Overview
Prestige Lakeside Habitat
Overview
Prestige Lakeside Habitat
Overview
Prestige Lakeside Habitat
Overview
Photo: Sumit PatelTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Fire NOC | GBC(1)388/2013 | Clear |
|---|---|---|
| Environmental clearance | SEIAA 96 CON 2014 · issued 14 Dec 2015 | Clear |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹1137.60 Cr 37.8%Development · ₹1872.77 Cr
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · Commercial Branch, Hudson Circle |
|---|
Data room
39 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aarna RajpathLapsed · completion date passed | AARNA PROJECTS | Mixed development | – | Apr 2025 |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Aikya OrchidCompleted · OC 06-05-2024 | AIKYA PROMOTERS AND CONSTRUCTIONS | Apartment | 840–1,049 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm Pristine |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Lakeside Habitat in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 4,01,318 sq m |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jan 2020 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Poetry Of Earth, price locked; SOBHA Ayana, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; SOBHA Neopolis, price locked; Adarsh Parkland, price locked.
| Poetry Of Earth | 520 m | Locked | |
|---|---|---|---|
| Adarsh Park Heights Phase-2 | about 0.5 km | Locked | |
| Inspira Infinity | about 1 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 1.5 km | Locked | |
| SOBHA Ayana | 1.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 1.6 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 1.5 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | 1.7 km | Locked | |
| Jeevan's Allure | about 2.5 km | Locked |
| Prestige Lakeside Habitat This project | This project is the point the others are measured from | 31 Jan 2020 | – | Not verified yet |
|---|---|---|---|---|
| Poetry Of Earth | 520 m | 31 Dec 2028 | 25% (77 of 312) | Locked |
| Adarsh Park Heights Phase-2 | about 0.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
| Inspira Infinity | about 1 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
| Rent, 3BHK, 3 km | ₹55,000 /mo · 42 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹42,000 /mo · 85 listings | |
| Rent, 1BHK, 3 km | ₹18,000 /mo · 45 listings | |
| Rent per sq ft, 3 km | ₹37.2 /mo, as listed · 101 listings with a size |
| Projects within 4 km, counted | 91 (39 with an approximate location) | |
|---|---|---|
| Flats in them | 34,185 | |
| Booked | 19,068 of 34,185 (56%) | |
| Unsold | 15,117 | |
| Booked a month, pooled | 559 flats | |
| Months to sell, pooled | 24 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 1.1 km, Varthur police station |
| Nearest storm drain | 70 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 480 m to the west, an unnamed water body |
| Completion |
|---|
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 29 Nov 2019 | |
|---|---|---|
| RERA completion date | 31 Jan 2020 | |
| Work began, as filed | 10 May 2015 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)388/2013 | |
|---|---|---|
| Environmental clearance | SEIAA 96 CON 2014 · issued 14 Dec 2015 |
| Estimated cost, at registration | ₹3010.37 Cr |
|---|
| Escrow bank | STATE BANK OF INDIA · Commercial Branch, Hudson Circle |
|---|
| K-RERA registrations under this promoter | 66 | |
|---|---|---|
| Marked completed | 37 | |
| Past promised date, not completed | 10 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| B M DEVELOPERS |
| Apartment |
| – |
| Jul 2016 |
| Camellia VitalActive · 28% built | Camellia Infrastructures | Apartment | 962 sqft carpet (as filed) | Mar 2028 |
8 of 51 other projects in Varthur, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 2.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 70 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 876 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.1 km, Nallur Halli | |
| Metro, under construction | 4.6 km, Kodibeesanahalli |
| Kempegowda Airport | 42.0 | 42 | 29.8 |
| MG Road (CBD) | 20.5 | 24 | 15.6 |
| Manyata Tech Park | 24.6 | 29 | 17.9 |
| ITPL, Whitefield | 8.7 | 10 | 5.9 |
| Ecospace, Bellandur ORR | 9.5 | 15 | 6.4 |
| Electronic City Ph 1 | 20.6 | 27 | 12.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.3 km to the west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 640 m to the west |