Photo: Rohan IkshaTitle & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | NOC ID BANG/SOUTH/B/040615/107945 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹54.72 Cr 29.8%Development · ₹129.00 Cr
Loan & collateral
| Escrow bank | Axis Bank · M G Road Branch |
|---|
Data room
50 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Good environment..out if the city .....but every thing reachable .... Quit and calm .. ventilation.....
Great architecture. Away from all the city noise and pollution. Rooms are built with great ventilation. And awesome views from the top floors.
Nice place for stay, rent I feel is little on higher side. 2 major problems lot of bees hive which is why you have to keep windows closed most of the time, way from main road to society is not so great
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adithya Homes GrandCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditi TropicaLapsed · completion date passed | ADITI TROPICA | Apartment | – | Dec 2020 |
| Akshaya Temple TreeLapsed · completion date passed | Akshaya Builders Developers Promoters | Apartment | – | Jan 2023 |
| AlayaCompleted (regulator flag) | Essem18 Developers Private Limited | Apartment | 1,762 sqft carpet (as filed) | Completed |
| Alta MonteCompleted (regulator flag) | B S Nesara | Apartment | 1,133 sqft carpet (as filed) | Completed |
| Century MiraiActive · 11% built | Century Real Estate | Apartment | 742–4,111 sqft | Oct 2030 |
| Innovative PalaciaActive · 90% built | SHUBANKARA DEVELOPERS | Apartment | 789–959 sqft carpet (as filed) | Sep 2027 |
| Jeevan PristineCompleted (regulator flag) | M/s. Jeevan Developers | Apartment | – | Completed |
8 of 32 other projects in Marathahalli, A to Z. Status is taken from each project's own filing.
All 35 projects in Marathahalli → · Rohan Builders's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Rohan Iksha in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 May 2019 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 11 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Parkland, price locked; Adarsh Rosewood, price locked; SOBHA Neopolis, price locked; Satori Residence By Genurise, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; SOBHA Ayana, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked.
| Rohan Iksha This project | This project is the point the others are measured from | 31 May 2019 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | 1.1 km | – | – | Locked |
| Adarsh Rosewood | 1.4 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 1.5 km | 31 Dec 2030 | 98% (220 of 225) | Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 1.5 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 1.5 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 1.5 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
| Rent, 4BHK, 3 km | ₹89,000 /mo · 12 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹68,750 /mo · 186 listings | |
| Rent, 2BHK, 3 km | ₹42,000 /mo · 284 listings | |
| Rent, 1BHK, 3 km | ₹18,000 /mo · 149 listings | |
| Rent per sq ft, 3 km | ₹40.0 /mo, as listed · 272 listings with a size |
| Projects within 4 km, counted | 93 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 26,779 | |
| Booked | 14,940 of 26,779 (56%) | |
| Unsold | 11,839 | |
| Booked a month, pooled | 348 flats | |
| Months to sell, pooled | 31 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech) | |
|---|---|---|
| Nearest government-flagged flood location | 1.2 km, Panathur |
| Nearest storm drain | 280 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 330 m to the south, an unnamed tank |
| Completed, occupancy certificate filed with K-RERA |
| Schedule end | 15 Mar 2018 | |
|---|---|---|
| RERA completion date | 31 May 2019 | |
| Work began, as filed | 15 Jun 2015 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration |
| Estimated cost, at registration | ₹183.72 Cr |
|---|
| Escrow bank | Axis Bank · M G Road Branch |
|---|
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 10 | |
| Past promised date, not completed | 0 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 430 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 280 m to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 890 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.8 km, Kundalahalli | |
| Metro, under construction | 1.3 km, Kadubeesanahalli |
| Kempegowda Airport | 48.9 | 49 | 30.1 |
| MG Road (CBD) | 16.2 | 23 | 11.8 |
| Manyata Tech Park | 19.9 | 27 | 15.6 |
| ITPL, Whitefield | 14.2 | 18 | 7.6 |
| Ecospace, Bellandur ORR | 3.6 | 7 | 2.1 |
| Electronic City Ph 1 | 16.1 | 22 | 10.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.9 km to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 300 m to the north-west, named Vikas Tech Park Substation on OpenStreetMap |