Overview
Sai Nandana Marvella
Overview
Sai Nandana Marvella
Overview
Sai Nandana Marvella
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC Bengaluru · Survey 65/1
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 5 Sep 2022 · No. BBMP/Addl.Dir/JDSOUTH/0008/ 22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 89 m² 57.9%2BHK · avg 74 m² 42.1%
Location & risks
Construction & progress
Developer
Land · ₹16.25 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 5 Sep 2022 | |
| Escrow bank | STATE BANK OF INDIA · Mysuru Bank Circle, Avenue Road Bengaluru-560002. |
Data room
103 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aspire CalixiaApplied for completion 21/09/2026 | M/S. ASPIRE REAL | Plot | ~1,420–1,780 sqft (estimate: filed carpet plus 25%) | Mar 2028 |
| Brigade Komarla HeightsActive · 100% built | Brigade Group | Apartment | 366–2,142 sqft | Dec 2026 |
| Brigade Nanda HeightsActive · 100% built | Brigade Enterprises Ltd | Apartment | 990–1,550 sqft carpet (as filed) | Dec 2026 |
| Nandi BrindavanExtended to 01-03-2027 | NANDI DEVELOPERS | Apartment | – | Mar 2027 |
| Shiva SakthiActive · 45% built | SHIVASHAKTHI BUILDERS AND DEVELOPERS | Apartment | 2,315 sqft carpet (as filed) | Mar 2027 |
| Sobha ClovellyCompleted (regulator flag) | Sobha Limited | Apartment | 1,573 sqft carpet (as filed) | Completed |
| Song Of WindLapsed · completion date passed | ROYAL INDRAPRASTHA BUILDCON LLP | Apartment | 1,095 sqft carpet (as filed) | Feb 2026 |
| Usr SusowdhaCompleted · OC 29-08-2025 | USR BUILDERS AND DEVELOPERS | Apartment | 823–1,040 sqft carpet (as filed) | Completed |
All 8 other projects in Padmanabhanagar, A to Z. Status is taken from each project's own filing.
All 9 projects in Padmanabhanagar → · Sai Nandana Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sai Nandana Marvella in the interactive atlas
Transfer of the land
Title deed registered
No. SHR-1-03949-2021-22 · Book 1 · executed 24 Nov 2021
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Transfer of the land
Sale deed
in favour of Sai Nandana Properties · Survey 65/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 65/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0008/ 22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/091122/005432
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 8 of the survey sketch. Filed with K-RERA: Survey Sketch and Court Order, 8 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 65-1 | |
|---|---|---|
| Land extent, Sy 65-1 | 2 Acres 13 Guntas | |
| Land area of this registration | 4,501 sq m | |
| Khata | A Khatha · BBMP · 13 Jan 2022 | |
| Sale deed | Dated 24 Nov 2021 | |
| Sale deed in favour of | Sai Nandana Properties |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 3 Sep 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2025 |
| Land conversion | Converted 6 Dec 2004 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 65-1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 40 | 794 |
| 3BHK | 55 | 957 |
| Song Of Wind | about 0.5 km | Locked | |
|---|---|---|---|
| Garden Square | about 1.5 km | Locked | |
| Adarsh Premia | about 2 km | Locked | |
| Sobha Royal Crest | about 3 km | Locked | |
| Srivara Vasudha | about 3.5 km | Locked | |
| Mahindra Eden Phase-2 | about 4.5 km | Locked | |
| Sattva Forest Ridge | about 5 km | Locked | |
| Jhanavi Trishul Alaska | about 5.5 km | Locked | |
| Iris Courtyard | about 5.5 km | Locked | |
| Sumadhura Pramoda | about 5.5 km | Locked | |
| Platinum Landmark | about 5.5 km | Locked | |
| Samaya Sunshine | about 6 km | Locked |
| Sai Nandana Marvella This project | This project is the point the others are measured from | 30 Sep 2025 | – | Not verified yet |
|---|---|---|---|---|
| Song Of Wind | about 0.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Garden Square | about 1.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Adarsh Premia | about 2 km | 31 Mar 2027 | 55% (182 of 330) |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, VITTAL NAGAR NEAR ISRO LAYOUT, UTTARAHALLI |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.12 (106 covered spaces for 95 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 31 Jan 2025 |
|---|
Builder's schedule runs about 1 month past the promised possession date.
| Possession, agreement | 30 Sep 2025 | |
|---|---|---|
| Schedule end | 31 Oct 2025 | |
| RERA completion date | 30 Sep 2025 | |
| Work began, as filed | 1 Nov 2022 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Architect's certificate, registration | Dated 26 Sep 2022 · site inspected 23 Sep 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 26 Sep 2022 | |
| Chartered accountant's certificate, registration | Dated 12 Oct 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹54.76 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹32.42 Cr | |
| Estimated cost, chartered accountant's certificate | ₹54.76 Cr, same as the filing |
Sold (70) 73.7%Unsold (25) 26.3%
| Flats sold, at completion | 70 | |
|---|---|---|
| Flats unsold, at completion | 25 | |
| Flats in the phase | 95 |
| Escrow bank | STATE BANK OF INDIA · Mysuru Bank Circle, Avenue Road Bengaluru-560002. |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Locked |
| Sobha Royal Crest | about 3 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Srivara Vasudha | about 3.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Mahindra Eden Phase-2 | about 4.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Projects within 4 km, counted | 22 (22 with an approximate location) | |
|---|---|---|
| Flats in them | 3,519 | |
| Booked | 2,320 of 3,519 (66%) | |
| Unsold | 1,199 | |
| Booked a month, pooled | 64 flats | |
| Months to sell, pooled | 19 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Jaya Prakash Nagar | |
| Metro, under construction | about 5 km, J.P. Nagar 4th Phase |
| Kempegowda Airport | 45 | 36.5 |
| MG Road (CBD) | 12 | 9.5 |
| Manyata Tech Park | 20.5 | 17 |
| ITPL, Whitefield | 29 | 22 |
| Ecospace, Bellandur ORR | 17 | 14 |
| Electronic City Ph 1 | 27 | 15.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north-east | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named ISRO Layout Substation on OpenStreetMap |