Building plan (Local Planning Authority)Sanctioned 28 May 2024No. APA/CC/1400/2023-24
RERA extensionsNone on the filingFiling read 15 Nov 2026
Land conversionConverted 18 Jun 2022DC BENGULURU URBAN
Permits
Approval letters
Building plan (Local Planning Authority)
Sanctioned 28 May 2024 · No. APA/CC/1400/2023-24
Power NOC
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
3BHK 89.5%2BHK · avg 750 m² 10.5%
Location & risks
What is the location like?
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedBWSSBDeclared by the promoter
Metro, operationalabout 10 kmBommasandra
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion100%As of Q3 2025-26, promoter's return
Possession, agreement30 Jul 2025Agreement for sale, p. 11
Progress
Site photos filed with K-RERA, Q3 2025-26
Developer
Can the developer deliver?
Review1 to review
Sold55 / 76As of Q3 2025-26
Funding
Estimated cost
Land · ₹4.00 Cr 8.2%Development · ₹45.00 Cr
Loan & collateral
Can it be financed?
Review1 to review
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Records searched to
10 Mar 2024
!Review
Building plan
Sanctioned 28 May 2024
Escrow bank
ICICI Bank · SARJAPURA
Stage
Data room
Documents filed for this project
Locked
113 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Poor Quality Construction and Unresponsive Management – Beware I am a resident of Phase 3, and I feel it is important to warn potential buyers about the serious issues I have experienced with this project. Within just a couple of years, the…
NNeha Verma9 Jun 2025★★★★★
Visited Bhavisha Raaga recently and was impressed by the peaceful environment and thoughtful layout. The amenities like the swimming pool and gym are well-planned. Looking forward to seeing the completed project.
SSouvik Chatterjee16 Mar 2025★★★★★
Think before you buy and consider genuine reviews like these, from earlier customers (Gardeniaa) of Bhavisha builders, not the fake ones. Get ready for endless construction issues, fleecing in the name of BMRDA OC, stupidly designed…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Raaga By Bhavisha Homes in the interactive atlas
Local Planning Authority · plan APA/CC/1400/2023-24
K-RERA filing, approvals
Project
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/260924/007083
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
Title
Title report
Records searched to
10 Mar 2024
Charges
Developer's project loan
None declared
Boundaries
Schedule in the EC vs KGIS neighbours
The matched land is part of a survey number. KGIS holds only the whole number, so its neighbours are not this land's.
Survey sketch
Survey sketch filed with K-RERA
No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map
Filed survey numbers matched to the KGIS map
2 of 2
Whole survey numbers on the KGIS map
24,908 sq m
Land area filed with K-RERA
5,561 sq m
Village, hobli and taluk on the KGIS map
Somapura, SARJAPURA3 hobli, ANEKAL taluk
Mutation entry
None open on 2 of 2 filed surveys
Land record
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Share of sales revenue; Joint development agreement.
Fire department
Filed with the registration
SEIAA
Filed with the registration
AAI
Filed with the registration
KSPCB
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2025
Registration certificates
PRM/KA/RERA/1251/308/PR/260924/007083
Land use
Conversion order
Land conversion
Converted 18 Jun 2022 · DC BENGULURU URBAN
Survey numbers
39/2 · 39-4
Not verified yet: Validity.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Completion, architect; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6); Fire safety; Environmental clearance.
91.8%
Form 4
Estimated cost, at registration
₹49.00 Cr
Estimated cost, engineer's certificate
₹45.00 Cr
Sales
Sold vs unsold, Q3 2025-26
Sold (55) 72.4%Unsold (21) 27.6%
K-RERA inventory
Sold, Q3 2025-26
55 / 76 · 21 available
Unsold, Q3 2025-26
21
Compliance
Escrow, Q3 2025-26
Escrow and filings
Escrow bank
ICICI Bank · SARJAPURA
Designated account, collected
₹12.75 Cr in Q3 2025-26
Designated account, withdrawn
₹9.99 Cr in Q3 2025-26 (78% of that quarter's deposits)
Track record
DOSL builder track
K-RERA registrations under this promoter
14
Marked completed
4
Past promised date, not completed
9
!Review
Not verified yet: Receivable, sold flats; Cost left; Sold in the latest quarter; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Sold per quarter; Unregistered agreements, over 10% paid; Average schedule slip.
Progress as reported, by quarter
Site photos, Q3 2025-26
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220, 110 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
BWSSB
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220, 110 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot