Google reviews S Saloni Shivhare 15 Jul 2026 ★ ★ ★ ★ ★ The project is very well planned. It offers modern amenities, a good location, quality construction, and excellent connectivity. Overall, it is a great choice for homebuyers as well as investors.
S sonica sonica 8 Jul 2026 ★ ★ ★ ★ ★ Visited their model apartment and was really impressed with the thoughtful design. The spacious balconies and well-planned floor layouts make the homes feel bright, airy, and comfortable. Since the project is ready to move in, it's…
J Jaya lakshmi narayana chari 8 Jul 2026 ★ ★ ★ ★ ★ Platinum East Woods offers a great mix of quality, location, and thoughtful planning. With clear titles, good connectivity, and a transparent, professional management team, the project provides a smooth and reliable homebuying experience.
Not verified yet: Recent price, super built-up; Gross yield; East Bengaluru, past year; Price paid per sq ft, super built-up.
•• ••• ••••
Title Title report •• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries Schedule in the EC vs KGIS neighbours
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Encumbrance certificate, Form 15 Survey sketch Sketch, sanction and mutation vs KGIS map ₹ ••,•••
•• %
•• ••• ••••
•••••
Land record Filing vs KGIS map •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey •••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership Joint development agreement Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Platinum East Woods's developer filed before you say yes.
× Platinum East Woods
PLATINUM - NARYA INFRA · Whitefield
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
KSFES/NOC/064/2022 · building height 29.95 m ✓ Clear
Environmental clearance SEIAA 23 CON 2021 · issued 2 Aug 2021 ✓ Clear
Airport height NOC Filed with the registration
Pollution board (CFE) Filed with the registration
Water supply NOC Filed with the registration
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/100423/005855 Not verified yet: Validity.
•••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Platinum East Woods's developer filed before you say yes.
× Platinum East Woods
PLATINUM - NARYA INFRA · Whitefield
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
•• %
Payments Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Platinum East Woods's developer filed before you say yes.
× Platinum East Woods
PLATINUM - NARYA INFRA · Whitefield
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
4BHK · avg 125 m²: 5.3% 188 flats filed 2BHK · avg 72 m² 47.3% 3BHK · avg 95 m² 47.3% 4BHK · avg 125 m² 5.3%
The area Comparable projects Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 7 listings 1BHK: median ₹12,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,000 /mo 2BHK · 34 listings 2BHK: median ₹33,500 /mo over 34 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹33,500 /mo 3BHK · 16 listings 3BHK: median ₹49,500 /mo over 16 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹49,500 /mo
1BHK · 7 listings 1BHK: median ₹12,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,000 /mo 2BHK · 34 listings 2BHK: median ₹33,500 /mo over 34 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹33,500 /mo 3BHK · 16 listings
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 10,487 unsold flats ÷ 307 booked a month across 57 projects 34 months Ruchira Park East Ruchira Park East, 80 m: 64 unsold ÷ 9 booked in 9 months 64 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.1 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.3 km: 474 unsold ÷ 49 booked in 9 months 87 months Elv High Garden Elv High Garden, about 2 km: 143 unsold ÷ 6 booked in 9 months 215 months Mista Sri City-
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
4.2 km Whitefield
Around it Water Groundwater, Bengaluru East taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
Not verified yet: Kitchen handover, Sewage plant.
Work left By component, Q3 2025-26 Tower A Tower A: 62% 62% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 60% 60% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 60% 60% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 60% 60% Electricity Electricity: 50% 50% Community Hall Community Hall: 50% 50% Swimming Pool Swimming Pool: 50% 50% Power Backup Power Backup: 50% 50% Water Supply, external Water Supply, external: 50% 50% Sewage and Drainage System Sewage and Drainage System: 50% 50% Solid waste management and disposal Solid waste management and disposal: 50% 50% Storm water drains Storm water drains: 50% 50% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water Supply, internal Water Supply, internal: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Staircases Staircases: 50% 50% Corridor/Lobbies Corridor/Lobbies: 50% 50% Common entrance and exit for the building/common portico/foyer/vera ndah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 50% 50% Open parking areas Open parking areas: 50% 50% Parks & Tree planting Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Railing and Grill fixing Not started
Tower A Tower A: 62% 62% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 60% 60% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 60% 60% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 60% 60%
Tower A Tower A: 62% 62% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 60% 60% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 60% 60% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 60% 60%
Tower A Tower A: 62% 62% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 60% 60% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 60% 60% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 60% 60%
Quarterly return, Q3 2025-26 Dates Dates 2023 2025 2027 Work began 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends 15 Mar 2027 RERA deadline 30 Mar 2027 Work began: 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends: 15 Mar 2027 RERA deadline: 30 Mar 2027
2023 2024 2025 2026 2027 Work began 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends 15 Mar 2027 RERA deadline 30 Mar 2027 Work began: 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends: 15 Mar 2027 RERA deadline: 30 Mar 2027
2023 2024 2025 2026 2027 Work began 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends 15 Mar 2027 RERA deadline 30 Mar 2027 Work began: 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends: 15 Mar 2027 RERA deadline: 30 Mar 2027
2023 2024 2025 2026 2027 Work began 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends 15 Mar 2027 RERA deadline 30 Mar 2027 Work began: 8 Mar 2023 As of 18 Nov 2026 Builder's schedule ends: 15 Mar 2027 RERA deadline: 30 Mar 2027
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Not verified yet: Possession, agreement; Structure; Structural safety certificate; Completion, architect; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Form 4 Sales Sold vs unsold, Q3 2025-26 Sold (88): 46.8% Unsold (100): 53.2% 47% 188 flats Sold (88) 46.8% Unsold (100) 53.2%
Compliance Escrow, Q3 2025-26 Paid in Paid into the designated account in Q3 2025-26 ₹9.06 Cr Withdrawn Withdrawn by the promoter in Q3 2025-26 ₹9.06 Cr
Paid in Paid into the designated account in Q3 2025-26 ₹9.06 Cr Withdrawn Withdrawn by the promoter in Q3 2025-26 ₹9.06 Cr
Paid in Paid into the designated account in Q3 2025-26 ₹9.06 Cr Withdrawn Withdrawn by the promoter in Q3 2025-26 ₹9.06 Cr
Paid in Paid into the designated account in Q3 2025-26 ₹9.06 Cr Withdrawn Withdrawn by the promoter in Q3 2025-26 ₹9.06 Cr
Not verified yet: Receivable, sold flats; Cost left; Sold in the latest quarter; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Sold per quarter; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Q3 2025-26 Q3 2025-26: 62% built, as the promoter reported it 62%
Q3 2025-26 Q3 2025-26: 62% built, as the promoter reported it 62%
Q3 2025-26 Q3 2025-26: 62% built, as the promoter reported it 62%
Q3 2025-26 Q3 2025-26: 62% built, as the promoter reported it 62%
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
TRIVENI NAGAR NEAR KR PURAM KRISHNANAGARA , NEAR CHIKKADEVSANDRA VINAYAKA LAYOUT NEAR BASAVANAPURA MAIN ROAD 1 km 3 km 2 km Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Storm drain, smaller Lake or tank Metro lines (dashed: planned) High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The site3BHK: median ₹49,500 /mo over 16 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹49,500 /mo 1BHK · 7 listings 1BHK: median ₹12,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,000 /mo 2BHK · 34 listings 2BHK: median ₹33,500 /mo over 34 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹33,500 /mo 3BHK · 16 listings 3BHK: median ₹49,500 /mo over 16 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹49,500 /mo
1BHK · 7 listings 1BHK: median ₹12,000 /mo over 7 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹12,000 /mo 2BHK · 34 listings 2BHK: median ₹33,500 /mo over 34 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹33,500 /mo 3BHK · 16 listings 3BHK: median ₹49,500 /mo over 16 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹49,500 /mo
Budigere Cross Mista Sri City- Budigere Cross, 1.8 km: 168 unsold ÷ 25 booked in 9 months 61 months Within 4 km, pooled 10,487 unsold flats ÷ 307 booked a month across 57 projects 34 months Ruchira Park East Ruchira Park East, 80 m: 64 unsold ÷ 9 booked in 9 months 64 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.1 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.3 km: 474 unsold ÷ 49 booked in 9 months 87 months Elv High Garden Elv High Garden, about 2 km: 143 unsold ÷ 6 booked in 9 months 215 months Mista Sri City- Budigere Cross Mista Sri City- Budigere Cross, 1.8 km: 168 unsold ÷ 25 booked in 9 months 61 months
Within 4 km, pooled 10,487 unsold flats ÷ 307 booked a month across 57 projects 34 months Ruchira Park East Ruchira Park East, 80 m: 64 unsold ÷ 9 booked in 9 months 64 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.1 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.3 km: 474 unsold ÷ 49 booked in 9 months 87 months Elv High Garden Elv High Garden, about 2 km: 143 unsold ÷ 6 booked in 9 months 215 months Mista Sri City- Budigere Cross Mista Sri City- Budigere Cross, 1.8 km: 168 unsold ÷ 25 booked in 9 months 61 months
Within 4 km, pooled 10,487 unsold flats ÷ 307 booked a month across 57 projects 34 months Ruchira Park East Ruchira Park East, 80 m: 64 unsold ÷ 9 booked in 9 months 64 months Sarang by Sumadhura Phase-I Sarang by Sumadhura Phase-I, about 1 km: 88 unsold ÷ 11 booked in 9 months 72 months Sarang by Sumadhura Phase-II Sarang by Sumadhura Phase-II, 1.1 km: 50 unsold ÷ 12 booked in 9 months 38 months Amrutha Lake Vista Amrutha Lake Vista, 1.3 km: 474 unsold ÷ 49 booked in 9 months 87 months Elv High Garden Elv High Garden, about 2 km: 143 unsold ÷ 6 booked in 9 months 215 months Mista Sri City- Budigere Cross Mista Sri City- Budigere Cross, 1.8 km: 168 unsold ÷ 25 booked in 9 months 61 months
250 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 29.8 km by road 29.8 km MG Road (CBD) MG Road (CBD): 22.0 km by road 22.0 km Manyata Tech Park Manyata Tech Park: 21.5 km by road 21.5 km ITPL, Whitefield ITPL, Whitefield: 8.1 km by road 8.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.7 km by road 18.7 km Electronic City Ph 1 Electronic City Ph 1: 32.4 km by road 32.4 km
Kempegowda Airport Kempegowda Airport: 29.8 km by road 29.8 km MG Road (CBD) MG Road (CBD): 22.0 km by road 22.0 km Manyata Tech Park Manyata Tech Park: 21.5 km by road 21.5 km ITPL, Whitefield ITPL, Whitefield: 8.1 km by road 8.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.7 km by road 18.7 km Electronic City Ph 1 Electronic City Ph 1: 32.4 km by road 32.4 km
Kempegowda Airport Kempegowda Airport: 29.8 km by road 29.8 km MG Road (CBD) MG Road (CBD): 22.0 km by road 22.0 km Manyata Tech Park Manyata Tech Park: 21.5 km by road 21.5 km ITPL, Whitefield ITPL, Whitefield: 8.1 km by road 8.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.7 km by road 18.7 km Electronic City Ph 1 Electronic City Ph 1: 32.4 km by road 32.4 km
Kempegowda Airport Kempegowda Airport: 29.8 km by road 29.8 km MG Road (CBD) MG Road (CBD): 22.0 km by road 22.0 km Manyata Tech Park Manyata Tech Park: 21.5 km by road 21.5 km ITPL, Whitefield ITPL, Whitefield: 8.1 km by road 8.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 18.7 km by road 18.7 km Electronic City Ph 1 Electronic City Ph 1: 32.4 km by road 32.4 km
Six city anchors · OSRM, no traffic Nuisances Distance from the site Sewage treatment plant Sewage treatment plant: 790 m 790 m Electrical substation Electrical substation: 800 m, Kondaspura 800 m
Sewage treatment plant Sewage treatment plant: 790 m 790 m Electrical substation Electrical substation: 800 m, Kondaspura 800 m
Sewage treatment plant Sewage treatment plant: 790 m 790 m Electrical substation Electrical substation: 800 m, Kondaspura 800 m
Sewage treatment plant Sewage treatment plant: 790 m 790 m Electrical substation Electrical substation: 800 m, Kondaspura 800 m
Electricity Electricity: 50% 50% Community Hall Community Hall: 50% 50% Swimming Pool Swimming Pool: 50% 50% Power Backup Power Backup: 50% 50% Water Supply, external Water Supply, external: 50% 50% Sewage and Drainage System Sewage and Drainage System: 50% 50% Solid waste management and disposal Solid waste management and disposal: 50% 50% Storm water drains Storm water drains: 50% 50% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water Supply, internal Water Supply, internal: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Staircases Staircases: 50% 50% Corridor/Lobbies Corridor/Lobbies: 50% 50% Common entrance and exit for the building/common portico/foyer/verandah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 50% 50% Open parking areas Open parking areas: 50% 50% Parks & Tree planting Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Railing and Grill fixing Not started Electricity Electricity: 50% 50% Community Hall Community Hall: 50% 50% Swimming Pool Swimming Pool: 50% 50% Power Backup Power Backup: 50% 50% Water Supply, external Water Supply, external: 50% 50% Sewage and Drainage System Sewage and Drainage System: 50% 50% Solid waste management and disposal Solid waste management and disposal: 50% 50% Storm water drains Storm water drains: 50% 50% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water Supply, internal Water Supply, internal: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Staircases Staircases: 50% 50% Corridor/Lobbies Corridor/Lobbies: 50% 50% Common entrance and exit for the building/common portico/foyer/verandah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 50% 50% Open parking areas Open parking areas: 50% 50% Parks & Tree planting Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Railing and Grill fixing Not started Electricity Electricity: 50% 50% Community Hall Community Hall: 50% 50% Swimming Pool Swimming Pool: 50% 50% Power Backup Power Backup: 50% 50% Water Supply, external Water Supply, external: 50% 50% Sewage and Drainage System Sewage and Drainage System: 50% 50% Solid waste management and disposal Solid waste management and disposal: 50% 50% Storm water drains Storm water drains: 50% 50% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Water Supply, internal Water Supply, internal: 50% 50% Fire protection and fire safety requirements, internal Fire protection and fire safety requirements, internal: 50% 50% Staircases Staircases: 50% 50% Corridor/Lobbies Corridor/Lobbies: 50% 50% Common entrance and exit for the building/common portico/foyer/verandah Common entrance and exit for the building/common portico/foyer/verandah: 50% 50% Terrace Terrace: 50% 50% Open parking areas Open parking areas: 50% 50% Parks & Tree planting Not started Electrification, Water supply and Sanitary Finishing Not started Fire prevention and fire fighting fitting and fixture with network Not started Internal and External work including landscapes as per sanctioned drawings Not started Wardrobe, Showcase, Kitchen cabinet, Puja work Not started Railing and Grill fixing Not started