Construction & progress
| Completion | Completed, occupancy certificate 19 May 2023 |
|---|
Developer
Loan & collateral
| Escrow bank | ICICI Bank · Commissariat Branch |
|---|
Data room
62 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aarna RajpathLapsed · completion date passed | AARNA PROJECTS | Mixed development | – | Apr 2025 |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Aikya OrchidCompleted · OC 06-05-2024 | AIKYA PROMOTERS AND CONSTRUCTIONS | Apartment | 840–1,049 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm PristineLapsed · completion date passed | B M DEVELOPERS | Apartment | – | Jul 2016 |
| Camellia VitalActive · 28% built | Camellia Infrastructures | Apartment | 962 sqft carpet (as filed) | Mar 2028 |
8 of 51 other projects in Varthur, A to Z. Status is taken from each project's own filing.
All 52 projects in Varthur → · Mysore Projects Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Serene At Brigade Cornerstone Utopia in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Fire department | Filed with the registration | |
|---|---|---|
| Airport height NOC | issued 17 Jul 2017 · permissible top elevation 974.37 m above mean sea level · validity ended 16 Jul 2022 | |
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Mar 2024 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Defect liability | 5 years |
|---|
| Poetry Of Earth | about 0.5 km | Locked |
|---|
| Inspira Infinity | about 0.5 km | Locked |
|---|
| Adarsh Park Heights Phase-2 | about 1.5 km | Locked |
|---|
| Jeevan's Allure | about 2 km | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 2 km | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 2 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 2 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 2 km | Locked |
|---|
| SOBHA Ayana | about 2 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 2 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 2.5 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 2.5 km | Locked |
|---|
| Serene At Brigade Cornerstone Utopia This project | This project is the point the others are measured from | 30 Mar 2024 | – | Not verified yet |
|---|---|---|---|---|
| Poetry Of Earth | about 0.5 km | 31 Dec 2028 | 25% (77 of 312) | Locked |
| Inspira Infinity | about 0.5 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Adarsh Park Heights Phase-2 | about 1.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
| Jeevan's Allure | about 2 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 2 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 2 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
| Projects within 4 km, counted | 92 (92 with an approximate location) | |
|---|---|---|
| Flats in them | 33,383 | |
| Booked | 18,658 of 33,383 (56%) | |
| Unsold | 14,725 | |
| Booked a month, pooled | 521 flats | |
| Months to sell, pooled | 24 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Varthur police station |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development |
| Schedule end | 30 Jun 2023 | |
|---|---|---|
| RERA completion date | 30 Mar 2024 | |
| Work began, as filed | 17 Oct 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹655.72 Cr |
|---|
Sold (1,083) 100%
| Flats sold, at completion | 1,083 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 1,083 |
| Escrow bank | ICICI Bank · Commissariat Branch | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 | |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 19 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5 km, Nallur Halli | |
| Metro, under construction | about 5 km, Kodibeesanahalli |
| Kempegowda Airport | 41 | 29.5 |
| MG Road (CBD) | 19.5 | 16 |
| Manyata Tech Park | 23.5 | 18 |
| ITPL, Whitefield | 8 | 5.5 |
| Ecospace, Bellandur ORR | 9.5 | 7 |
| Electronic City Ph 1 | 20.5 | 13 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |