Overview
Samhita Finesse
Overview
Samhita Finesse
Overview
Samhita Finesse
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
Survey 5/4
K-RERA filing, land schedule
Approvals
| Building plan (BDA) | Sanctioned 16 Jan 2025 · No. BDA/NM/AS/AA-2/TS-4/E/05/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Apartments · avg 113 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 16 Jan 2025 | |
| Escrow bank | Union Bank of India · PAI LAYOUT BANGALORE |
Data room
89 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Samhita Estates LLP's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Samhita Finesse in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner Bangalore · Survey 5/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYATH, DODDABANAHALLI · Survey 5/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/AS/AA-2/TS-4/E/05/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/040425/007650
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey .
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 18,052 sq m | |
| Extent the filed land schedule names for these survey numbers | 2,125 sq m | |
| Plot area against the filed extent | 8.5 times | |
| Land area filed with K-RERA | 2,023 sq m | |
| Village, hobli and taluk on the KGIS map | J.I.Bhandarpura, BIDARAHALLI1 hobli, BANGALORE-EAST taluk | |
| Sy. 5/4: filed extent, KGIS plot | 2,125 sq m, 18,052 sq m |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 5/4 | |
|---|---|---|
| Land extent, Sy 5/4 | 21 Guntas | |
| Whole survey numbers on the KGIS map | 18,052 sq m (the project holds a share) | |
| Land area of this registration | 2,023 sq m | |
| Khata | E Khatha · GRAMA PANCHAYATH, DODDABANAHALLI · 4 Dec 2023 | |
| Sale deed | Dated 17 Oct 2012 |
| Environmental clearance | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 3 Jan 2023 · Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | 5/4 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartments | 24 | 1,211 |
| Sold, Q2 2026-27 | 0 / 24 | |
|---|---|---|
| Unsold, Q2 2026-27 | 24 |
| Godrej Woodscapes | about 0.5 km | Locked | |
|---|---|---|---|
| Sattva Songbird | about 0.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 2 km | Locked | |
| Chaithanya Sankhya | about 3.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 3.5 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 3.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 3.5 km | Locked | |
| Godrej Splendour Phase II | about 3.5 km | Locked | |
| Neighbourhood Tree Park | about 4 km | Locked | |
| Godrej Splendour | about 4 km | Locked | |
| Godrej Parkshire (Hoskote) | about 4 km | Locked | |
| Definer Upper Deck | about 4.5 km | Locked |
| Samhita Finesse This project | This project is the point the others are measured from | 31 Dec 2028 | 0% (0 of 24) | Not verified yet |
|---|---|---|---|---|
| Godrej Woodscapes | about 0.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Sattva Songbird | about 0.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
| Assetz Bloom & Dell - Phase 2 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Commercial (business), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 4 km, TRIVENI NAGAR NEAR KR PURAM | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 2.5 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.00 (24 covered spaces for 24 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 75% · planned by 31 Dec 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Completion | 44% | |
| Completion, accountant | 33.4% of the estimated cost spent |
| Schedule end | 31 Dec 2028 | |
|---|---|---|
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 3 Apr 2025 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹8.44 Cr 31%Development · ₹18.80 Cr 69%
| Estimated cost, at registration | ₹27.24 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q1 2026-27 | ₹19.50 Cr | |
| Cost incurred | ₹6.50 Cr (33.4% of the Form 4 Q1 2026-27 estimate) |
Unsold (24) 100%
| Sold, Q3 2025-26 | 0 / 24 · 24 available | |
|---|---|---|
| Sold, Q4 2025-26 | 0 / 24 · 24 available | |
| Sold, Q1 2026-27 | 0 / 24 · 24 available | |
| Sold, Q2 2026-27 | 0 / 24 · 24 available | |
| Unsold, Q2 2026-27 | 24 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Union Bank of India · PAI LAYOUT BANGALORE | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2 km |
| 31 Oct 2027 |
| 100% (238 of 238) |
| Locked |
| Chaithanya Sankhya | about 3.5 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 3.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 3.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| Projects within 4 km, counted | 57 (57 with an approximate location) | |
|---|---|---|
| Flats in them | 23,087 | |
| Booked | 12,561 of 23,087 (54%) | |
| Unsold | 10,526 | |
| Booked a month, pooled | 287 flats | |
| Months to sell, pooled | 32 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2.5 km to the west, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Whitefield | |
| Metro, under construction | about 9 km, Saraswathi Nagar |
| Kempegowda Airport | 28.5 | 18 |
| MG Road (CBD) | 20 | 17.5 |
| Manyata Tech Park | 19.5 | 14 |
| ITPL, Whitefield | 10.5 | 6.5 |
| Ecospace, Bellandur ORR | 19.5 | 15 |
| Electronic City Ph 1 | 34.5 | 24 |
| Landfill or waste transfer station | about 2 km to the north-west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Kondaspura on OpenStreetMap |