Approvals
| Building plan (Local Planning Authority) | Sanctioned 30 Jun 2022 · No. 02/2018-19 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2 BHK Flats · avg 69 m² 57.1%3 BHK Flats · avg 87 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 30 Jun 2022 | |
| Escrow bank | Union Bank of India · Ananth Nagar Branch |
Data room
122 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Apartment have spacious 2 and 3 bhk houses
Worst experience, people have formed their own group so called association and have their own non-sense rules which we have never heard in other societies. No words to explain their way of thinking towards society and people. I think people…
Bit interior from the main road but it's good inside. New apartment.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sai Crystal in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | consent order CTE-120307 |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2025 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 89/4 | Converted 14 Jul 2015 · Deputy Commissioner, Bangalore District | |
| Sy 90/2 | Converted 19 Apr 2005 · Deputy Commissioner Bangalore District | |
| Sy 90/2 | Converted 10 Mar 2016 · Deputy Commissioner Bangalore District | |
| Survey numbers | 89/4 · 90/2 · 90/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK Flats | 48 | 746 |
| 3 BHK Flats | 36 | 934 |
| Vasuki Vallabha | about 1 km | Locked | |
|---|---|---|---|
| Sowmya Skyla | about 1 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 1 km | Locked | |
| Ramky One Karnival | about 3 km | Locked | |
| Abhee Serenity Springs | about 3.5 km | Locked | |
| Assetz Ren & Rei | about 4 km | Locked | |
| Assetz Muse & Maison | about 4 km | Locked | |
| Vistar White Pearl | about 5 km | Locked | |
| Mahidhara Harmony | about 5 km | Locked | |
| Acorn Hive | about 5.5 km | Locked | |
| Birla Evara | about 5.5 km | Locked | |
| Signature Heights | about 5.5 km | Locked |
| Sai Crystal This project | This project is the point the others are measured from | 30 Jun 2025 | – | Not verified yet |
|---|---|---|---|---|
| Vasuki Vallabha | about 1 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
| Sowmya Skyla | about 1 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
| Shriram Sapphire (Codename Ultimate) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 5.5 km, G K LAYOUT | |
| Government land in the filed surveys | Sy 90: 1% of the parent survey, 0.02 of 3.68 acres | Review |
| Nearest storm drain | about 3 km to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.13 (95 covered spaces for 84 units) | |
| Sewage plant | Treated in STP of capacity 50 KLD | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 23 Jun 2025 |
|---|
| Possession, agreement | 30 Jun 2025 | |
|---|---|---|
| Schedule end | 30 Jun 2025 | |
| RERA completion date | 30 Jun 2025 | |
| Work began, as filed | 30 Jun 2022 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall material | 6" Solid Cement block for exterior walls; 6" & 4" Solid Cement block for interior walls | |
| Wall thickness | External walls: 6"; Internal walls: 6" & 4" | |
| Concrete / steel grade | RCC grade M-200 | |
| Building heights, fire NOC | 14.95 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Wiring | Complete electrical wiring with quality wires such as Anchor Roma modular or Equivalent. | |
| Power backup | Inverter backup provision for every flat.; Generator backup for lighting in all apartments up to 1KVA | |
| Sewage plant | Treated in STP of capacity 50 KLD |
| Fire safety | Not found | |
|---|---|---|
| Environmental clearance | Not found | |
| Architect's certificate, registration | Dated 12 Jul 2023 · site inspected 1 Jul 2025 | |
| Engineer's certificate, registration | Dated 12 Jul 2023 | |
| Chartered accountant's certificate, registration | Dated 14 Jul 2023 | |
| Chartered accountant, Form 4 | Dated 8 Jul 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.82 Cr 7.4%Development · ₹22.75 Cr 92.6%
| Estimated cost, at registration | ₹24.57 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹22.75 Cr | |
| Estimated cost, chartered accountant's certificate | ₹24.57 Cr, same as the filing | |
| Cost incurred | ₹24.57 Cr | |
| Collected from buyers | ₹28.23 Cr | |
| Receivable, sold flats | ₹71.7 L |
Sold (47) 100%
| Flats sold, at completion | 47 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 47 |
| Escrow bank | Union Bank of India · Ananth Nagar Branch |
|---|
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 3 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1 km |
| 5 Nov 2028 |
| 100% (414 of 414) |
| Locked |
| Ramky One Karnival | about 3 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
|---|
| Abhee Serenity Springs | about 3.5 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
|---|
| Assetz Ren & Rei | about 4 km | 31 Jan 2029 | 73% (159 of 218) | Locked |
|---|
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 8,778 | |
| Booked | 5,078 of 8,778 (58%) | |
| Unsold | 3,700 | |
| Booked a month, pooled | 117 flats | |
| Months to sell, pooled | 31 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 3 km to the north, tertiary drain | |
|---|---|---|
| Metro, operational | about 0.5 km, Hebbagodi | |
| Metro, under construction | about 10 km, Ibbalur |
| Kempegowda Airport | 55 | 41 |
| MG Road (CBD) | 20.5 | 18.5 |
| Manyata Tech Park | 31.5 | 25 |
| ITPL, Whitefield | 27 | 18 |
| Ecospace, Bellandur ORR | 16.5 | 10.5 |
| Electronic City Ph 1 | 5 | 1.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |