A wonderful place located right next to the Bangalore to Dharmapuri highway.
Overview
Signature Regal
Overview
Signature Regal
Overview
Signature Regal
Overview
Photo: Mahesh mahiTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 11 | ||||
| 11/1 | 22 Apr 2025Deputy Commissioner, Bengaluru District | No sale deed | 22 Apr 2025A Khatha · Revenue Inspector | 0-14 Guntas |
| 11/2 | 19 Feb 2020 | |||
Approvals
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 9 Jul 2026 · No. STRRPA/TP/CC/100/2026-27/855 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3 BHK Flats · avg 112 m² 69.5%2 BHK Flats · avg 83 m²
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 9 Jul 2026 | |
| Escrow bank | KOTAK MAHINDRA BANK · Jakkasandra |
Data room
180 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
A wonderful place located right next to the Bangalore to Dharmapuri highway.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed | Aswani Properties India Pvt Ltd | Apartment | 377 sqft carpet (as filed) | Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 67 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
All 72 projects in Hosur Road → · Signature Dwellings Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Signature Regal in the interactive atlas
| No sale deed |
| 15 Nov 2024E Khatha · PDO |
| 1 Acre 05 Guntas |
| 11/3, 11/4 | 6 Nov 2020Deputy Commissioner, Bengaluru District | No sale deed | 15 Nov 2024E Khatha · PDO | 0-19 Guntas + 0-30 Guntas |
|---|
| 11/5 | 24 Sep 2020Deputy Commissioner, Bengaluru District | No sale deed | 15 Nov 2024E Khatha · PDO | 0-30 Guntas |
|---|
| 11/6 | 5 Feb 2025Deputy Commissioner, Bengaluru District | No sale deed | 5 Feb 2025A Khatha · Revenue Inspector | 0-14 Guntas |
|---|
| Survey 12 | ||||
|---|---|---|---|---|
| 12/2A | 18 Apr 2011Special Deputy Commissioner, Bengaluru District | No sale deed | 15 Nov 2024E Khatha · PDO | 1 Acre 16 Guntas |
| 12/2B | 24 Jun 2017Deputy Commissioner, Bengaluru District | No sale deed | 15 Nov 2024E Khatha · PDO | 0-39.08 Guntas |
| 12/2C | 14 Jul 2025Deputy Commissioner, Bengaluru District | No sale deed | 16 Mar 2011A Khatha · Revenue Inspector | 0-39.08 Guntas |
| Survey 225 | ||||
|---|---|---|---|---|
| 225/1 | 5 Feb 2025Deputy Commissioner, Bengaluru District | No sale deed | 24 Nov 2023A Khatha · Revenue Inspector | 0-23.08 Guntas |
| 225/3 | 22 Apr 2025Deputy Commissioner, Bengaluru District | No sale deed | 24 Nov 2023A Khatha · Revenue Inspector | 0-23.08 Guntas |
K-RERA filing, land schedule
The whole project
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/CC/100/2026-27/855
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/040926/008911
K-RERA registration ·
Approval or registration
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the survey sketch. Filed with K-RERA: Joint Sketch Village Map and CDP.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 11/1, 11/2, 11/3, 11/4, 11/5, 11/6 and 5 more | |
|---|---|---|
| Land area of this registration | 30,412 sq m | |
| Khata | A Khatha · Revenue Inspector · 22 Apr 2025; E Khatha · PDO · 15 Nov 2024; A Khatha · Revenue Inspector · 5 Feb 2025; and 2 more |
| Fire NOC | Filed with the registration |
|---|
| Environmental clearance | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| Clearances pending | 1, in the latest update | Review |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jul 2031 |
| Land conversion | 11 of 11 parcels converted | |
|---|---|---|
| Sy 11/1, 225/3 | Converted 22 Apr 2025 · Deputy Commissioner, Bengaluru District | |
| Sy 11/2 | Converted 19 Feb 2020 · Deputy Commissioner, Bengaluru District | |
| Sy 11/3, 11/4 | Converted 6 Nov 2020 · Deputy Commissioner, Bengaluru District | |
| Sy 11/5 | Converted 24 Sep 2020 · Deputy Commissioner, Bengaluru District | |
| Sy 11/6, 225/1 | Converted 5 Feb 2025 · Deputy Commissioner, Bengaluru District | |
| Sy 12/2A | Converted 18 Apr 2011 · Special Deputy Commissioner, Bengaluru District | |
| Other parcels | 2 more groups on the filing | |
| Survey numbers | 11/1 · 11/2 · 11/3 · 11/4 · 11/5 · 11/6 · 12/2A · 12/2B · 12/2C · 225/1 · 225/3 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK Flats | 180 | 897 |
| 3 BHK Flats | 410 | 1,200 |
| Sold, Q2 2026-27 | 8 / 590 | |
|---|---|---|
| Unsold, Q2 2026-27 | 582 |
| Columbia Aaltius | about 0.5 km, to a locality centre | Locked | |
|---|---|---|---|
| Shriram 107southeast - Phase 3 | about 2 km | Locked | |
| SOBHA Townpark | about 2.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 2.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 2.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 2.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 2.5 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 3 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 3 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 3 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 3 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 3 km | Locked |
| Signature Regal This project | This project is the point the others are measured from | 31 Jul 2031 | 1% (8 of 590) | Not verified yet |
|---|---|---|---|---|
| Columbia Aaltius | about 0.5 km, to a locality centre | 30 Sep 2026 | 54% (89 of 165) | Locked |
| Shriram 107southeast - Phase 3 | about 2 km | 7 Jan 2027 | 100% (1,055 of 1,055) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 14.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.68 (991 covered spaces for 590 units) | |
| Power backup | Declared by the promoter |
| Main structure | Not started · planned by 31 Mar 2030 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Mar 2031 | |
| Club house | Not started | |
| Completion | 5% |
| Schedule end | 30 Jun 2031 | |
|---|---|---|
| RERA completion date | 31 Jul 2031 | |
| Work began, as filed | 1 Aug 2026 |
| Building heights, fire NOC | 68.4 m filed, 5 towers |
|---|
| Power backup | Provided, 150 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹8.63 Cr 2.4%Development · ₹351.94 Cr 97.6%
| Estimated cost, at registration | ₹360.57 Cr | |
|---|---|---|
| Cost left | ₹326.21 Cr |
Sold (8) 1.4%Unsold (582) 98.6%
| Sold, Q2 2026-27 | 8 / 590 · 582 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 582 |
| Escrow bank | KOTAK MAHINDRA BANK · Jakkasandra | |
|---|---|---|
| Designated account, collected | ₹54.8 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹33.9 L in Q2 2026-27 (62% of that quarter's deposits) |
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 6 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 8 | |
| With a filed extension or completion | 6 (6 completed, 0 extended) | |
| Average schedule slip | 7 months early |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SOBHA Townpark |
|---|
| about 2.5 km |
| 30 Jun 2033 |
| 51% (250 of 492) |
| Locked |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 2.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 2.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 2.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Projects within 4 km, counted | 22 (22 with an approximate location) | |
|---|---|---|
| Flats in them | 6,757 | |
| Booked | 4,777 of 6,757 (71%) | |
| Unsold | 1,980 | |
| Booked a month, pooled | 100 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Local Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 8 km, Bommasandra | |
| Metro, under construction | about 19 km, Ibbalur |
| Kempegowda Airport | 63.5 | 48 |
| MG Road (CBD) | 29 | 27.5 |
| Manyata Tech Park | 39.5 | 33.5 |
| ITPL, Whitefield | 33 | 24.5 |
| Ecospace, Bellandur ORR | 27 | 18.5 |
| Electronic City Ph 1 | 11.5 | 10 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Attibele on OpenStreetMap |