Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Nov 2018 |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹5.26 Cr 11.6%Development · ₹40.00 Cr 88.4%
Loan & collateral
| Escrow bank | ICICI Bank · Thanisandra |
|---|
Data room
39 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Spacious rooms in a decent society with average amenities in a well connected locality.
Packing is very good and while transporting, removing everything is wonderful, guys were awesome
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Affinity BrundaavanaExtended to 01-04-2027 | AFFINITY PROJECTS | Apartment | 775–1,609 sqft carpet (as filed) | Apr 2027 |
| Alpine Pyramid - IrisActive · 42% built | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 729–1,004 sqft carpet (as filed) | Apr 2028 |
| Amigo EstellaCompleted · OC 06-04-2023 | AMIGOESTELLA INDIA LLP | Apartment | – | Completed |
| Arvind SporciaCompleted · OC 23-03-2018 | Arvind SmartSpaces Limited | Apartment | 3,768 sqft carpet (as filed) | Completed |
| Assetz Soho & Sky Phase 1bActive · 85% built | APG IMPERIAL HOMES PRIVATE LIMITED | Apartment | 1,370–1,886 sqft carpet (as filed) | Dec 2027 |
| Baldota SignatureCompleted · OC 29-12-2022 | BALDOTA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| BlissCompleted · OC 15-04-2023 | FINELINE INFRA PRIVATE LIMITED | Apartment | 758 sqft carpet (as filed) | Completed |
| Boulevard ResidencesCompleted · OC 27-01-2023 | SILVERTREE PROJECTS LLP | Apartment | 678–1,039 sqft carpet (as filed) | Completed |
8 of 41 other projects in Rachenahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Silver Domicile in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 9 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sumadhura Solea, price locked; Sumadhura Epitome, price locked; Lodha Mirabelle, price locked; Sattva La Vita, price locked; Assetz Soho & Sky Phase 1b, price locked; The Pearl Paradise, price locked; Vkk Grand, price locked; Assetz Soho & Sky, price locked; Adarsh Pinecourt, price locked.
| Sumadhura Solea | 630 m | Locked | |
|---|---|---|---|
| Brr North Excellency Phase I | about 0.5 km | Locked | |
| Sumadhura Epitome | 830 m | Locked | |
| Sobha City Athena | about 1.5 km | Locked | |
| Mirabelle Phase 2 | about 2 km | Locked | |
| Lodha Mirabelle | 1.8 km | Locked | |
| Sattva La Vita | 1.8 km | Locked | |
| Assetz Soho & Sky Phase 1b | 2.0 km | Locked | |
| Nava Skanda Bellavita | about 3 km | Locked | |
| Cumins Sanctum | about 3 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3 km | Locked | |
| The Pearl Paradise | 3.1 km | Locked |
| Silver Domicile This project | This project is the point the others are measured from | 30 Nov 2018 | – | Not verified yet |
|---|---|---|---|---|
| Sumadhura Solea | 630 m | 30 Jun 2029 | 14% (32 of 233) | Locked |
| Brr North Excellency Phase I | about 0.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Sumadhura Epitome | 830 m | 31 Dec 2027 | 58% (152 of 262) | Locked |
| Sobha City Athena | about 1.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
| Mirabelle Phase 2 | about 2 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Lodha Mirabelle | 1.8 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Rent, 3BHK, 3 km | ₹45,000 /mo · 33 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 79 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 38 listings | |
| Rent per sq ft, 3 km | ₹27.1 /mo, as listed · 84 listings with a size |
| Projects within 4 km, counted | 75 (43 with an approximate location) | |
|---|---|---|
| Flats in them | 17,035 | |
| Booked | 9,788 of 17,035 (57%) | |
| Unsold | 7,247 | |
| Booked a month, pooled | 234 flats | |
| Months to sell, pooled | 30 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 970 m, Telecom layout, Ashwathnagar |
| Nearest storm drain | 40 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 540 m to the east, an unnamed water body |
| Schedule end | 30 Dec 2018 | |
|---|---|---|
| RERA completion date | 30 Nov 2018 | Red flag |
| Work began, as filed | 14 Jul 2014 |
| Structure | RCC framed structure |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid tiles (floor); Glazed tiles (walls, up to 7 feet) | |
| Sanctioned load per flat | 2BHK: 3 kW; 3BHK: 5 kW | |
| Power backup | 100% power backup for common areas; Power backup in 2BHK flats: 0.5 kW |
| Estimated cost, at registration | ₹44.93 Cr |
|---|
| Escrow bank | ICICI Bank · Thanisandra |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 30 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 40 m to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 902 m above sea level, plus or minus 4 m | |
| Metro, operational | 8.4 km, Baiyappanahalli | |
| Metro, under construction | 2.8 km, Nagawara |
| Kempegowda Airport | 24.0 | 24 | 16.9 |
| MG Road (CBD) | 12.8 | 16 | 10.5 |
| Manyata Tech Park | 4.6 | 6 | 2.6 |
| ITPL, Whitefield | 20.7 | 24 | 14.2 |
| Ecospace, Bellandur ORR | 25.5 | 33 | 16.2 |
| Electronic City Ph 1 | 34.3 | 40 | 25.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.4 km to the west, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | 1.9 km to the north-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the north |