 | Not read yet |
| Fire NOC | KSFES/NOC/167/2026 · issued 16 Apr 2026 | Clear |
|---|
| Environmental clearance | SEIAA 240 CON 2025 · EC identification no. EC25B3813KA5874774N · issued 30 Jan 2026 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Nov 2032 |
| Land conversion | 20 of 20 parcels converted | |
|---|---|---|
| Sy 27 | Converted 12 Dec 2007 · DC, Bengaluru Rural District | |
| Sy 31/1, 31/2, 31/3, 36/1 | Converted 24 Jan 2008 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 31/4 | Converted 23 May 2017 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 33/1 | Converted 24 May 2005 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 33/1, 36/1, 66/2, 67, 67, 67, 68/1 | Converted 12 Dec 2007 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 33/2 | Converted 27 Jan 2023 · Deputy Commissioner, Bengaluru Rural District | |
| Other parcels | 4 more groups on the filing | |
| Survey numbers | 27 · 31/1 · 31/2 · 31/3 · 31/4 · 33/1 · 33/1 · 33/2 · 36/1 · 36/1 · 36/1 · 66/1 · 66/2 · 66/4 · 67 · 67 · 67 · 67 · 68/1 · 69/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 89 m² 50.2%2BHK · avg 60 m² 32.8%1BHK · avg 40 m² 17%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 90 | 432 |
| 2BHK | 174 | 648 |
| 3BHK | 266 | 960 |
| Sold, Q2 2026-27 | 93 / 530 | |
|---|---|---|
| Unsold, Q2 2026-27 | 437 | |
| Months to sell, derived from filed bookings | 14 months |
| One Residences At Sobha One World Ph4 W7 And 8 | about 0.5 km | Locked | |
|---|---|---|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 0.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 0.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 2 km | Locked | |
| Godrej Woodscapes | about 3 km | Locked | |
| Riqueza Siri | about 3 km | Locked | |
| Sattva Songbird | about 3 km | Locked | |
| Neighbourhood Tree Park | about 3.5 km | Locked | |
| Triaxis Splendour + | about 4 km | Locked | |
| Sowparnika Euphoria in the East | about 4 km | Locked | |
| Definer Upper Deck | about 4.5 km | Locked | |
| Chaithanya Sankhya | about 4.5 km | Locked |
| One Residences At Sobha One World Ph2 W3 And 4 This project | This project is the point the others are measured from | 30 Nov 2032 | 18% (93 of 530) | Not verified yet |
|---|---|---|---|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 0.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 0.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 6.5 km, SAI BABA ASHRAM KADUGODI | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.00 (530 covered spaces for 530 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 30 Dec 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 21 Sep 2031 | |
| Club house | Not started | |
| Completion | 10% |
| Possession, agreement | 30 Nov 2032 | |
|---|---|---|
| Schedule end | 30 Nov 2032 | |
| RERA completion date | 30 Nov 2032 | |
| Work began, as filed | 18 Aug 2026 |
| Building heights, fire NOC | 146.5 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 900 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/167/2026 · issued 16 Apr 2026 | |
| Environmental clearance | SEIAA 240 CON 2025 · EC identification no. EC25B3813KA5874774N · issued 30 Jan 2026 | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 22 Apr 2026 · site inspected 22 Apr 2026 | |
| Engineer's certificate, registration | Dated 23 Apr 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹54.99 Cr 10.3%Development · ₹481.39 Cr 89.7%
| Estimated cost, at registration | ₹536.38 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹371.08 Cr | |
| Estimated cost, engineer's certificate | ₹371.08 Cr | |
| Cost left | ₹473.08 Cr |
Sold (93) 17.5%Unsold (437) 82.5%
| Sold, Q1 2026-27 | 0 / 530 · 530 available | |
|---|---|---|
| Sold, Q2 2026-27 | 93 / 530 · 437 available | |
| Unsold, Q2 2026-27 | 437 | |
| Sold in Q2 2026-27 | 93 |
| Escrow bank | Axis Bank · MG Road | |
|---|---|---|
| Designated account, collected | ₹5.33 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.13 Cr in Q2 2026-27 (96% of that quarter's deposits) | |
| Escrow account, Q2 2026-27 | ₹5.33 Cr deposited from sales, ₹5.13 Cr withdrawn |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 33/2 | Not read yet | 0 |
| Sy. No. 36/1 | Not read yet | 0 |
| Sy. No. 66/1 | Not read yet | 0 |
| Sy. No. 66/2 | Not read yet | 0 |
| Sy. No. 66/4 | Not read yet | 0 |
| Sy. No. 67 | Not read yet | 0 |
| Sy. No. 68/1 | Not read yet | 0 |
| Sy. No. 69/1 | Not read yet | 0 |
| One Residences At Sobha One World Ph6 W12,13,14 | about 0.5 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 2 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
|---|
| Godrej Woodscapes | about 3 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
|---|
| Riqueza Siri | about 3 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| Projects within 4 km, counted | 45 (45 with an approximate location) | |
|---|---|---|
| Flats in them | 15,762 | |
| Booked | 9,604 of 15,762 (61%) | |
| Unsold | 6,158 | |
| Booked a month, pooled | 255 flats | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Gramapanchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | about 12 km, Saraswathi Nagar |
| Kempegowda Airport | 30.5 | 17.5 |
| MG Road (CBD) | 24 | 21 |
| Manyata Tech Park | 23.5 | 17 |
| ITPL, Whitefield | 13 | 9 |
| Ecospace, Bellandur ORR | 23.5 | 18 |
| Electronic City Ph 1 | 39 | 26.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km, named Hoskote on OpenStreetMap |