Overview
Purva Northern Lights
Overview
Purva Northern Lights
Overview
Purva Northern Lights
Overview
Photo: Purva KIADBTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Khata issued
E Khatha · Panchayati Raj · Survey 150200201200325130
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 5 Mar 2026 | |
| Building plan (KIADB) | Sanctioned 7 Mar 2026 | |
| Escrow bank | HDFC · Ulsoor Road Bangalore |
Data room
98 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Very Good & Excellent Place The Best Resnobel Price Also👌🤝🙂
Guys NEVER EVER fall for EOI business from ANY builder. It a mechanism to artificially pump up the price . If you want to buy ask the builder to sign and agreement upfront for a price. Else all the prospective buys will have to pay the…
**Purva Northern Lights – A Wonderful Residential Community in North Bengaluru** Purva Northern Lights is an impressive residential township that perfectly blends modern living, comfort, and convenience. Developed by Puravankara, one of…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 3 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Purva Northern Lights in the interactive atlas
Approval or registration
Building plan sanctioned
KIADB · plan DO3-KIADB-00190/25-26/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/120326/008523
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 5 Mar 2026 |
|---|
| Developer's project loan | None declared |
|---|
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 150200201200325130 | |
|---|---|---|
| Land extent, Sy 150200201200325130 | 99,516 sq m | |
| Owner kind, Sy 150200201200325130 | Company | |
| Share as printed, Sy 150200201200325130 | 100 | |
| Owner as printed, Sy 150200201200325130 | ||
| Land area of this registration | 38,545 sq m | |
| Khata | E Khatha · Panchayati Raj · 12 Dec 2024 |
Valid as of this reportValidity ended
| Building plan (KIADB) | Sanctioned 7 Mar 2026 · No. DO3-KIADB-00190/25-26/BP | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/407/2025 · issued 5 Dec 2025 | Clear |
| Environmental clearance | SEIAA 144 CON 2025 · EC identification no. EC25B3812KA5939088N · issued 19 Jan 2026 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-352269 · issued 9 Jan 2026 · valid until 8 Jan 2031 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2029 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 150200201200325130 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 66 m² 43.7%3BHK · avg 99 m² 30.4%1BHK · avg 38 m² 16.5%Ews · 745 m² 8.2%4BHK · avg 212 m² 1.3%
| 1BHK | 202 | 82,441 |
| 2BHK | 535 | 3,79,955 |
| 3BHK | 372 | 3,98,405 |
| 4BHK | 16 | 36,587 |
| Ews | 100 | 8,019 |
| Sold, Q2 2026-27 | 916 / 1,225 | |
|---|---|---|
| Unsold, Q2 2026-27 | 309 | |
| Months to sell, derived from filed bookings | 6 months |
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Sora & Saki Phase 2, price locked; Assetz Sora & Saki Phase 3, price locked.
| Assetz Sora & Saki Phase 2 | 180 m | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 3 | 240 m | Locked | |
| Kumar Plumeria | about 2 km | Locked | |
| Assetz Zen & Sato | about 5 km | Locked |
| Purva Northern Lights This project | This project is the point the others are measured from | 31 Dec 2029 | 75% (916 of 1,225) | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | 180 m | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | 240 m | 30 Apr 2029 | 30% (92 of 304) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 65% Agriculture, 32% Industrial (general) | Review |
|---|---|---|
| Nearest high-tension line | A 400 kV line's corridor covers about 13% of the site (about 13,370 m²), with 1 transmission tower standing inside the outline | Review |
| Nearest government-flagged flood location | 8.7 km, Shankrappa Layout, MAruthi nagar |
| Nearest storm drain | 750 m to the south-west, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 280 m to the south-east, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 0.69 (841 covered spaces for 1,225 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 30 Nov 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Dec 2029 | |
| Club house | Not started | |
| Completion | 1% | |
| Completion, accountant | 20.3% of the estimated cost spent |
| Schedule end | 31 Dec 2029 | |
|---|---|---|
| RERA completion date | 31 Dec 2029 | |
| Work began, as filed | 15 Apr 2026 |
| Building heights, fire NOC | filed: Wing 1 91.3 m, Wing 2 98.95 m, Wing 3 98.95 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Oct 2026, Oct 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/407/2025 · issued 5 Dec 2025 | |
| Environmental clearance | SEIAA 144 CON 2025 · EC identification no. EC25B3812KA5939088N · issued 19 Jan 2026 | |
| Architect, quarterly | Form 5 · Oct 2026, Oct 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 9 Mar 2026 | |
| Engineer's certificate, registration | Dated 9 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 3 Mar 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹98.37 Cr 11.4%Development · ₹760.80 Cr 88.6%
| Estimated cost, at registration | ₹859.17 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹670.19 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹859.33 Cr | |
| Cost incurred | ₹174.08 Cr (20.3% of the Form 4 Q2 2026-27 estimate) |
Sold (916) 74.8%Unsold (309) 25.2%
| Sold, Q4 2025-26 | 622 / 1,225 · 603 available | |
|---|---|---|
| Sold, Q1 2026-27 | 740 / 1,225 · 485 available | |
| Sold, Q2 2026-27 | 916 / 1,225 · 309 available | |
| Unsold, Q2 2026-27 | 309 | |
| Sold in Q1 2026-27 | 118 | |
| Sold in Q2 2026-27 | 176 |
| Escrow bank | HDFC · Ulsoor Road Bangalore | |
|---|---|---|
| Designated account, collected | ₹84.04 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹43.07 Cr in Q2 2026-27 (51% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹81,81,34,550 |
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 11 | |
| Past promised date, not completed | 11 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 73 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
| Birla Trimaya | about 5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | 5.4 km | Locked |
|---|
| Varnam Phase 1c | about 5.5 km | Locked |
|---|
| Sattva City | 5.8 km | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 6 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 6 km | Locked |
|---|
| Kumar Plumeria |
|---|
| about 2 km |
| 31 Dec 2028 |
| 5% (5 of 100) |
| Locked |
| Assetz Zen & Sato | about 5 km | 31 May 2030 | 44% (202 of 456) | Locked |
|---|
| Birla Trimaya | about 5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹34,000 /mo · 7 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,750 /mo · 6 listings | |
| Rent per sq ft, 3 km | ₹26.2 /mo, as listed · 14 listings with a size |
| Projects within 4 km, counted | 18 (13 with an approximate location) | |
|---|---|---|
| Flats in them | 15,140 | |
| Booked | 10,283 of 15,140 (68%) | |
| Unsold | 4,857 | |
| Booked a month, pooled | 170 flats | |
| Months to sell, pooled | 14 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Bagaluru Grama Panchayathi) | |
| Nearest city water main | 5.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 750 m to the south-west, Ponnaiyar, secondary drain | |
|---|---|---|
| Ground level | 898 m above sea level, plus or minus 4 m | |
| Metro, operational | 15.9 km, K.R. Puram | |
| Metro, under construction | 5.9 km, Bettahalasuru |
| Kempegowda Airport | 11.8 | 13 | 7.1 |
| MG Road (CBD) | 23.2 | 26 | 20.3 |
| Manyata Tech Park | 16.7 | 18 | 12.4 |
| ITPL, Whitefield | 27.9 | 31 | 18.8 |
| Ecospace, Bellandur ORR | 34.2 | 42 | 24.2 |
| Electronic City Ph 1 | 43.3 | 49 | 33.8 |
| Landfill or waste transfer station | 1.3 km to the north-west, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.2 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 50 m to the north, named Bagalur Substation on OpenStreetMap |