Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | |
| Beverly Hills Phase-IIILapsed · completion date passed | Pleasure Work Homes Private Limited | Plot | ~2,050–2,400 sqft (estimate: filed carpet plus 25%) | Jun 2025 |
| Godrej AquaCompleted · OC 03-01-2022 | Godrej Properties | Apartment | 1,100–1,701 sqft | Completed |
| Natures BoulevardActive · 43% built | M/s NATURES BOULEVARD | Plot | ~600–3,470 sqft (estimate: filed carpet plus 25%) | Dec 2030 |
| Purva ZeniumLapsed · completion date passed | Puravankara | Apartment | 1,044–2,123 sqft | Dec 2024 |
| Purva Zenium 2Active · 100% built | Puravankara limited | Apartment | 689–904 sqft carpet (as filed) | Jun 2027 |
All 5 other projects in IVC Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Sora & Saki Phase 3, price locked; Assetz Sora & Saki Phase 2, price locked.
| Assetz Zen & Sato | about 2.5 km | Locked | |
|---|---|---|---|
| Kumar Plumeria | about 2.5 km | Locked | |
| Tnm Lakeview | about 3 km | Locked | |
| Assetz Sora & Saki Phase 3 | 3.8 km | Locked | |
| Riviera Glade | about 4 km | Locked | |
| Assetz Sora & Saki Phase 2 | 4.0 km | Locked | |
| Sattva City | 4.4 km | Locked | |
| Godrej Aveline | 4.8 km | Locked | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 5 km | Locked | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 5 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 5 km | Locked | |
| Birla Trimaya Phase-2 | about 5.5 km | Locked |
| Purva Zenium 2 This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Assetz Zen & Sato | about 2.5 km | 31 May 2030 | 44% (202 of 456) | Locked |
| Kumar Plumeria | about 2.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
| Tnm Lakeview | about 3 km | 31 Oct 2026 | 100% (36 of 36) | Locked |
| Assetz Sora & Saki Phase 3 | 3.8 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
| Riviera Glade | about 4 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
| Assetz Sora & Saki Phase 2 | 4.0 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Rent, 2BHK, 3 km | ₹26,750 /mo · 5 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹27.5 /mo, as listed · 7 listings with a size |
| Projects within 4 km, counted | 16 (10 with an approximate location) | |
|---|---|---|
| Flats in them | 6,120 | |
| Booked | 3,048 of 6,120 (50%) | |
| Unsold | 3,072 | |
| Booked a month, pooled | 269 flats | |
| Months to sell, pooled | 11 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 400 m from the filed location | Clear |
| Nearest government-flagged flood location | 5.8 km, Shankrappa Layout, MAruthi nagar |
| Nearest storm drain | 1.3 km to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 250 m to the south, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Nearest city water main | 1.7 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.3 km to the south-west, tertiary drain | |
|---|---|---|
| Ground level | 910 m above sea level, plus or minus 4 m | |
| Metro, operational | 16.6 km, Yeshwantpur | |
| Metro, under construction | 2.1 km, Bettahalasuru |
| Kempegowda Airport | 12.6 | 18 | 9.5 |
| MG Road (CBD) | 23.9 | 27 | 19.3 |
| Manyata Tech Park | 14.8 | 19 | 11.3 |
| ITPL, Whitefield | 30.8 | 37 | 20.7 |
| Ecospace, Bellandur ORR | 35.7 | 46 | 24.8 |
| Electronic City Ph 1 | 43.7 | 52 | 34.3 |
| Landfill or waste transfer station | 200 m to the west | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the north-west, named VIdyanagara Substation on OpenStreetMap |